THE TIME ELEMENT IN THE STRATEGY OF ELECTRIC GRIDS IMPROVEMENT
The article considers optimization questions for parameter series of wire cross-sections as basis of overhead line unification in the strategy of electric grid improvement to allow taking into account design load variation and predicting economic parameters throughout a definite number of years and,...
Saved in:
| Date: | 2014 |
|---|---|
| Main Author: | Cherkashina, V. V. |
| Format: | Article |
| Language: | Russian |
| Published: |
National Technical University "Kharkiv Polytechnic Institute" and Аnatolii Pidhornyi Institute of Power Machines and Systems of NAS of Ukraine
2014
|
| Subjects: | |
| Online Access: | http://eie.khpi.edu.ua/article/view/2074-272X.2014.3.13 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Journal Title: | Electrical Engineering & Electromechanics |
Institution
Electrical Engineering & ElectromechanicsSimilar Items
NEURAL NETWORK MODELING IN PROBLEMS OF PREDICTION MODES OF ELECTRICAL GRIDS
by: Moroz, A. N., et al.
Published: (2016)
by: Moroz, A. N., et al.
Published: (2016)
RESEARCH AND DEVELOPMENT OF STATE-OF-THE-ART WORLD-CLASS CABLES AND WIRES IN "YUZHCABLE" WORKS PUBLIC COMPANY
by: Zolotaryov, V. M., et al.
Published: (2013)
by: Zolotaryov, V. M., et al.
Published: (2013)
A METHOD OF COMPLEX AUTOMATED MONITORING OF UKRAINIAN POWER ENERGY SYSTEM OBJECTS TO INCREASE ITS OPERATION SAFETY
by: Sokol, Ye. I., et al.
Published: (2016)
by: Sokol, Ye. I., et al.
Published: (2016)
ON THE NEED TO INCREASE THE RELIABILITY OF LINEAR INSULATORS FOR DISTRIBUTION NETWORKS 10-20 KV
by: Shumilov, Yu. N., et al.
Published: (2018)
by: Shumilov, Yu. N., et al.
Published: (2018)
A new technology for estimating time shifts in seismic monitoring of the exploitation of oil and gas fields and underground gas storage sites
by: Tyapkin, Yu. K., et al.
Published: (2018)
by: Tyapkin, Yu. K., et al.
Published: (2018)
RESEARCH INTO RELIABILITY ISSUES OF AN ELECTRIC POWER TRANSMISSION SYSTEM WITH A PHOTOVOLTAIC POWER PLAN
by: Kuchansky , V., et al.
Published: (2026)
by: Kuchansky , V., et al.
Published: (2026)
Study of the influence of the parameters of modern grounding wires on the value of power losses in them for overhead power lines of 330-750 kV
by: Krasnozhon, A. V., et al.
Published: (2023)
by: Krasnozhon, A. V., et al.
Published: (2023)
Normalization of double-circuit overhead line magnetic field inside Khrushchev building
by: Chunikhin, K. V., et al.
Published: (2021)
by: Chunikhin, K. V., et al.
Published: (2021)
Information technology of IT-infrastructure management architecture elements
by: Dovgiy, Stanislav O., et al.
Published: (2022)
by: Dovgiy, Stanislav O., et al.
Published: (2022)
AN ELECTRICAL SYSTEM FOR TESTING CROSS-LINKED POLYETHYLENE POWER CABLES OF ALL VOLTAGE CLASSES
by: Karpushenko, V. P., et al.
Published: (2013)
by: Karpushenko, V. P., et al.
Published: (2013)
THE SEVENTY YEARS’ HISTORY OF "YUZHCABLE" WORKS
by: Zolotaryov, V. M.
Published: (2013)
by: Zolotaryov, V. M.
Published: (2013)
PLANT «YUZHCABLE WORKS»: MILESTONES OF THE ROAD (75 YEARS TO PLANT «YUZHCABLE WORKS»)
by: Zolotaryov, V. M.
Published: (2018)
by: Zolotaryov, V. M.
Published: (2018)
OPTIMIZATION OF DESIGN PARAMETERS OF AUTOTRANSFORMERS IN ICE MELTING SCHEME WITH NON-INDUCTIVE CIRCUIT ON 6-10 KV OVERHEAD POWER LINES
by: Lazurenko, O. P., et al.
Published: (2019)
by: Lazurenko, O. P., et al.
Published: (2019)
A CHOICE OF CRITICAL SECTIONS OF ELECTRIC WIRES AND CABLES IN POWER CIRCUITS OF ELECTRICAL EQUIPMENT OF POWER INDUSTRY
by: Baranov, M. I.
Published: (2019)
by: Baranov, M. I.
Published: (2019)
MAGNETIC FIELD NORMALIZATION IN RESIDENTIAL BUILDING LOCATED NEAR OVERHEAD LINE BY GRID SHIELD
by: Grinchenko, V. S., et al.
Published: (2020)
by: Grinchenko, V. S., et al.
Published: (2020)
A CHOICE OF ACCEPTABLE SECTIONS OF ELECTRIC WIRES AND CABLES IN ON-BOARD CIRCUITS OF AIRCRAFT ELECTRICAL EQUIPMENT
by: Baranov, M. I.
Published: (2020)
by: Baranov, M. I.
Published: (2020)
REFINED SELECTION OF ALLOWABLE CROSS-SECTIONS OF ELECTRICAL CONDUCTORS AND CABLES IN THE POWER CIRCUITS OF INDUSTRIAL ELECTRICAL EQUIPMENT TAKING INTO ACCOUNT EMERGENCY OPERATING MODES
by: Baranov, M. I.
Published: (2019)
by: Baranov, M. I.
Published: (2019)
DIGITAL SUBSTATION COMPONENT SYSTEM "SMART GRID"
by: Vasilchenko, V. I., et al.
Published: (2014)
by: Vasilchenko, V. I., et al.
Published: (2014)
Induction arrow spatial and temporal variations
by: Rokityansky, Igor, et al.
Published: (2024)
by: Rokityansky, Igor, et al.
Published: (2024)
REACTIVE POWER CONTROL IN MICRO-GRID NETWORKS USING ADAPTIVE CONTROL
by: Moghayadniya, A., et al.
Published: (2019)
by: Moghayadniya, A., et al.
Published: (2019)
PREDICTION OF VOLTAGE FLUCTUATION IN ELECTRIC GRIDS
by: Sapryka, V. A.
Published: (2013)
by: Sapryka, V. A.
Published: (2013)
MAGNETIC-PULSE PRESSING OF ELECTRICAL CONNECTIONS FOR STRANDED WIRES
by: Samokhvalova, Zh. V., et al.
Published: (2019)
by: Samokhvalova, Zh. V., et al.
Published: (2019)
THE INVESTIGATION OF DISTRIBUTION OF THE MAGNETIC FLUX DENSITY OF OPERATING TWO-CIRCUIT POWER LINE 110 KV «CHTPP-CHERNIHIV-330» IN THE RESIDENTIAL AREA AND METHODS OF ITS DECREASING TO A SAFE LEVEL
by: Krasnozhon, A. V., et al.
Published: (2020)
by: Krasnozhon, A. V., et al.
Published: (2020)
Elements of nonlinear analysis of information streams
by: Lande, D. V., et al.
Published: (2017)
by: Lande, D. V., et al.
Published: (2017)
Determination of the correlation degree between GNSS stations of Ukraine based on time series
by: Sosonka, Iryna
Published: (2021)
by: Sosonka, Iryna
Published: (2021)
STATISTICAL PROCEDURES FOR TWO-SIDED LIMIT OF A CONTROLLED PARAMETER IN THE PROCESS OF PRODUCTION OF CABLE AND WIRE PRODUCTS
by: Golik, O. V.
Published: (2016)
by: Golik, O. V.
Published: (2016)
Smart Grid та організація інформаційного обміну в електроенергетичних системах
by: Кириленко, О.В., et al.
Published: (2012)
by: Кириленко, О.В., et al.
Published: (2012)
Перспективи використання електричних апаратів в рамках концепції Smart Grid
by: Лупіков, В.С., et al.
Published: (2012)
by: Лупіков, В.С., et al.
Published: (2012)
Network planning for narrow-band power line communication in Smart Grid
by: Yamnenko, J.S., et al.
Published: (2012)
by: Yamnenko, J.S., et al.
Published: (2012)
Experimental Strength Analysis of Variable Stiffness Waffel-Grid Cylindrical Compartments. Part 1. Experimental Procedure
by: Degtyarev, M. A., et al.
Published: (2019)
by: Degtyarev, M. A., et al.
Published: (2019)
Experimental Strength Analysis of Variable Stiffness Waffel-Grid Cylindrical Compartments. Part 1. Experimental Procedure
by: Degtyarev, M. A., et al.
Published: (2019)
by: Degtyarev, M. A., et al.
Published: (2019)
A balance-optimization model for determining the volume of coal production and import with regard for the influence of reconstruction and modernization on the technical and economic characteristics of functioning of coal mining enterprises
by: Bilan T.R.
Published: (2017)
by: Bilan T.R.
Published: (2017)
OVERLOAD CAPABILITY OF POWER CABLES IN ACTUAL POWER CONSUMPTION SYSTEMS
by: Shchebeniuk, L. A.
Published: (2013)
by: Shchebeniuk, L. A.
Published: (2013)
Approximate method for calculating the magnetic field of 330-750 kV high-voltage power line in maintenance area under voltage
by: Rozov, V. Yu., et al.
Published: (2022)
by: Rozov, V. Yu., et al.
Published: (2022)
CALCULATION AND EXPERIMENTAL DETERMINATION OF CRITICAL SECTIONS OF ELECTRIC WIRES AND CABLES IN THE CIRCUITS OF DEVICES OF HIGH-VOLTAGE HIGH-CURRENT PULSE TECHNIQUE
by: Baranov, M. I.
Published: (2019)
by: Baranov, M. I.
Published: (2019)
A CHOICE OF SECTIONS OF ELECTRIC WIRES AND CABLES IN CIRCUITS OF DEVICES OF HIGH-VOLTAGE HIGH-CURRENT IMPULSE TECHNIQUE
by: Baranov, M. I.
Published: (2018)
by: Baranov, M. I.
Published: (2018)
CALCULATION OF THE EQUIVALENT ELECTRICAL PARAMETERS OF THE INDUCTOR OF INDUCTION CHANNEL FURNACE WITH DEFECTS IN ITS LINING
by: Podoltsev, A. D., et al.
Published: (2018)
by: Podoltsev, A. D., et al.
Published: (2018)
Method of adjustment of three circuit system of active shielding of magnetic field in multi-storey buildings from overhead power lines with wires triangular arrangement
by: Kuznetsov, B. I., et al.
Published: (2022)
by: Kuznetsov, B. I., et al.
Published: (2022)
\(\mathscr{L}\)-cross-sections of the finite symmetric semigroup
by: Bondar, Eugenja
Published: (2018)
by: Bondar, Eugenja
Published: (2018)
Classification of \(\mathscr{L}\)-cross-sections of the finite symmetric semigroup up to isomorphism
by: Bondar, Eugenija
Published: (2016)
by: Bondar, Eugenija
Published: (2016)
Similar Items
-
NEURAL NETWORK MODELING IN PROBLEMS OF PREDICTION MODES OF ELECTRICAL GRIDS
by: Moroz, A. N., et al.
Published: (2016) -
RESEARCH AND DEVELOPMENT OF STATE-OF-THE-ART WORLD-CLASS CABLES AND WIRES IN "YUZHCABLE" WORKS PUBLIC COMPANY
by: Zolotaryov, V. M., et al.
Published: (2013) -
A METHOD OF COMPLEX AUTOMATED MONITORING OF UKRAINIAN POWER ENERGY SYSTEM OBJECTS TO INCREASE ITS OPERATION SAFETY
by: Sokol, Ye. I., et al.
Published: (2016) -
ON THE NEED TO INCREASE THE RELIABILITY OF LINEAR INSULATORS FOR DISTRIBUTION NETWORKS 10-20 KV
by: Shumilov, Yu. N., et al.
Published: (2018) -
A new technology for estimating time shifts in seismic monitoring of the exploitation of oil and gas fields and underground gas storage sites
by: Tyapkin, Yu. K., et al.
Published: (2018)