To the issue of forecast assessment applicable for hydrogeological conditions of techno-ecosystem at Selidove mine group

The current hydrogeological state of Selidove mine group (named after D.S. Korotchenka, Selidivs’ka, № 2 Novogrodivs’ka and № 1-3 Novogrodivs’ka) is characterized by damaged geological environment, which was derived from coal extraction. According to the geological zoning the Selidove mine group can...

Full description

Saved in:
Bibliographic Details
Date:2019
Main Authors: Ulytsky, Oleg А., Yermakov, Victor M., Lunova, Oksana V., Boiko, Katerina Y.
Format: Article
Language:Ukrainian
Published: Kyiv National University of Construction and Architecture 2019
Subjects:
Online Access:https://es-journal.in.ua/article/view/192406
Tags: Add Tag
No Tags, Be the first to tag this record!
Journal Title:Environmental safety and natural resources

Institution

Environmental safety and natural resources
id es-journalinua-article-192406
record_format ojs
institution Environmental safety and natural resources
baseUrl_str
datestamp_date 2020-02-21T12:02:37Z
collection OJS
language Ukrainian
topic techno-ecosystem
underground working galleries
broken hydrogeological conditions
mine water income
underground water transfer
hydro-geological connection
hydraulic connection
mine seam
spellingShingle techno-ecosystem
underground working galleries
broken hydrogeological conditions
mine water income
underground water transfer
hydro-geological connection
hydraulic connection
mine seam
Ulytsky, Oleg А.
Yermakov, Victor M.
Lunova, Oksana V.
Boiko, Katerina Y.
To the issue of forecast assessment applicable for hydrogeological conditions of techno-ecosystem at Selidove mine group
topic_facet техноекосистема
затоплення гірничих виробок
порушені гідрогеологічні умови
шахтний водоприплив
перетікання шахтних (підземних) вод
гідравлічний зв’язок
вугільний пласт
techno-ecosystem
underground working galleries
broken hydrogeological conditions
mine water income
underground water transfer
hydro-geological connection
hydraulic connection
mine seam
format Article
author Ulytsky, Oleg А.
Yermakov, Victor M.
Lunova, Oksana V.
Boiko, Katerina Y.
author_facet Ulytsky, Oleg А.
Yermakov, Victor M.
Lunova, Oksana V.
Boiko, Katerina Y.
author_sort Ulytsky, Oleg А.
title To the issue of forecast assessment applicable for hydrogeological conditions of techno-ecosystem at Selidove mine group
title_short To the issue of forecast assessment applicable for hydrogeological conditions of techno-ecosystem at Selidove mine group
title_full To the issue of forecast assessment applicable for hydrogeological conditions of techno-ecosystem at Selidove mine group
title_fullStr To the issue of forecast assessment applicable for hydrogeological conditions of techno-ecosystem at Selidove mine group
title_full_unstemmed To the issue of forecast assessment applicable for hydrogeological conditions of techno-ecosystem at Selidove mine group
title_sort to the issue of forecast assessment applicable for hydrogeological conditions of techno-ecosystem at selidove mine group
title_alt До питання оцінки прогнозу змін гідрогеологічних умов техноекосистеми Селидівської групи шахт
description The current hydrogeological state of Selidove mine group (named after D.S. Korotchenka, Selidivs’ka, № 2 Novogrodivs’ka and № 1-3 Novogrodivs’ka) is characterized by damaged geological environment, which was derived from coal extraction. According to the geological zoning the Selidove mine group can be classified as Donetsk hard-coal basin within Chervonoarmiqs’ka monocline damaged with tectonic framework.In this study the estimation of hydrogeological situation around the mine № 1-3 Novogrodivs’ka was performed. In undertaken the evaluation the flooding of mining galleries of № 2 Novogrodivs’ka, Selidivs’ka and, mine named after D.S. Korotchenka was taken into account. In terms of surveyor observation data the filtration of mining water from mine № 2 Novogrodivs’ka toward mine № 1 Novogrodivs’ka is possible through the nordic and south blocks, which divide the mining activities processes. The speed of flooding level change at mine № 2 Novogrodivs’ka is about 0.12 meters per day. Bearing this in mind the required time to reach the ground surface (absolute height) +185 meters is about 532 days starting from September 2019. Keeping in mind the volume of extracted underground space and the flooding factor 0.4, the common forecasted water income is about 65-130 m3 per year.In case there is a clear hydraulic connection between separate karst voids the common income of mining water from mining galleries of № 2 Novogrodivs’ka toward mine № 1 Novogrodivs’ka will be not more than 110-175 m3 per year (taking into account the value of income through the weathering zone and aquifer karst clamp).In order to maintain the safe working condition for employees and hydro safety at mine № 1-3 Novogrodivs’ka, it is required to implement the engineering and technical measures to pump the extra mining water (175m3) per year), which corresponds to water income from № 2 Novogrodivs’ka toward № 1 Novogrodivs’ka. It is ensured in case there is a perfect hydraulic connection between the karsts.
publisher Kyiv National University of Construction and Architecture
publishDate 2019
url https://es-journal.in.ua/article/view/192406
work_keys_str_mv AT ulytskyolega totheissueofforecastassessmentapplicableforhydrogeologicalconditionsoftechnoecosystematselidoveminegroup
AT yermakovvictorm totheissueofforecastassessmentapplicableforhydrogeologicalconditionsoftechnoecosystematselidoveminegroup
AT lunovaoksanav totheissueofforecastassessmentapplicableforhydrogeologicalconditionsoftechnoecosystematselidoveminegroup
AT boikokaterinay totheissueofforecastassessmentapplicableforhydrogeologicalconditionsoftechnoecosystematselidoveminegroup
AT ulytskyolega dopitannâocínkiprognozuzmíngídrogeologíčnihumovtehnoekosistemiselidívsʹkoígrupišaht
AT yermakovvictorm dopitannâocínkiprognozuzmíngídrogeologíčnihumovtehnoekosistemiselidívsʹkoígrupišaht
AT lunovaoksanav dopitannâocínkiprognozuzmíngídrogeologíčnihumovtehnoekosistemiselidívsʹkoígrupišaht
AT boikokaterinay dopitannâocínkiprognozuzmíngídrogeologíčnihumovtehnoekosistemiselidívsʹkoígrupišaht
first_indexed 2025-07-17T11:17:54Z
last_indexed 2025-07-17T11:17:54Z
_version_ 1837892711299940353
spelling es-journalinua-article-1924062020-02-21T12:02:37Z To the issue of forecast assessment applicable for hydrogeological conditions of techno-ecosystem at Selidove mine group До питання оцінки прогнозу змін гідрогеологічних умов техноекосистеми Селидівської групи шахт Ulytsky, Oleg А. Yermakov, Victor M. Lunova, Oksana V. Boiko, Katerina Y. техноекосистема затоплення гірничих виробок порушені гідрогеологічні умови шахтний водоприплив перетікання шахтних (підземних) вод гідравлічний зв’язок вугільний пласт techno-ecosystem underground working galleries broken hydrogeological conditions mine water income underground water transfer hydro-geological connection hydraulic connection mine seam The current hydrogeological state of Selidove mine group (named after D.S. Korotchenka, Selidivs’ka, № 2 Novogrodivs’ka and № 1-3 Novogrodivs’ka) is characterized by damaged geological environment, which was derived from coal extraction. According to the geological zoning the Selidove mine group can be classified as Donetsk hard-coal basin within Chervonoarmiqs’ka monocline damaged with tectonic framework.In this study the estimation of hydrogeological situation around the mine № 1-3 Novogrodivs’ka was performed. In undertaken the evaluation the flooding of mining galleries of № 2 Novogrodivs’ka, Selidivs’ka and, mine named after D.S. Korotchenka was taken into account. In terms of surveyor observation data the filtration of mining water from mine № 2 Novogrodivs’ka toward mine № 1 Novogrodivs’ka is possible through the nordic and south blocks, which divide the mining activities processes. The speed of flooding level change at mine № 2 Novogrodivs’ka is about 0.12 meters per day. Bearing this in mind the required time to reach the ground surface (absolute height) +185 meters is about 532 days starting from September 2019. Keeping in mind the volume of extracted underground space and the flooding factor 0.4, the common forecasted water income is about 65-130 m3 per year.In case there is a clear hydraulic connection between separate karst voids the common income of mining water from mining galleries of № 2 Novogrodivs’ka toward mine № 1 Novogrodivs’ka will be not more than 110-175 m3 per year (taking into account the value of income through the weathering zone and aquifer karst clamp).In order to maintain the safe working condition for employees and hydro safety at mine № 1-3 Novogrodivs’ka, it is required to implement the engineering and technical measures to pump the extra mining water (175m3) per year), which corresponds to water income from № 2 Novogrodivs’ka toward № 1 Novogrodivs’ka. It is ensured in case there is a perfect hydraulic connection between the karsts. Гідрогеологічний стан Селидівської групи шахт (ім. Д.С. Коротченка, «Селидівська», № 2 «Новогродівська» та № 1-3 «Новогродівська») характеризується умовами порушеного геологічного середовища, яке сформувалося внаслідок розробки вугільних пластів. За геологічним районуванням поля Селидівської групи шахт відносяться до Донецького кам’яновугільного басейну і розташовані в межах Красноармійської монокліналі, порушеної тектонічними структурами.Проведена оцінка гідродинамічної ситуації навколо шахти № 1-3 «Новогродівська» на етапі, який сформований в умовах затоплення гірничих виробок шахти № 2 «Новогродівська», а також шахт «Селидівська» та ім. Д.С. Коротченка. На цьому етапі за геолого-маркшейдерськими матеріалами фільтрація шахтної води з шахти № 2 «Новогродівська» у шахту № 1 «Новогродівська» можлива тільки через південний і північний бар’єрні цілики, що відокремлюють гірничі роботи цих шахт між собою. Швидкість зміни рівня затоплення у межах гірничого простору шахти № 2 «Новогродівська» становить 0,12 м/добу. За таких темпів час досягнення рівня затоплення абсолютної позначки +185 м складе 532 доби, починаючи з вересня 2019 р. При існуючих об’ємах виробленого простору в інтервалі глибин +121,1÷+185 м, існуючій швидкості затоплення, а також коефіцієнті заповнення 0,4, загальний прогнозований водоприплив до шахти № 2 «Новогродівська» становитиме 65-130 м3/год.При проявах досконалого гідравлічного зв’язку між окремими карстовими порожнинами загальна величина перетоку шахтної води із гірничих виробок шахти № 2 «Новогродівська» у гірничі виробки шахти № 1 «Новогродівська» складатиме не більше 110-175 м3/год (враховуючи неістотну величину перетікання через зону вивітрювання та водоносні палеоген-неогенові піски).Для підтримання безпечних умов праці шахтарів та гідробезпеки роботи шахти № 1-3 «Новогродівська» необхідно впровадити інженерно-технічні заходи для відкачування шахтної води в додатковому обсязі 175 м3/год, який відповідає водоприпливу із шахти № 2 «Новогродівська» до шахти № 1 «Новогродівська», що може сформуватися в умовах досконалого гідравлічного зв’язку між карстовими порожнинами. Kyiv National University of Construction and Architecture 2019-12-26 Article Article application/pdf https://es-journal.in.ua/article/view/192406 10.32347/2411-4049.2019.4.32-42 Environmental safety and natural resources; Vol. 32 No. 4 (2019): Environmental safety and natural resources; 32-42 Екологічна безпека та природокористування; Том 32 № 4 (2019): Екологічна безпека та природокористування; 32-42 2616-2121 2411-4049 10.32347/2411-4049.2019.4 uk https://es-journal.in.ua/article/view/192406/192721 Copyright (c) 2019 Oleg А. Ulytsky, Victor M. Yermakov, Oksana V. Lunova, Katerina Y. Boiko https://creativecommons.org/licenses/by/4.0