To the issue of forecast assessment applicable for hydrogeological conditions of techno-ecosystem at Selidove mine group
The current hydrogeological state of Selidove mine group (named after D.S. Korotchenka, Selidivs’ka, № 2 Novogrodivs’ka and № 1-3 Novogrodivs’ka) is characterized by damaged geological environment, which was derived from coal extraction. According to the geological zoning the Selidove mine group can...
Saved in:
Date: | 2019 |
---|---|
Main Authors: | , , , |
Format: | Article |
Language: | Ukrainian |
Published: |
Kyiv National University of Construction and Architecture
2019
|
Subjects: | |
Online Access: | https://es-journal.in.ua/article/view/192406 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Journal Title: | Environmental safety and natural resources |
Institution
Environmental safety and natural resourcesid |
es-journalinua-article-192406 |
---|---|
record_format |
ojs |
institution |
Environmental safety and natural resources |
baseUrl_str |
|
datestamp_date |
2020-02-21T12:02:37Z |
collection |
OJS |
language |
Ukrainian |
topic |
techno-ecosystem underground working galleries broken hydrogeological conditions mine water income underground water transfer hydro-geological connection hydraulic connection mine seam |
spellingShingle |
techno-ecosystem underground working galleries broken hydrogeological conditions mine water income underground water transfer hydro-geological connection hydraulic connection mine seam Ulytsky, Oleg А. Yermakov, Victor M. Lunova, Oksana V. Boiko, Katerina Y. To the issue of forecast assessment applicable for hydrogeological conditions of techno-ecosystem at Selidove mine group |
topic_facet |
техноекосистема затоплення гірничих виробок порушені гідрогеологічні умови шахтний водоприплив перетікання шахтних (підземних) вод гідравлічний зв’язок вугільний пласт techno-ecosystem underground working galleries broken hydrogeological conditions mine water income underground water transfer hydro-geological connection hydraulic connection mine seam |
format |
Article |
author |
Ulytsky, Oleg А. Yermakov, Victor M. Lunova, Oksana V. Boiko, Katerina Y. |
author_facet |
Ulytsky, Oleg А. Yermakov, Victor M. Lunova, Oksana V. Boiko, Katerina Y. |
author_sort |
Ulytsky, Oleg А. |
title |
To the issue of forecast assessment applicable for hydrogeological conditions of techno-ecosystem at Selidove mine group |
title_short |
To the issue of forecast assessment applicable for hydrogeological conditions of techno-ecosystem at Selidove mine group |
title_full |
To the issue of forecast assessment applicable for hydrogeological conditions of techno-ecosystem at Selidove mine group |
title_fullStr |
To the issue of forecast assessment applicable for hydrogeological conditions of techno-ecosystem at Selidove mine group |
title_full_unstemmed |
To the issue of forecast assessment applicable for hydrogeological conditions of techno-ecosystem at Selidove mine group |
title_sort |
to the issue of forecast assessment applicable for hydrogeological conditions of techno-ecosystem at selidove mine group |
title_alt |
До питання оцінки прогнозу змін гідрогеологічних умов техноекосистеми Селидівської групи шахт |
description |
The current hydrogeological state of Selidove mine group (named after D.S. Korotchenka, Selidivs’ka, № 2 Novogrodivs’ka and № 1-3 Novogrodivs’ka) is characterized by damaged geological environment, which was derived from coal extraction. According to the geological zoning the Selidove mine group can be classified as Donetsk hard-coal basin within Chervonoarmiqs’ka monocline damaged with tectonic framework.In this study the estimation of hydrogeological situation around the mine № 1-3 Novogrodivs’ka was performed. In undertaken the evaluation the flooding of mining galleries of № 2 Novogrodivs’ka, Selidivs’ka and, mine named after D.S. Korotchenka was taken into account. In terms of surveyor observation data the filtration of mining water from mine № 2 Novogrodivs’ka toward mine № 1 Novogrodivs’ka is possible through the nordic and south blocks, which divide the mining activities processes. The speed of flooding level change at mine № 2 Novogrodivs’ka is about 0.12 meters per day. Bearing this in mind the required time to reach the ground surface (absolute height) +185 meters is about 532 days starting from September 2019. Keeping in mind the volume of extracted underground space and the flooding factor 0.4, the common forecasted water income is about 65-130 m3 per year.In case there is a clear hydraulic connection between separate karst voids the common income of mining water from mining galleries of № 2 Novogrodivs’ka toward mine № 1 Novogrodivs’ka will be not more than 110-175 m3 per year (taking into account the value of income through the weathering zone and aquifer karst clamp).In order to maintain the safe working condition for employees and hydro safety at mine № 1-3 Novogrodivs’ka, it is required to implement the engineering and technical measures to pump the extra mining water (175m3) per year), which corresponds to water income from № 2 Novogrodivs’ka toward № 1 Novogrodivs’ka. It is ensured in case there is a perfect hydraulic connection between the karsts. |
publisher |
Kyiv National University of Construction and Architecture |
publishDate |
2019 |
url |
https://es-journal.in.ua/article/view/192406 |
work_keys_str_mv |
AT ulytskyolega totheissueofforecastassessmentapplicableforhydrogeologicalconditionsoftechnoecosystematselidoveminegroup AT yermakovvictorm totheissueofforecastassessmentapplicableforhydrogeologicalconditionsoftechnoecosystematselidoveminegroup AT lunovaoksanav totheissueofforecastassessmentapplicableforhydrogeologicalconditionsoftechnoecosystematselidoveminegroup AT boikokaterinay totheissueofforecastassessmentapplicableforhydrogeologicalconditionsoftechnoecosystematselidoveminegroup AT ulytskyolega dopitannâocínkiprognozuzmíngídrogeologíčnihumovtehnoekosistemiselidívsʹkoígrupišaht AT yermakovvictorm dopitannâocínkiprognozuzmíngídrogeologíčnihumovtehnoekosistemiselidívsʹkoígrupišaht AT lunovaoksanav dopitannâocínkiprognozuzmíngídrogeologíčnihumovtehnoekosistemiselidívsʹkoígrupišaht AT boikokaterinay dopitannâocínkiprognozuzmíngídrogeologíčnihumovtehnoekosistemiselidívsʹkoígrupišaht |
first_indexed |
2025-07-17T11:17:54Z |
last_indexed |
2025-07-17T11:17:54Z |
_version_ |
1837892711299940353 |
spelling |
es-journalinua-article-1924062020-02-21T12:02:37Z To the issue of forecast assessment applicable for hydrogeological conditions of techno-ecosystem at Selidove mine group До питання оцінки прогнозу змін гідрогеологічних умов техноекосистеми Селидівської групи шахт Ulytsky, Oleg А. Yermakov, Victor M. Lunova, Oksana V. Boiko, Katerina Y. техноекосистема затоплення гірничих виробок порушені гідрогеологічні умови шахтний водоприплив перетікання шахтних (підземних) вод гідравлічний зв’язок вугільний пласт techno-ecosystem underground working galleries broken hydrogeological conditions mine water income underground water transfer hydro-geological connection hydraulic connection mine seam The current hydrogeological state of Selidove mine group (named after D.S. Korotchenka, Selidivs’ka, № 2 Novogrodivs’ka and № 1-3 Novogrodivs’ka) is characterized by damaged geological environment, which was derived from coal extraction. According to the geological zoning the Selidove mine group can be classified as Donetsk hard-coal basin within Chervonoarmiqs’ka monocline damaged with tectonic framework.In this study the estimation of hydrogeological situation around the mine № 1-3 Novogrodivs’ka was performed. In undertaken the evaluation the flooding of mining galleries of № 2 Novogrodivs’ka, Selidivs’ka and, mine named after D.S. Korotchenka was taken into account. In terms of surveyor observation data the filtration of mining water from mine № 2 Novogrodivs’ka toward mine № 1 Novogrodivs’ka is possible through the nordic and south blocks, which divide the mining activities processes. The speed of flooding level change at mine № 2 Novogrodivs’ka is about 0.12 meters per day. Bearing this in mind the required time to reach the ground surface (absolute height) +185 meters is about 532 days starting from September 2019. Keeping in mind the volume of extracted underground space and the flooding factor 0.4, the common forecasted water income is about 65-130 m3 per year.In case there is a clear hydraulic connection between separate karst voids the common income of mining water from mining galleries of № 2 Novogrodivs’ka toward mine № 1 Novogrodivs’ka will be not more than 110-175 m3 per year (taking into account the value of income through the weathering zone and aquifer karst clamp).In order to maintain the safe working condition for employees and hydro safety at mine № 1-3 Novogrodivs’ka, it is required to implement the engineering and technical measures to pump the extra mining water (175m3) per year), which corresponds to water income from № 2 Novogrodivs’ka toward № 1 Novogrodivs’ka. It is ensured in case there is a perfect hydraulic connection between the karsts. Гідрогеологічний стан Селидівської групи шахт (ім. Д.С. Коротченка, «Селидівська», № 2 «Новогродівська» та № 1-3 «Новогродівська») характеризується умовами порушеного геологічного середовища, яке сформувалося внаслідок розробки вугільних пластів. За геологічним районуванням поля Селидівської групи шахт відносяться до Донецького кам’яновугільного басейну і розташовані в межах Красноармійської монокліналі, порушеної тектонічними структурами.Проведена оцінка гідродинамічної ситуації навколо шахти № 1-3 «Новогродівська» на етапі, який сформований в умовах затоплення гірничих виробок шахти № 2 «Новогродівська», а також шахт «Селидівська» та ім. Д.С. Коротченка. На цьому етапі за геолого-маркшейдерськими матеріалами фільтрація шахтної води з шахти № 2 «Новогродівська» у шахту № 1 «Новогродівська» можлива тільки через південний і північний бар’єрні цілики, що відокремлюють гірничі роботи цих шахт між собою. Швидкість зміни рівня затоплення у межах гірничого простору шахти № 2 «Новогродівська» становить 0,12 м/добу. За таких темпів час досягнення рівня затоплення абсолютної позначки +185 м складе 532 доби, починаючи з вересня 2019 р. При існуючих об’ємах виробленого простору в інтервалі глибин +121,1÷+185 м, існуючій швидкості затоплення, а також коефіцієнті заповнення 0,4, загальний прогнозований водоприплив до шахти № 2 «Новогродівська» становитиме 65-130 м3/год.При проявах досконалого гідравлічного зв’язку між окремими карстовими порожнинами загальна величина перетоку шахтної води із гірничих виробок шахти № 2 «Новогродівська» у гірничі виробки шахти № 1 «Новогродівська» складатиме не більше 110-175 м3/год (враховуючи неістотну величину перетікання через зону вивітрювання та водоносні палеоген-неогенові піски).Для підтримання безпечних умов праці шахтарів та гідробезпеки роботи шахти № 1-3 «Новогродівська» необхідно впровадити інженерно-технічні заходи для відкачування шахтної води в додатковому обсязі 175 м3/год, який відповідає водоприпливу із шахти № 2 «Новогродівська» до шахти № 1 «Новогродівська», що може сформуватися в умовах досконалого гідравлічного зв’язку між карстовими порожнинами. Kyiv National University of Construction and Architecture 2019-12-26 Article Article application/pdf https://es-journal.in.ua/article/view/192406 10.32347/2411-4049.2019.4.32-42 Environmental safety and natural resources; Vol. 32 No. 4 (2019): Environmental safety and natural resources; 32-42 Екологічна безпека та природокористування; Том 32 № 4 (2019): Екологічна безпека та природокористування; 32-42 2616-2121 2411-4049 10.32347/2411-4049.2019.4 uk https://es-journal.in.ua/article/view/192406/192721 Copyright (c) 2019 Oleg А. Ulytsky, Victor M. Yermakov, Oksana V. Lunova, Katerina Y. Boiko https://creativecommons.org/licenses/by/4.0 |