Eco-energy potential of exploded quarries and risks of its use
Aim of paper to propose a semi-quantitative model for rapidly ranking disturbed industrial lands closed quarries as candidate sites for utility-scale solar plants or renewable «energy parks», explicitly accounting for engineering constraints and environmental–permitting risks. Method the study intro...
Збережено в:
| Дата: | 2025 |
|---|---|
| Автор: | |
| Формат: | Стаття |
| Мова: | Українська |
| Опубліковано: |
Kyiv National University of Construction and Architecture
2025
|
| Теми: | |
| Онлайн доступ: | https://es-journal.in.ua/article/view/351658 |
| Теги: |
Додати тег
Немає тегів, Будьте першим, хто поставить тег для цього запису!
|
| Назва журналу: | Environmental safety and natural resources |
Репозитарії
Environmental safety and natural resources| _version_ | 1856543183649898496 |
|---|---|
| author | Redko, Andrii |
| author_facet | Redko, Andrii |
| author_sort | Redko, Andrii |
| baseUrl_str | |
| collection | OJS |
| datestamp_date | 2026-02-05T18:53:19Z |
| description | Aim of paper to propose a semi-quantitative model for rapidly ranking disturbed industrial lands closed quarries as candidate sites for utility-scale solar plants or renewable «energy parks», explicitly accounting for engineering constraints and environmental–permitting risks. Method the study introduces a pre-feasibility multi-criteria screening framework and an integrated EEP score (0-100) computed from expert-rated components that reflect: solar conditions and terrain shading, geotechnical suitability, grid-connection feasibility, environmental restrictions and permitting effort, and logistics and site-related capital costs. Input evidence is derived from open-access sources and translated into risk-adjusted indicators relevant to eco-engineering decision-making. Findings – the framework was tested on two quarry sites in Ivano-Frankivsk region. The Dubivtsi site achieved EEP≈59 (moderate attractiveness) while a stricter «stop-factor» formulation yielded EEPgeo≈45, indicating barriers requiring mitigation. The Yamnitsa site demonstrated higher feasibility with EEP≈68 and EEPgeo≈46, primarily due to improved geotechnical conditions and less risky grid integration. Theoretical novelty – the paper operationalises the notion of «ecoenergy» renewable potential on degraded land by combining resource availability with infrastructure readiness and risk exposure within a single, transparent scoring construct. Practical implications – the approach supports a 1-2 week desktop screening to prioritise sites, pinpoint dominant constraints (typically grid and geotechnics), and justify targeted field investigations and EIA scoping before full feasibility studies. Originality – the proposed EEP scale and the complementary geometric («hard») aggregation enhance repeatability and penalise critical blockers, improving early-stage comparability of quarry sites. Future research should calibrate weights against realised projects, embed hydrological and slope-stability submodels. |
| first_indexed | 2026-02-08T07:59:10Z |
| format | Article |
| id | es-journalinua-article-351658 |
| institution | Environmental safety and natural resources |
| language | Ukrainian |
| last_indexed | 2026-02-08T07:59:10Z |
| publishDate | 2025 |
| publisher | Kyiv National University of Construction and Architecture |
| record_format | ojs |
| spelling | es-journalinua-article-3516582026-02-05T18:53:19Z Eco-energy potential of exploded quarries and risks of its use Екоенергетичний потенціал відпрацьованих кар’єрів і ризики його використання Redko, Andrii multi-criteria screening eco-energy potential of disturbed lands geotechnical stability solar generation багатокритеріальний скринінг екоенергетичний потенціал порушених земель геотехнічна стійкість сонячна генерація Aim of paper to propose a semi-quantitative model for rapidly ranking disturbed industrial lands closed quarries as candidate sites for utility-scale solar plants or renewable «energy parks», explicitly accounting for engineering constraints and environmental–permitting risks. Method the study introduces a pre-feasibility multi-criteria screening framework and an integrated EEP score (0-100) computed from expert-rated components that reflect: solar conditions and terrain shading, geotechnical suitability, grid-connection feasibility, environmental restrictions and permitting effort, and logistics and site-related capital costs. Input evidence is derived from open-access sources and translated into risk-adjusted indicators relevant to eco-engineering decision-making. Findings – the framework was tested on two quarry sites in Ivano-Frankivsk region. The Dubivtsi site achieved EEP≈59 (moderate attractiveness) while a stricter «stop-factor» formulation yielded EEPgeo≈45, indicating barriers requiring mitigation. The Yamnitsa site demonstrated higher feasibility with EEP≈68 and EEPgeo≈46, primarily due to improved geotechnical conditions and less risky grid integration. Theoretical novelty – the paper operationalises the notion of «ecoenergy» renewable potential on degraded land by combining resource availability with infrastructure readiness and risk exposure within a single, transparent scoring construct. Practical implications – the approach supports a 1-2 week desktop screening to prioritise sites, pinpoint dominant constraints (typically grid and geotechnics), and justify targeted field investigations and EIA scoping before full feasibility studies. Originality – the proposed EEP scale and the complementary geometric («hard») aggregation enhance repeatability and penalise critical blockers, improving early-stage comparability of quarry sites. Future research should calibrate weights against realised projects, embed hydrological and slope-stability submodels. Мета дослідження – розробити модель швидкого порівняння техногенно порушених територій (відпрацьованих кар’єрів) за придатністю до розміщення сонячних електростанцій чи енергопарків з урахуванням ключових інженерних та еколого-правових ризиків. Запропонований підхід ґрунтується на багатокритеріальному скринінгу перед техніко-економічним обґрунтуванням з формуванням інтегрального індексу екоенергетичного потенціалу EEP (0-100), який агрегує експертні оцінки п’яти груп чинників: сонячні умови та затінення, геотехнічна придатність, мережеве приєднання, екологічні обмеження, логістика та капітальні витрати. Вхідні параметри отримувалися з відкритих джерел та інтерпретувалися з позицій інженерно-екологічної безпеки. Результати апробовано на двох кар’єрах Івано-Франківської області: для ділянки поблизу с. Дубівці отримано EEP≈59 (помірна привабливість) і EEPgeo≈45 (наявність блокуючих чинників), для кар’єру поблизу с. Ямниця – EEP≈68 і EEPgeo≈46, що свідчить про вищий екоенергетичний потенціал кар’єру за рахунок кращої геотехніки та умов приєднання. Наукова новизна дослідження полягає у формалізації поняття екоенергетичний потенціал кар’єру на деградованих землях через інтеграцію ресурсних, інфраструктурних і ризикових компонентів в одному індексі. Практичне значення проведених досліджень – можливість за 1-2 тижні виконати ранжування кар’єрів, визначити проблемні місця та обґрунтувати пріоритетність детальних вишукувань і оцінки впливу на довкілля. Запропонована шкала EEP та «жорсткий» геометричний варіант, які підсилюють вплив стоп-факторів і підвищують відтворюваність попереднього відбору майданчиків. Перспективи подальших досліджень – калібрування ваг за статистикою реалізованих проєктів, деталізація геотехнічних і гідрогеологічних підмоделей. Kyiv National University of Construction and Architecture 2025-12-22 Article Article application/pdf https://es-journal.in.ua/article/view/351658 10.32347/2411-4049.2025.4.69-81 Environmental safety and natural resources; Vol. 56 No. 4 (2025): Environmental safety and natural resources; 69-81 Екологічна безпека та природокористування; Том 56 № 4 (2025): Екологічна безпека та природокористування; 69-81 2616-2121 2411-4049 10.32347/2411-4049.2025.4 uk https://es-journal.in.ua/article/view/351658/338654 Copyright (c) 2026 А.І. Редько http://creativecommons.org/licenses/by/4.0 |
| spellingShingle | multi-criteria screening eco-energy potential of disturbed lands geotechnical stability solar generation Redko, Andrii Eco-energy potential of exploded quarries and risks of its use |
| title | Eco-energy potential of exploded quarries and risks of its use |
| title_alt | Екоенергетичний потенціал відпрацьованих кар’єрів і ризики його використання |
| title_full | Eco-energy potential of exploded quarries and risks of its use |
| title_fullStr | Eco-energy potential of exploded quarries and risks of its use |
| title_full_unstemmed | Eco-energy potential of exploded quarries and risks of its use |
| title_short | Eco-energy potential of exploded quarries and risks of its use |
| title_sort | eco-energy potential of exploded quarries and risks of its use |
| topic | multi-criteria screening eco-energy potential of disturbed lands geotechnical stability solar generation |
| topic_facet | multi-criteria screening eco-energy potential of disturbed lands geotechnical stability solar generation багатокритеріальний скринінг екоенергетичний потенціал порушених земель геотехнічна стійкість сонячна генерація |
| url | https://es-journal.in.ua/article/view/351658 |
| work_keys_str_mv | AT redkoandrii ecoenergypotentialofexplodedquarriesandrisksofitsuse AT redkoandrii ekoenergetičnijpotencíalvídpracʹovanihkarêrívírizikijogovikoristannâ |