Strengthening the Capabilities of the State Nuclear Regulatory Inspectorate of Ukraine through Interaction of Ukrainian and International Technical Safety Organizations under Licensing of Long-Term Operation of South Ukraine-1

The Energy Strategy of Ukraine for the period until 2030 foresees that about half of the Ukrainian NPP units will constitute those with extended lifetime (long term operation) over the next 10 years. The first “pilot” plants for long term operation were Rivne units 1 and 2 (VVER-440/213) in 2010. So...

Повний опис

Збережено в:
Бібліографічні деталі
Дата:2015
Автори: Shugailo, O-i, Shugailo, O-r, Ryzhov, D.
Формат: Стаття
Мова:English
Опубліковано: Державне підприємство "Державний науково-технічний центр з ядерної та радіаційної безпеки" Держатомрегулювання України та НАН України 2015
Назва видання:Ядерна та радіаційна безпека
Онлайн доступ:http://dspace.nbuv.gov.ua/handle/123456789/104991
Теги: Додати тег
Немає тегів, Будьте першим, хто поставить тег для цього запису!
Назва журналу:Digital Library of Periodicals of National Academy of Sciences of Ukraine
Цитувати:Strengthening the Capabilities of the State Nuclear Regulatory Inspectorate of Ukraine through Interaction of Ukrainian and International Technical Safety Organizations under Licensing of Long-Term Operation of South Ukraine-1 / O-i Shugailo, O-r Shugailo, D. Ryzhov // Ядерна та радіаційна безпека. — 2015. — № 2. — С. 27-30. — Бібліогр.: 7 назв. — англ.

Репозитарії

Digital Library of Periodicals of National Academy of Sciences of Ukraine
Опис
Резюме:The Energy Strategy of Ukraine for the period until 2030 foresees that about half of the Ukrainian NPP units will constitute those with extended lifetime (long term operation) over the next 10 years. The first “pilot” plants for long term operation were Rivne units 1 and 2 (VVER-440/213) in 2010. South-Ukrainian NPP unit 1 (VVER-1000/V-302) is the next step in gaining long term operation experience in Ukraine (appropriate decision was taken in 2012). In both cases, the decision was preceded by many-year comprehensive activities performed by the Utility, Regulator and national and international scientific and technical support organizations, which were involved in safety substantiation from the Utility and Regulator sides.