2025-02-23T17:15:28-05:00 DEBUG: VuFindSearch\Backend\Solr\Connector: Query fl=%2A&wt=json&json.nl=arrarr&q=id%3A%22irk-123456789-111455%22&qt=morelikethis&rows=5
2025-02-23T17:15:28-05:00 DEBUG: VuFindSearch\Backend\Solr\Connector: => GET http://localhost:8983/solr/biblio/select?fl=%2A&wt=json&json.nl=arrarr&q=id%3A%22irk-123456789-111455%22&qt=morelikethis&rows=5
2025-02-23T17:15:28-05:00 DEBUG: VuFindSearch\Backend\Solr\Connector: <= 200 OK
2025-02-23T17:15:28-05:00 DEBUG: Deserialized SOLR response
Status of “ZELENOGRAD” storage ring
In 2000, after a long break, works on creation of a technological storage ring complex (TSC) have been renewed in ZELENOGRAD. TSC was developed at Budker INP of Siberian Branch of Russian Academy of Science. It consists of a linear accelerator on the electron energy up to 80 MeV, a small storage rin...
Saved in:
Main Authors: | , , , , , , , , , , , , , , , , , , , , , , , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Національний науковий центр «Харківський фізико-технічний інститут» НАН України
2008
|
Series: | Вопросы атомной науки и техники |
Subjects: | |
Online Access: | http://dspace.nbuv.gov.ua/handle/123456789/111455 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | In 2000, after a long break, works on creation of a technological storage ring complex (TSC) have been renewed in ZELENOGRAD. TSC was developed at Budker INP of Siberian Branch of Russian Academy of Science. It consists of a linear accelerator on the electron energy up to 80 MeV, a small storage ring on the energy 450 MeV, a main storage ring on the energy 2 GeV and two electron transfer lines (TL-1 and TL-2). The Main Ring (MR) with energy of electrons 2 GeV is the dedicated synchrotron radiation source intended for the decision of problem of submicron technologies and realization of various researches in a range of wavelengths of 0.2…2000 Å. Linac was mounted and put into operation during 2000-2002. The circulating electron current was received in small storage ring in 2005. Currently, the assembling of TL-2 is being completed. The inspection of the main storage ring equipment made before is carried out. Besides, a modification of all control and power supply system MR is done and a modern electronic element base will be introduced. The status and the nearest planes concerning TSC main storage ring are described. |
---|