2025-02-23T00:51:17-05:00 DEBUG: VuFindSearch\Backend\Solr\Connector: Query fl=%2A&wt=json&json.nl=arrarr&q=id%3A%22irk-123456789-136780%22&qt=morelikethis&rows=5
2025-02-23T00:51:17-05:00 DEBUG: VuFindSearch\Backend\Solr\Connector: => GET http://localhost:8983/solr/biblio/select?fl=%2A&wt=json&json.nl=arrarr&q=id%3A%22irk-123456789-136780%22&qt=morelikethis&rows=5
2025-02-23T00:51:17-05:00 DEBUG: VuFindSearch\Backend\Solr\Connector: <= 200 OK
2025-02-23T00:51:17-05:00 DEBUG: Deserialized SOLR response

Research on game scheduling of galvanizing pipe production

In this paper, we analyze and integrate the production process of "hot-dip galvanized steel pipe", the main product in the case enterprise and builds a model for the production scheduling with Cooperative Game Theory from the perspective of the enterprise. In order to get the Optimal Game...

Full description

Saved in:
Bibliographic Details
Main Authors: Yingying Li, Shaohua Dong
Format: Article
Language:English
Published: НТК «Інститут монокристалів» НАН України 2017
Series:Functional Materials
Subjects:
Online Access:http://dspace.nbuv.gov.ua/handle/123456789/136780
Tags: Add Tag
No Tags, Be the first to tag this record!
id irk-123456789-136780
record_format dspace
spelling irk-123456789-1367802018-06-17T03:05:16Z Research on game scheduling of galvanizing pipe production Yingying Li Shaohua Dong Technology In this paper, we analyze and integrate the production process of "hot-dip galvanized steel pipe", the main product in the case enterprise and builds a model for the production scheduling with Cooperative Game Theory from the perspective of the enterprise. In order to get the Optimal Game Scheduling Solution, Genetic algorithm is used and Shaply value thought and β rule allocation method are combined to solve the problem of increased profit allocation in different customers. And fair and reasonable allocation mechanism is of great significance to the stability of the coalition and enterprise development. 2017 Article Research on game scheduling of galvanizing pipe production / Yingying Li, Shaohua Dong // Functional Materials. — 2017. — Т. 24, № 3. — С. 490-495. — Бібліогр.: 11 назв. — англ. 1027-5495 DOI: https://doi.org/10.15407/fm24.03.490 http://dspace.nbuv.gov.ua/handle/123456789/136780 en Functional Materials НТК «Інститут монокристалів» НАН України
institution Digital Library of Periodicals of National Academy of Sciences of Ukraine
collection DSpace DC
language English
topic Technology
Technology
spellingShingle Technology
Technology
Yingying Li
Shaohua Dong
Research on game scheduling of galvanizing pipe production
Functional Materials
description In this paper, we analyze and integrate the production process of "hot-dip galvanized steel pipe", the main product in the case enterprise and builds a model for the production scheduling with Cooperative Game Theory from the perspective of the enterprise. In order to get the Optimal Game Scheduling Solution, Genetic algorithm is used and Shaply value thought and β rule allocation method are combined to solve the problem of increased profit allocation in different customers. And fair and reasonable allocation mechanism is of great significance to the stability of the coalition and enterprise development.
format Article
author Yingying Li
Shaohua Dong
author_facet Yingying Li
Shaohua Dong
author_sort Yingying Li
title Research on game scheduling of galvanizing pipe production
title_short Research on game scheduling of galvanizing pipe production
title_full Research on game scheduling of galvanizing pipe production
title_fullStr Research on game scheduling of galvanizing pipe production
title_full_unstemmed Research on game scheduling of galvanizing pipe production
title_sort research on game scheduling of galvanizing pipe production
publisher НТК «Інститут монокристалів» НАН України
publishDate 2017
topic_facet Technology
url http://dspace.nbuv.gov.ua/handle/123456789/136780
citation_txt Research on game scheduling of galvanizing pipe production / Yingying Li, Shaohua Dong // Functional Materials. — 2017. — Т. 24, № 3. — С. 490-495. — Бібліогр.: 11 назв. — англ.
series Functional Materials
work_keys_str_mv AT yingyingli researchongameschedulingofgalvanizingpipeproduction
AT shaohuadong researchongameschedulingofgalvanizingpipeproduction
first_indexed 2023-10-18T21:14:13Z
last_indexed 2023-10-18T21:14:13Z
_version_ 1796152279713185792