Modeling the drainage facilities operation at the prospective construction site on the Dnipro floodland
Purpose. To carry out predictive assessment of the hydrodynamic regime at the prospective construction site on the Dnipro floodland in order to choose an expedient drainage system and substantiate the drainage parameters. Findings. The main mode-forming factors of the investigated territory have bee...
Збережено в:
Дата: | 2017 |
---|---|
Автори: | , , , |
Формат: | Стаття |
Мова: | English |
Опубліковано: |
УкрНДМІ НАН України, Інститут геотехнічної механіки НАН України
2017
|
Назва видання: | Розробка родовищ |
Онлайн доступ: | http://dspace.nbuv.gov.ua/handle/123456789/145690 |
Теги: |
Додати тег
Немає тегів, Будьте першим, хто поставить тег для цього запису!
|
Назва журналу: | Digital Library of Periodicals of National Academy of Sciences of Ukraine |
Цитувати: | Modeling the drainage facilities operation at the prospective construction site on the Dnipro floodland / V. Tymoshchuk, Ye. Sherstiuk, Z. Niedbalski, Т. Morozova // Розробка родовищ: Зб. наук. пр. — 2017. — Т. 11, вип. 2. — С. 34-40. — Бібліогр.: 8 назв. — англ. |
Репозитарії
Digital Library of Periodicals of National Academy of Sciences of UkraineРезюме: | Purpose. To carry out predictive assessment of the hydrodynamic regime at the prospective construction site on the Dnipro floodland in order to choose an expedient drainage system and substantiate the drainage parameters. Findings. The main mode-forming factors of the investigated territory have been determined using the results of analysis and generalization of the data related to geological structure and hydrogeological conditions. The general hydrodynamic scheme of the simulated area has been developed, the structure of geofiltration model has been justified, its initial and boundary conditions have been determined. Predictive estimation of groundwater level regime has been executed, comparative analysis of vertical and bed drainage efficiency with various schemes of drainage element layouts has been carried out by simulation. The efficiency of the drainage structures operation in the protected area has been estimated for high-level flood conditions at the set water level in the Dnipro. |
---|