2025-02-23T14:38:18-05:00 DEBUG: VuFindSearch\Backend\Solr\Connector: Query fl=%2A&wt=json&json.nl=arrarr&q=id%3A%22irk-123456789-195449%22&qt=morelikethis&rows=5
2025-02-23T14:38:18-05:00 DEBUG: VuFindSearch\Backend\Solr\Connector: => GET http://localhost:8983/solr/biblio/select?fl=%2A&wt=json&json.nl=arrarr&q=id%3A%22irk-123456789-195449%22&qt=morelikethis&rows=5
2025-02-23T14:38:18-05:00 DEBUG: VuFindSearch\Backend\Solr\Connector: <= 200 OK
2025-02-23T14:38:18-05:00 DEBUG: Deserialized SOLR response

Analysis of reliability of the automatic core protection function of the reactor V-412 in response to local parameters: maximum linear power, departure from nucleate boiling ratio

The research subject is finding an engineering solution for V-412 core automatic protection during operation in both steady-state and transient conditions within ICIS using local parameters (i.e. maximum linear power, departure from nucleate boiling ratio). Such engineering solution will be implemen...

Full description

Saved in:
Bibliographic Details
Main Authors: Lys, S.S., Semerak, M.M., Kanyuka, A.I.
Format: Article
Language:English
Published: Національний науковий центр «Харківський фізико-технічний інститут» НАН України 2021
Series:Вопросы атомной науки и техники
Subjects:
Online Access:http://dspace.nbuv.gov.ua/handle/123456789/195449
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The research subject is finding an engineering solution for V-412 core automatic protection during operation in both steady-state and transient conditions within ICIS using local parameters (i.e. maximum linear power, departure from nucleate boiling ratio). Such engineering solution will be implemented by safety system software-hardware (PTK-Z) on the basis of signals coming from in-core neutron flux detectors, temperature sensors, primary coolant flow and coolant pressure transducers. Calculated survey of possibility to use Kalman filters or corrective filter to eliminate time delay in SPND signals was carried out. The inaccuracy in the method of maximum linear power monitoring was determined. This work shows that the solution was found using the practice of in-core instrumentation, and ICIS designing and operation with improved metrology, reliability and time parameters and using advanced data communication technologies intended for important challenges of the world market, and as a response to standards.