Алгоритми наближеного розв’язання багатостадійних Flow-Shop-Problem

The construction of multi-stage schedules for performing tasks on machines located in a sequential chain has many practical applications in discrete-production scheduling. Estimates are obtained for the lower bound of the performance criterion for the optimal sequence of tasks and 2 algorithms for a...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Datum:2019
1. Verfasser: Zack, Yuriy A.
Format: Artikel
Sprache:Russisch
Veröffentlicht: The National Technical University of Ukraine "Igor Sikorsky Kyiv Polytechnic Institute" 2019
Schlagworte:
Online Zugang:http://journal.iasa.kpi.ua/article/view/184652
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Назва журналу:System research and information technologies

Institution

System research and information technologies
Beschreibung
Zusammenfassung:The construction of multi-stage schedules for performing tasks on machines located in a sequential chain has many practical applications in discrete-production scheduling. Estimates are obtained for the lower bound of the performance criterion for the optimal sequence of tasks and 2 algorithms for approximate problem solving, ensuring that all work is performed at all stages of processing in the shortest possible time. The algorithms of the solution are illustrated by a numerical example. The estimates of the complexity of the proposed algorithms are given. The given algorithms for solving the problem can be used in the scheduling of the small- and medium-sized discrete production.