On the management of seismic activity
The problem of seismic hazard decrease with the help of artificial sources, mainly the powerful impulse MHD-generator is considered. It has been shown that powerful electric impulses during their action on source zones are able to provoke strong earthquakes before their natural term. A review of the...
Saved in:
| Date: | 2013 |
|---|---|
| Main Authors: | Strakhov, V.N., Savin, M. G. |
| Format: | Article |
| Language: | Russian |
| Published: |
S. Subbotin Institute of Geophysics of the NAS of Ukraine
2013
|
| Online Access: | https://journals.uran.ua/geofizicheskiy/article/view/116448 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Journal Title: | Geofizicheskiy Zhurnal |
Institution
Geofizicheskiy ZhurnalSimilar Items
Reducing seismic hazard: missed opportunities
by: Strakhov, V.N., et al.
Published: (2013)
by: Strakhov, V.N., et al.
Published: (2013)
About scientific basis of shortterm earthquake prediction
by: Strakhov, V.N., et al.
Published: (2013)
by: Strakhov, V.N., et al.
Published: (2013)
Geo-environment and seismic process: problems of management
by: Shuman, V. N.
Published: (2011)
by: Shuman, V. N.
Published: (2011)
Deep processes and seismic activity
by: Gordienko, V.V.
Published: (2014)
by: Gordienko, V.V.
Published: (2014)
Electromagnetic monitoring in seismically active regions of Siberia
by: Nevedrova, N. N., et al.
Published: (2012)
by: Nevedrova, N. N., et al.
Published: (2012)
Industrial explosions and seismic activity of the Ukrainian Shield
by: Kutas, V., et al.
Published: (2014)
by: Kutas, V., et al.
Published: (2014)
Management and Development of Depository Activities Under Martial Law in Ukraine
by: Blikhar, Mariia, et al.
Published: (2024)
by: Blikhar, Mariia, et al.
Published: (2024)
Boundary of recent activation and seismicity on the platform part of Ukraine
by: Gordienko, V.V., et al.
Published: (2024)
by: Gordienko, V.V., et al.
Published: (2024)
STRATEGIC MANAGEMENT ACCOUNTING AS A TOOL TO PROMOTE COMPETITIVENESS AND EFFICIENCY OF THE ACTIVITY OF THE ENTERPRISE
by: Kuprina, N.
Published: (2017)
by: Kuprina, N.
Published: (2017)
Seismic process and up-to-date monitoring systems
by: Shuman, V.N.
Published: (2014)
by: Shuman, V.N.
Published: (2014)
Nonlinear dynamics, seismic activity and aerospace sounding systems
by: Shuman, V.
Published: (2015)
by: Shuman, V.
Published: (2015)
On the ionic and electrostatic nature of the activation of linear cloud anomalies over seismically active zones
by: Belyi, T. A., et al.
Published: (2012)
by: Belyi, T. A., et al.
Published: (2012)
Velocity model of the mantle structure under Sumatra and seismic activity of the area
by: Kendzera, A. V., et al.
Published: (2014)
by: Kendzera, A. V., et al.
Published: (2014)
On the problem of background electromagnetic-acoustic regulation of seismicity: the geoengineering aspect
by: Shuman, V.N.
Published: (2013)
by: Shuman, V.N.
Published: (2013)
INFLUENCE OF GLOBAL SEISMIC ACTIVITY ON IONOSPHERE AND NEAR-EARTH ATMOSPHERE PARAMETERS
by: Zakharov, I. G., et al.
Published: (2023)
by: Zakharov, I. G., et al.
Published: (2023)
Fractional dynamics and emissive activity of geosystems
by: Shuman, V.N.
Published: (2016)
by: Shuman, V.N.
Published: (2016)
About phenomenological models and seismic prediction: is pessimism justified, are hopes based
by: Shuman, V.N.
Published: (2013)
by: Shuman, V.N.
Published: (2013)
Hydrological features and characteristics of water management activities in the lower reaches of the Sinyukha river
by: Magas, Nataliia, et al.
Published: (2025)
by: Magas, Nataliia, et al.
Published: (2025)
The possible nature of the seismic activity of the depths of the Predobudruzhsky trough and the Northern Dobruja
by: Starostenko, V. I., et al.
Published: (2013)
by: Starostenko, V. I., et al.
Published: (2013)
Features of the dynamics of seismic activity in models of the FitzHugh-Nagumo type
by: Spirtus, V. B.
Published: (2011)
by: Spirtus, V. B.
Published: (2011)
Investigating the Impact of Training and Development Activities on the Involvement of Employees in the Human Resources Management Context
by: Ada, Nesrin, et al.
Published: (2023)
by: Ada, Nesrin, et al.
Published: (2023)
An Interconnected Human Resources Model Development of Intercultural Competence in the Educational Activities of a Manager
by: Frumkina, Aryna, et al.
Published: (2024)
by: Frumkina, Aryna, et al.
Published: (2024)
On prognostication ability of active geosystems: metastability and steady transitions instead of attractors
by: Shuman, V.N.
Published: (2016)
by: Shuman, V.N.
Published: (2016)
Seismic activity of the Dnieper-Donetsk Basin, geodeformation fields and geotectonics of its seimogenic zones
by: Shliahovyi, V.P., et al.
Published: (2025)
by: Shliahovyi, V.P., et al.
Published: (2025)
On the similarity of shear deformation of a granular massif and a fragmented medium in the seismically active area
by: Mykulyak, S. V., et al.
Published: (2021)
by: Mykulyak, S. V., et al.
Published: (2021)
Adaptive seismic studies: seismic field registration models
by: Roman, V. I., et al.
Published: (2011)
by: Roman, V. I., et al.
Published: (2011)
FINANCIAL AND ECONOMIC MANAGEMENT TOOLS FOR SUSTAINABLE FOREST MANAGEMENT
by: Khvesyk, Mykhailo, et al.
Published: (2019)
by: Khvesyk, Mykhailo, et al.
Published: (2019)
Shallow-focus seismic activity in the rear of Japan-Sakhalin insular arc and its possible tectonic nature
by: Tikhonov, I., et al.
Published: (2014)
by: Tikhonov, I., et al.
Published: (2014)
Integrating dual active bridge DC-DC converters: a novel energy management approach for hybrid renewable energy systems
by: Sabhi, K., et al.
Published: (2025)
by: Sabhi, K., et al.
Published: (2025)
Zones of recent activation of Ukraine
by: Gordienko, V.V., et al.
Published: (2020)
by: Gordienko, V.V., et al.
Published: (2020)
Satellite monitoring of clouds over deep fault zones, short-term earthquake forecast and seismic activity in Ukraine
by: Vorobiov, Anatolii, et al.
Published: (2019)
by: Vorobiov, Anatolii, et al.
Published: (2019)
Regulation of food waste management in Ukraine and abroad
by: Mikheenko, Victoria M., et al.
Published: (2021)
by: Mikheenko, Victoria M., et al.
Published: (2021)
Financial risk management with taking account of information
by: Kuznietsova, N. V.
Published: (2018)
by: Kuznietsova, N. V.
Published: (2018)
Application of scenario approach in development of management decisions (A scenario of ship formation management)
by: Додонов, О. Г., et al.
Published: (2022)
by: Додонов, О. Г., et al.
Published: (2022)
The seismicity of the Carpathians in 2022
by: Verbytskyi, S.T., et al.
Published: (2024)
by: Verbytskyi, S.T., et al.
Published: (2024)
Evolution of management – from situational to transdisciplinary
by: Stryzhak, Oleksandr Y., et al.
Published: (2019)
by: Stryzhak, Oleksandr Y., et al.
Published: (2019)
Methods of electromagnetic monitoring of the earthquake source
by: Savin, M. G., et al.
Published: (2011)
by: Savin, M. G., et al.
Published: (2011)
Seismic response of various sites of the territory of Kyiv to seismic loads
by: Kendzera, O. V., et al.
Published: (2021)
by: Kendzera, O. V., et al.
Published: (2021)
The fault-block model and the tidal trigger mechanism of the seismic process (for example, the seismicity of the Crimea)
by: Dovbnich, M. M., et al.
Published: (2010)
by: Dovbnich, M. M., et al.
Published: (2010)
Management and Marketing of the Wartime Agribusiness in Ukraine
by: Shovkun-Zablotska, Lyudmila, et al.
Published: (2024)
by: Shovkun-Zablotska, Lyudmila, et al.
Published: (2024)
Similar Items
-
Reducing seismic hazard: missed opportunities
by: Strakhov, V.N., et al.
Published: (2013) -
About scientific basis of shortterm earthquake prediction
by: Strakhov, V.N., et al.
Published: (2013) -
Geo-environment and seismic process: problems of management
by: Shuman, V. N.
Published: (2011) -
Deep processes and seismic activity
by: Gordienko, V.V.
Published: (2014) -
Electromagnetic monitoring in seismically active regions of Siberia
by: Nevedrova, N. N., et al.
Published: (2012)