Thermal and Stress-Strain State of Cast Bodies of Control Valves of 200 MW Power Units
200 MW steam turbines of DTEK Lugansk TPP units have operated for about 305–330 thousand hours with a total number of starts from 1.438 to 1,704, as of the end of 2019. The term for extending the operation of high-temperature power equipment between scheduled preventive maintenances has expired. Whe...
Saved in:
| Date: | 2020 |
|---|---|
| Main Authors: | Chernousenko, O. Yu., Ryndiuk, Dmytro V., Peshko, Vitalii A. |
| Format: | Article |
| Language: | English Russian |
| Published: |
Інститут енергетичних машин і систем ім. А. М. Підгорного Національної академії наук України
2020
|
| Subjects: | |
| Online Access: | https://journals.uran.ua/jme/article/view/212782 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Journal Title: | Journal of Mechanical Engineering |
Institution
Journal of Mechanical EngineeringSimilar Items
-
Thermal and Stress-Strain State of Cast Bodies of Control Valves of 200 MW Power Units
by: Chernousenko, O. Yu., et al.
Published: (2020) -
Assessment of Residual Service Life of Cast Bodies of Control Valves of 220 MW Power Units
by: Chernousenko, Olha Yu., et al.
Published: (2021) -
Assessment of Residual Service Life of Cast Bodies of Control Valves of 220 MW Power Units
by: Chernousenko, Olha Yu., et al.
Published: (2021) -
Re-Extension of 200 MW Turbine Cast Casing Service
by: Chernousenko, O. Yu., et al.
Published: (2019) -
Re-Extension of 200 MW Turbine Cast Casing Service
by: Chernousenko, O. Yu., et al.
Published: (2019)