Calculation Study of Thermal Stresses in the Medium-Pressure Rotor of the K-200-130 Turbine During Start-Up from a Cold State
The paper is devoted to the study of temperature and stress distribution in the medium-pressure rotor of the K-200-130 turbine, which are of considerable interest when predicting the durability of this equipment and extending its operation beyond the service life. A geometric model of the most loade...
Saved in:
| Date: | 2024 |
|---|---|
| Main Authors: | Ліщук, С. Р., Пешко, В. А. |
| Format: | Article |
| Language: | English Ukrainian |
| Published: |
Інститут енергетичних машин і систем ім. А. М. Підгорного Національної академії наук України
2024
|
| Online Access: | https://journals.uran.ua/jme/article/view/309372 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Journal Title: | Journal of Mechanical Engineering |
Institution
Journal of Mechanical EngineeringSimilar Items
Calculation Study of Thermal Stresses in the Medium-Pressure Rotor of the K-200-130 Turbine During Start-Up from a Cold State
by: Ліщук, С. Р., et al.
Published: (2024)
by: Ліщук, С. Р., et al.
Published: (2024)
Determination of long durability and residual resource of rotors of turbine K-200-130
by: Черноусенко, О. Ю.
Published: (2016)
by: Черноусенко, О. Ю.
Published: (2016)
Determination of long durability and residual resource of rotors of turbine K-200-130
by: Ju. Chernousenko
Published: (2012)
by: Ju. Chernousenko
Published: (2012)
Determination of long durability and residual resource of rotors of turbine K-200-130
by: Черноусенко, О. Ю.
Published: (2016)
by: Черноусенко, О. Ю.
Published: (2016)
K-325-23,5 steam turbine high-pressure rotor thermal and thermo-structural state during cold start-up
by: Ju. O. Bakhmutskaja, et al.
Published: (2017)
by: Ju. O. Bakhmutskaja, et al.
Published: (2017)
Determination of the Thermal and Stress-Strain State of the Medium-Pressure Rotor of the T-100/120-130 Turbine after Damage to the Blades
by: Черноусенко, О. Ю., et al.
Published: (2024)
by: Черноусенко, О. Ю., et al.
Published: (2024)
Determination of the Thermal and Stress-Strain State of the Medium-Pressure Rotor of the T-100/120-130 Turbine after Damage to the Blades
by: Черноусенко, О. Ю., et al.
Published: (2024)
by: Черноусенко, О. Ю., et al.
Published: (2024)
Features of prolongation of the service life of high- and intermediate-pressure rotors of K-200-130 steam turbine of Luhansk TPP
by: Ju. Chernousenko, et al.
Published: (2018)
by: Ju. Chernousenko, et al.
Published: (2018)
К-325-23,5 Steam Turbine High-Pressure Rotor Thermal and Thermo-structural State during cold start-up
by: Бахмутская, Ю. О., et al.
Published: (2017)
by: Бахмутская, Ю. О., et al.
Published: (2017)
К-325-23,5 Steam Turbine High-Pressure Rotor Thermal and Thermo-structural State during cold start-up
by: Бахмутская, Ю. О., et al.
Published: (2017)
by: Бахмутская, Ю. О., et al.
Published: (2017)
Thermostressed State of the Lock Joint of Turbine Rotor Blades of the First Stage of K-500-240 Steam Turbine Medium Pressure Cylinder
by: I. A. Palkov, et al.
Published: (2019)
by: I. A. Palkov, et al.
Published: (2019)
Experimental Studies of Pressure Pulsations in Draft Tube Diff user of Pump-Turbine Models for Heads up to 200 m
by: A. V. Rusanov, et al.
Published: (2024)
by: A. V. Rusanov, et al.
Published: (2024)
Manufacture of the combined welded-forged medium-pressure rotor for 325 mW steam turbine
by: A. K. Tsarjuk, et al.
Published: (2012)
by: A. K. Tsarjuk, et al.
Published: (2012)
Prolongation of Safe Operation of the K-1000-60/3000 Turbine Power Unit after Damage to the HPC Rotor
by: Черноусенко, О. Ю., et al.
Published: (2024)
by: Черноусенко, О. Ю., et al.
Published: (2024)
Prolongation of Safe Operation of the K-1000-60/3000 Turbine Power Unit after Damage to the HPC Rotor
by: Черноусенко, О. Ю., et al.
Published: (2024)
by: Черноусенко, О. Ю., et al.
Published: (2024)
Assessment of Resource Parameters of the Extended Operation High-Pressure Rotor of the K-1000-60/3000 Turbine
by: Chernousenko, Olha Yu., et al.
Published: (2019)
by: Chernousenko, Olha Yu., et al.
Published: (2019)
Assessment of Resource Parameters of the Extended Operation High-Pressure Rotor of the K-1000-60/3000 Turbine
by: Chernousenko, Olha Yu., et al.
Published: (2019)
by: Chernousenko, Olha Yu., et al.
Published: (2019)
Assessment of Resource Parameters of the Extended Operation High-Pressure Rotor of the K-1000-60/3000 Turbine
by: Yu. Chernousenko, et al.
Published: (2019)
by: Yu. Chernousenko, et al.
Published: (2019)
Thermostressed State of the Lock Joint of Turbine Rotor Blades of the First Stage of К-500-240 Steam Turbine Medium Pressure Cylinder
by: Palkov, Ihor A., et al.
Published: (2019)
by: Palkov, Ihor A., et al.
Published: (2019)
Thermostressed State of the Lock Joint of Turbine Rotor Blades of the First Stage of К-500-240 Steam Turbine Medium Pressure Cylinder
by: Palkov, Ihor A., et al.
Published: (2019)
by: Palkov, Ihor A., et al.
Published: (2019)
Insight into start-up, its action and surroundings
by: Љ. Slбvik
Published: (2018)
by: Љ. Slбvik
Published: (2018)
nvestigation of the Smooth Start-up of an Induction Motor
by: V. S. Petrushin, et al.
Published: (2018)
by: V. S. Petrushin, et al.
Published: (2018)
Changes in the Thermal and Stress-Strain State of the HPC Rotor of a Powerful NPP Turbine after the Blades Damage
by: Черноусенко, О. Ю., et al.
Published: (2023)
by: Черноусенко, О. Ю., et al.
Published: (2023)
Changes in the Thermal and Stress-Strain State of the HPC Rotor of a Powerful NPP Turbine after the Blades Damage
by: Черноусенко, О. Ю., et al.
Published: (2023)
by: Черноусенко, О. Ю., et al.
Published: (2023)
The First All-Ukrainian Contest of Philosophical Start-ups
by: I. Yasna
Published: (2019)
by: I. Yasna
Published: (2019)
Assessment of Individual Resource of High-Pressure Rotors of Nuclear Power Plants Steam Turbines
by: Черноусенко, О. Ю.
Published: (2022)
by: Черноусенко, О. Ю.
Published: (2022)
Assessment of Individual Resource of High-Pressure Rotors of Nuclear Power Plants Steam Turbines
by: Черноусенко, О. Ю.
Published: (2022)
by: Черноусенко, О. Ю.
Published: (2022)
Assessment of Individual Resource of High-Pressure Rotors of Nuclear Power Plants Steam Turbines
by: Yu. Chernousenko
Published: (2022)
by: Yu. Chernousenko
Published: (2022)
Определение длительной прочности и остаточного ресурса роторов турбины К-200-130
by: Черноусенко, О.Ю.
Published: (2012)
by: Черноусенко, О.Ю.
Published: (2012)
Electron beam welding of medium-pressure chamber of gas turbine engine
by: V. M. Nesterenkov, et al.
Published: (2015)
by: V. M. Nesterenkov, et al.
Published: (2015)
100 MeV/100 kW accelerator adjustment for the NSC KIPT Neutron Source physical start up
by: Bezditko, A.P., et al.
Published: (2020)
by: Bezditko, A.P., et al.
Published: (2020)
Start-up First Term Sheet: Stumbling Blocks to Avoid
by: A. W. Amalian, et al.
Published: (2018)
by: A. W. Amalian, et al.
Published: (2018)
Calculated determination of residual life of a turbine rotor applying different assurance coefficients
by: Шульженко, М. Г., et al.
Published: (2016)
by: Шульженко, М. Г., et al.
Published: (2016)
Calculated determination of residual life of a turbine rotor applying different assurance coefficients
by: Шульженко, М. Г., et al.
Published: (2016)
by: Шульженко, М. Г., et al.
Published: (2016)
Calculated determination of residual life of a turbine rotor applying different assurance coefficients
by: M. H. Shulzhenko, et al.
Published: (2011)
by: M. H. Shulzhenko, et al.
Published: (2011)
Mathematical modelling of starting modes of induction motors with squirrel-cage rotor
by: Malyar, V. S., et al.
Published: (2021)
by: Malyar, V. S., et al.
Published: (2021)
Mathematical modeling of rheostat-reactor start of wound-rotor induction motors
by: Malyar, V. S., et al.
Published: (2022)
by: Malyar, V. S., et al.
Published: (2022)
Rural Entrepreneurship: Between Start-ups, Hidden Champions and Family Businesses
by: J. H. Block
Published: (2019)
by: J. H. Block
Published: (2019)
To the fiftieth anniversary of starting up the first linear accelerators at NSC KIPT
by: Dovbnya, A.N., et al.
Published: (2001)
by: Dovbnya, A.N., et al.
Published: (2001)
Radio-frequency plasma start-up at Uragan-3M stellarator
by: Moiseenko, V.E., et al.
Published: (2017)
by: Moiseenko, V.E., et al.
Published: (2017)
Similar Items
-
Calculation Study of Thermal Stresses in the Medium-Pressure Rotor of the K-200-130 Turbine During Start-Up from a Cold State
by: Ліщук, С. Р., et al.
Published: (2024) -
Determination of long durability and residual resource of rotors of turbine K-200-130
by: Черноусенко, О. Ю.
Published: (2016) -
Determination of long durability and residual resource of rotors of turbine K-200-130
by: Ju. Chernousenko
Published: (2012) -
Determination of long durability and residual resource of rotors of turbine K-200-130
by: Черноусенко, О. Ю.
Published: (2016) -
K-325-23,5 steam turbine high-pressure rotor thermal and thermo-structural state during cold start-up
by: Ju. O. Bakhmutskaja, et al.
Published: (2017)