Assessment of Resource Parameters of the Extended Operation High-Pressure Rotor of the K-1000-60/3000 Turbine
The reliable operation of nuclear power plants (NPPs) is a prerequisite for the constant development of Ukraine's energy sector. At the current stage of development, a considerable part of the NPP steam turbine equipment is reaching its end-of-design-life value. The continuation of the operatio...
Saved in:
| Date: | 2019 |
|---|---|
| Main Authors: | Chernousenko, Olha Yu., Peshko, Vitalii A. |
| Format: | Article |
| Language: | English Ukrainian |
| Published: |
Інститут енергетичних машин і систем ім. А. М. Підгорного Національної академії наук України
2019
|
| Subjects: | |
| Online Access: | https://journals.uran.ua/jme/article/view/188833 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Journal Title: | Energy Technologies & Resource Saving |
Institution
Energy Technologies & Resource SavingSimilar Items
-
Assessment of Resource Parameters of the Extended Operation High-Pressure Rotor of the K-1000-60/3000 Turbine
by: Chernousenko, Olha Yu., et al.
Published: (2019) -
Assessment of Residual Service Life of Cast Bodies of Control Valves of 220 MW Power Units
by: Chernousenko, Olha Yu., et al.
Published: (2021) -
Assessment of Residual Service Life of Cast Bodies of Control Valves of 220 MW Power Units
by: Chernousenko, Olha Yu., et al.
Published: (2021) -
Re-Extension of 200 MW Turbine Cast Casing Service
by: Chernousenko, O. Yu., et al.
Published: (2019) -
Re-Extension of 200 MW Turbine Cast Casing Service
by: Chernousenko, O. Yu., et al.
Published: (2019)