Operation of T-100/120-130 cogeneration turboplant when heated network water in the heater upper stages
In case of emergency or planned repair work a method of heating turbine T-100/120-130 network with one upper heater is provided. The results of computational modeling of thermal and electrical loads of units number 1 and number 2 PLC "Kharkov HPS-5" are presented.
Gespeichert in:
| Datum: | 2015 |
|---|---|
| Hauptverfasser: | , , , , |
| Format: | Artikel |
| Sprache: | Russian |
| Veröffentlicht: |
Інститут енергетичних машин і систем ім. А. М. Підгорного Національної академії наук України
2015
|
| Schlagworte: | |
| Online Zugang: | https://journals.uran.ua/jme/article/view/48097 |
| Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
| Назва журналу: | Energy Technologies & Resource Saving |
Institution
Energy Technologies & Resource Saving| Zusammenfassung: | In case of emergency or planned repair work a method of heating turbine T-100/120-130 network with one upper heater is provided. The results of computational modeling of thermal and electrical loads of units number 1 and number 2 PLC "Kharkov HPS-5" are presented. |
|---|