Operation of T-100/120-130 cogeneration turboplant when heated network water in the heater upper stages
In case of emergency or planned repair work a method of heating turbine T-100/120-130 network with one upper heater is provided. The results of computational modeling of thermal and electrical loads of units number 1 and number 2 PLC "Kharkov HPS-5" are presented.
Saved in:
| Date: | 2015 |
|---|---|
| Main Authors: | Шубенко, А. Л., Бабенко, О. А., Голощапов, В. Н., Лыхвар, Н. В., Козлоков, А. Ю. |
| Format: | Article |
| Language: | Russian |
| Published: |
Інститут енергетичних машин і систем ім. А. М. Підгорного Національної академії наук України
2015
|
| Subjects: | |
| Online Access: | https://journals.uran.ua/jme/article/view/48097 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Journal Title: | Energy Technologies & Resource Saving |
Institution
Energy Technologies & Resource SavingSimilar Items
-
Operation of T-100/120-130 cogeneration turboplant when heated network water in the heater upper stages
by: Шубенко, А. Л., et al.
Published: (2015) -
Operation of T-100/120-130 cogeneration turboplant when heated network water in the heater upper stages
by: A. L. Shubenko, et al.
Published: (2013) -
Rotor blades efficiency increase at the last stage of steam turbines
by: Левченко, Е. В., et al.
Published: (2017) -
Rotor blades efficiency increase at the last stage of steam turbines
by: Левченко, Е. В., et al.
Published: (2017) -
The numerical analyzis for unsteady loads and elastic behaviour of the blades in seven stage axial compressor
by: Колодяжная, Л. В.
Published: (2016)