Determination of long durability and residual resource of rotors of turbine K-200-130

Experimental and settlement research of long durability of metal rotor’s steels 25Х1М1ФА steam turbines of power units by capacity 200 MWt, the 220 thousand which have fulfilled in actual practice more is conducted. It is races-even research it is based on the account of damaged according to not des...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Datum:2016
1. Verfasser: Черноусенко, О. Ю.
Format: Artikel
Sprache:Russian
Veröffentlicht: Інститут енергетичних машин і систем ім. А. М. Підгорного Національної академії наук України 2016
Schlagworte:
Online Zugang:https://journals.uran.ua/jme/article/view/67492
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Назва журналу:Energy Technologies & Resource Saving

Institution

Energy Technologies & Resource Saving
Beschreibung
Zusammenfassung:Experimental and settlement research of long durability of metal rotor’s steels 25Х1М1ФА steam turbines of power units by capacity 200 MWt, the 220 thousand which have fulfilled in actual practice more is conducted. It is races-even research it is based on the account of damaged according to not destroying control of the power equipment to experimental researches of long durability real rotor, which worked 275031 hours at total number of start-up 1182. The estimation of a residual resource of high-temperature elements of steam turbines by capacity 200 MWt is spent