2025-02-23T12:07:31-05:00 DEBUG: VuFindSearch\Backend\Solr\Connector: Query fl=%2A&wt=json&json.nl=arrarr&q=id%3A%22oai%3Aojs2.nuclear-journal.com%3Aarticle-432%22&qt=morelikethis&rows=5
2025-02-23T12:07:31-05:00 DEBUG: VuFindSearch\Backend\Solr\Connector: => GET http://localhost:8983/solr/biblio/select?fl=%2A&wt=json&json.nl=arrarr&q=id%3A%22oai%3Aojs2.nuclear-journal.com%3Aarticle-432%22&qt=morelikethis&rows=5
2025-02-23T12:07:31-05:00 DEBUG: VuFindSearch\Backend\Solr\Connector: <= 200 OK
2025-02-23T12:07:31-05:00 DEBUG: Deserialized SOLR response

Методичні аспекти ремонту за технічним станом обладнання АЕС України

The papers overviews the status of reliability-centered maintenance (RCM) of NPP equipment in the world and Ukraine. The South Ukraine NPP (SUNPP) has succeeded in RCM implementation. The SUNPP approach to RCM includes functional analysis of systems with identification of critical and non-critical e...

Full description

Saved in:
Bibliographic Details
Main Authors: Skalozubov, V., Komarov, Yu., Shendrik, N.
Format: Article
Language:Ukrainian
Published: State Scientific and Technical Center for Nuclear and Radiation Safety 2014
Online Access:https://nuclear-journal.com/index.php/journal/article/view/432
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The papers overviews the status of reliability-centered maintenance (RCM) of NPP equipment in the world and Ukraine. The South Ukraine NPP (SUNPP) has succeeded in RCM implementation. The SUNPP approach to RCM includes functional analysis of systems with identification of critical and non-critical equipment, evaluation of the turnaround time for critical equipment and evaluation of inspection periodicity for non-critical equipment. Methods for evaluating the periodicity of maintenance and inspection based on the theory of fuzzy sets and expert systems are described. The existing methodological issues are shown. Proposals are given to improve the RCM procedure for Ukrainian NPPs. They are based on statistical physics methods to determine the time to failure and on more accurate processing of fuzzy sets.