Нові напрямки в реалізації процесів управління поточним режимом навантаження ОЕС України

The absence in the structure of generating powers in UES of Ukraine with the low enough level of shunting capacity of HPP and HAPP hinders adjusting of daily power system load chart. It affects on passing of nightly dips of load chart, providing of emergency and frequency reserves, that results in d...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Datum:2013
Hauptverfasser: Dubovskoy S.V., Lenchevsky Ye.A., Babin M.E.
Format: Artikel
Sprache:Ukrainian
Veröffentlicht: General Energy Institute of the National Academy of Sciences of Ukraine 2013
Schlagworte:
Online Zugang:https://systemre.org/index.php/journal/article/view/473
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Назва журналу:System Research in Energy

Institution

System Research in Energy
id oai:www.systemre.org:article-473
record_format ojs
institution System Research in Energy
baseUrl_str
datestamp_date 2023-06-26T08:00:33Z
collection OJS
language Ukrainian
topic маневрові потужності
регіональні енергосистеми
споживачі-регулятори.
spellingShingle маневрові потужності
регіональні енергосистеми
споживачі-регулятори.
Dubovskoy S.V.
Lenchevsky Ye.A.
Babin M.E.
Нові напрямки в реалізації процесів управління поточним режимом навантаження ОЕС України
topic_facet discrete series of probabilities
frequency
power
automatic control systems.
маневрові потужності
регіональні енергосистеми
споживачі-регулятори.
format Article
author Dubovskoy S.V.
Lenchevsky Ye.A.
Babin M.E.
author_facet Dubovskoy S.V.
Lenchevsky Ye.A.
Babin M.E.
author_sort Dubovskoy S.V.
title Нові напрямки в реалізації процесів управління поточним режимом навантаження ОЕС України
title_short Нові напрямки в реалізації процесів управління поточним режимом навантаження ОЕС України
title_full Нові напрямки в реалізації процесів управління поточним режимом навантаження ОЕС України
title_fullStr Нові напрямки в реалізації процесів управління поточним режимом навантаження ОЕС України
title_full_unstemmed Нові напрямки в реалізації процесів управління поточним режимом навантаження ОЕС України
title_sort нові напрямки в реалізації процесів управління поточним режимом навантаження оес україни
title_alt New directions in the realization of management process of the load current regime in OES of Ukraine
description The absence in the structure of generating powers in UES of Ukraine with the low enough level of shunting capacity of HPP and HAPP hinders adjusting of daily power system load chart. It affects on passing of nightly dips of load chart, providing of emergency and frequency reserves, that results in diminishing of stability and reliability of work of UES of Ukraine. Under the circumstances greater part of range of adjusting of loading day's graph is carried out the coal blocks of TPP, by power 200-300 MW (which were designed for the base mode of load turn-down 20-30%, from nominal power). Every day operators of the stations disconnect to 10 power units for passing of night dip of the graph of loading, with subsequent their including for passing peaks of load in morning and evening, that results in the heavy additional tolls of fuel (to 300 thousand tons of standard fuel in a year). Amount of starting-stops of coal power units of majority TPP exceeds far an amount, settled by a manufacturer. The amount of damages of mobile power units of TPP in 3 - 4 times is higher, than of power units which work in the base mode according to statistical information.In this connection, new directions in realization of processes of management the mode of loading of grid in the night hours which are based on the use of new principles of power load automatic control of modern electro-thermal consumer-regulators (ETСR) are considered in the work. The main advantage in the use of consumer-regulators of ETСR there is that due to their use the nightly dip of loading will be eliminated, i.e. the new minimum level of loading will be created in a grid. Thus, it will allow to remove existing problems of grid, concerning the necessity of disconnecting of part of mobile power units of TPP for nightly dip of loading. In addition, will become possible to shorten the amount of power units of TPP, workings in the shunting modes.
publisher General Energy Institute of the National Academy of Sciences of Ukraine
publishDate 2013
url https://systemre.org/index.php/journal/article/view/473
work_keys_str_mv AT dubovskoysv newdirectionsintherealizationofmanagementprocessoftheloadcurrentregimeinoesofukraine
AT lenchevskyyea newdirectionsintherealizationofmanagementprocessoftheloadcurrentregimeinoesofukraine
AT babinme newdirectionsintherealizationofmanagementprocessoftheloadcurrentregimeinoesofukraine
AT dubovskoysv novínaprâmkivrealízacííprocesívupravlínnâpotočnimrežimomnavantažennâoesukraíni
AT lenchevskyyea novínaprâmkivrealízacííprocesívupravlínnâpotočnimrežimomnavantažennâoesukraíni
AT babinme novínaprâmkivrealízacííprocesívupravlínnâpotočnimrežimomnavantažennâoesukraíni
first_indexed 2025-09-24T17:33:30Z
last_indexed 2025-09-24T17:33:30Z
_version_ 1850410233093947392
spelling oai:www.systemre.org:article-4732023-06-26T08:00:33Z New directions in the realization of management process of the load current regime in OES of Ukraine Нові напрямки в реалізації процесів управління поточним режимом навантаження ОЕС України Dubovskoy S.V. Lenchevsky Ye.A. Babin M.E. discrete series of probabilities, frequency, power, automatic control systems. маневрові потужності, регіональні енергосистеми, споживачі-регулятори. The absence in the structure of generating powers in UES of Ukraine with the low enough level of shunting capacity of HPP and HAPP hinders adjusting of daily power system load chart. It affects on passing of nightly dips of load chart, providing of emergency and frequency reserves, that results in diminishing of stability and reliability of work of UES of Ukraine. Under the circumstances greater part of range of adjusting of loading day's graph is carried out the coal blocks of TPP, by power 200-300 MW (which were designed for the base mode of load turn-down 20-30%, from nominal power). Every day operators of the stations disconnect to 10 power units for passing of night dip of the graph of loading, with subsequent their including for passing peaks of load in morning and evening, that results in the heavy additional tolls of fuel (to 300 thousand tons of standard fuel in a year). Amount of starting-stops of coal power units of majority TPP exceeds far an amount, settled by a manufacturer. The amount of damages of mobile power units of TPP in 3 - 4 times is higher, than of power units which work in the base mode according to statistical information.In this connection, new directions in realization of processes of management the mode of loading of grid in the night hours which are based on the use of new principles of power load automatic control of modern electro-thermal consumer-regulators (ETСR) are considered in the work. The main advantage in the use of consumer-regulators of ETСR there is that due to their use the nightly dip of loading will be eliminated, i.e. the new minimum level of loading will be created in a grid. Thus, it will allow to remove existing problems of grid, concerning the necessity of disconnecting of part of mobile power units of TPP for nightly dip of loading. In addition, will become possible to shorten the amount of power units of TPP, workings in the shunting modes. Незбалансованість структури генеруючих потужностей в ОЕС України із достатньо низьким рівнем маневрових потужностей ГЕС і ГАЕС перешкоджає регулюванню добового графіка навантаження, проходженню нічних провалів навантаження, забезпеченню аварійних та частотних резервів, що призводить до зниження стійкості і надійності роботи ОЕС України. За цих умов регулювання значної частини діапазону добового графіка навантаження здійснюється вугільними блоками ТЕС, потужністю 200–300 МВт, що були спроектовані для базового режиму навантаження з діапазоном регулювання 20–30% від номінальної потужності. Щоденно диспетчерами станцій відключається до 10 енергоблоків для проходження нічного провалу навантаження енергосистеми, із подальшим їх включенням до мережі на ранковий та вечірній максимуми навантаження, що приводить до значних перевитрат палива (до 300 тис. тонн умовного палива на рік). Кількість пусків-зупинок вугільних енергоблоків цілої низки ТЕС значно перевищує кількість, дозволену заводом-виробником. За існуючих статистичних даних кількість виходу з ладу турбогенераторів маневрових енергоблоків ТЕС у 3-4 рази вища, ніж для енергоблоків, що працюють у базовому режимі.У зв’язку з цим, у роботі розглянуто нові напрямки реалізації процесів управління режимом навантаження енергосистеми у нічні години доби, засновані на принципах автоматичного управління потужностями навантаження сучасних електротермічних споживачів-регуляторів. Головною перевагою застосування електротермічних споживачів-регуляторів буде те, що завдяки їх застосуванню у години нічного провалу ГЕН буде створений заданий мінімальний рівень навантаження енергосистеми. Це сприятиме усуненню існуючої проблеми в енергосистемі щодо необхідності тимчасового відключення частини маневрових енергоблоків ТЕС у години нічного провалу навантаження. Крім того, стане можливим зменшити в енергосистемі і загальну кількість енергоблоків ТЕС, що працюють в маневрових режимах, чим сприяти подовженню ресурсу їх роботи. General Energy Institute of the National Academy of Sciences of Ukraine 2013-04-25 Article Article application/pdf https://systemre.org/index.php/journal/article/view/473 System Research in Energy; No. 1 (32) (2013): The Problems of General Energy; 5-13 Системні дослідження в енергетиці; № 1 (32) (2013): Проблеми загальної енергетики; 5-13 2786-7102 2786-7633 uk https://systemre.org/index.php/journal/article/view/473/408