Providing safety and safe keeping of blast furnaces lining of at blow-out and blowing in
Saved in:
| Date: | 2009 |
|---|---|
| Main Authors: | V. I. Bolshakov, N. M. Mozharenko, I. G. Muraveva |
| Format: | Article |
| Language: | English |
| Published: |
2009
|
| Series: | Metal and casting of Ukraine |
| Online Access: | http://jnas.nbuv.gov.ua/article/UJRN-0000437694 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Journal Title: | Library portal of National Academy of Sciences of Ukraine | LibNAS |
Institution
Library portal of National Academy of Sciences of Ukraine | LibNASSimilar Items
-
Problems of blowing pulverized coal into blast furnaces
by: V. N. Zakharchenko, et al.
Published: (2018) -
Main provisions blowing blast furnaces after stops of varying duration
by: A. M. Kuznetsov, et al.
Published: (2015) -
Study of heat losses in the blast furnace by blowing a horn pulverized coal
by: V. I. Andreev, et al.
Published: (2014) -
Features thermal gas-dynamic operation of the blast furnace tuyere zone by blowing into the furnace of pulverized coal and natural gas
by: A. L. Chajka, et al.
Published: (2015) -
Subsystem of prediction the duration of heating blow period in air heater blast furnace based on fuzzy knowledge base
by: E. I. Kobysh, et al.
Published: (2016)