Peculiarities of application of split T-joints in repair and reconstruction of main pipelines under service conditions
Saved in:
| Date: | 2009 |
|---|---|
| Main Authors: | V. S. But, E. A. Velikoivanenko, O. I. Olejnik |
| Format: | Article |
| Language: | English |
| Published: |
2009
|
| Series: | Automatic Welding |
| Online Access: | http://jnas.nbuv.gov.ua/article/UJRN-0000465908 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Journal Title: | Library portal of National Academy of Sciences of Ukraine | LibNAS |
Institution
Library portal of National Academy of Sciences of Ukraine | LibNASSimilar Items
Progress of technologies of arc welding repair of in-service main pipelines in Ukraine
by: V. S. But, et al.
Published: (2014)
by: V. S. But, et al.
Published: (2014)
Tendency to crack formation in welded joints of repair structures on the gas main pipelines
by: V. S. But, et al.
Published: (2014)
by: V. S. But, et al.
Published: (2014)
Evaluation of serviceability of main pipeline with a local thinning of wall in arc surfacing repair
by: E. A. Velikoivanenko, et al.
Published: (2015)
by: E. A. Velikoivanenko, et al.
Published: (2015)
Permissible pressure for filler of sealed sleeves used to repair main pipelines
by: V. I. Makhnenko, et al.
Published: (2011)
by: V. I. Makhnenko, et al.
Published: (2011)
Risk of fracture of main pipeline with defects of wall thinning in repair under pressure
by: V. I. Makhnenko, et al.
Published: (2010)
by: V. I. Makhnenko, et al.
Published: (2010)
Behaviour of hydrogen in repair welding of pressure main pipelines
by: V. I. Makhnenko, et al.
Published: (2011)
by: V. I. Makhnenko, et al.
Published: (2011)
Peculiarities of pore formation in welded joints of steam pipelines under conditions of long-time service
by: V. V. Dmitrik, et al.
Published: (2016)
by: V. V. Dmitrik, et al.
Published: (2016)
Analysis of conditions of initiation and propagation of corrosion cracks in the zone of circumferential joints of main gas pipelines
by: V. I. Makhnenko, et al.
Published: (2009)
by: V. I. Makhnenko, et al.
Published: (2009)
RESEARCH INTO METHODS OF PIPE END DEMAGNETIZATION UNDER MAIN PIPELINE REPAIR
by: Dobrodeyev, P. N.
Published: (2014)
by: Dobrodeyev, P. N.
Published: (2014)
Influence of metal shrinkage in longitudinal welds of sleeves on contact pressure in main gas pipeline repair
by: O. I. Olejnik
Published: (2015)
by: O. I. Olejnik
Published: (2015)
Development of technology of mechanized arc welding in repair of main high-pressure gas pipeline
by: O. I. Olejnik, et al.
Published: (2016)
by: O. I. Olejnik, et al.
Published: (2016)
Risk of failure during thinning of wall of main pipeline in the area of circumferential welded joints at the presence of bending moments along the axis of pipeline
by: V. I. Makhnenko, et al.
Published: (2012)
by: V. I. Makhnenko, et al.
Published: (2012)
Fatigue crack retardation by application of repair coating on gas pipelines under pressure
by: T. P. Venhryniuk
Published: (2012)
by: T. P. Venhryniuk
Published: (2012)
Towards the planning of repair of main pressure pipelines on the basis of intrapipe diagnostics results
by: A. S. Milenin
Published: (2013)
by: A. S. Milenin
Published: (2013)
Residual stresses of circumferential welds of main gas pipeline in long-term service under the North conditions
by: N. I. Golikov, et al.
Published: (2012)
by: N. I. Golikov, et al.
Published: (2012)
Methodology of numerical prediction of serviceability of pipeline elements with corrosion-erosion defects under conditions of high-temperature operation
by: A. S. Milenin, et al.
Published: (2017)
by: A. S. Milenin, et al.
Published: (2017)
Determination of contact pressure of reinforcing coupling in repair of pipelines with surface defects
by: V. I. Makhnenko, et al.
Published: (2013)
by: V. I. Makhnenko, et al.
Published: (2013)
Method of natural gas evacuation from subject to repair area of main gas pipeline
by: T. V. Bunko, et al.
Published: (2018)
by: T. V. Bunko, et al.
Published: (2018)
Optimum reduction of operating pressure in pipeline in hardfacing repair of thinning areas
by: V. I. Makhnenko, et al.
Published: (2010)
by: V. I. Makhnenko, et al.
Published: (2010)
Determination of stressed state in spiral welded joint in the main pipeline
by: L. Senkiv
Published: (2015)
by: L. Senkiv
Published: (2015)
Degradation of welded joint metal of the exploited main gas pipeline
by: O. T. Tsyrulnyk, et al.
Published: (2010)
by: O. T. Tsyrulnyk, et al.
Published: (2010)
Monitoring of technical condition of main pipelines
by: V. A. Troitskij
Published: (2017)
by: V. A. Troitskij
Published: (2017)
Development of the method for assessment of serviceability and residual life of the main pipelines with service macrodelamination
by: O. T. Tsyrulnyk, et al.
Published: (2020)
by: O. T. Tsyrulnyk, et al.
Published: (2020)
Application of method of dry welding in repair of underwater passages of gas and oil pipelines in Russia
by: Ja. Kononenko
Published: (2010)
by: Ja. Kononenko
Published: (2010)
Peculiarities of damageability of welded joints of steam pipelines by creep mechanism
by: V. V. Dmitrik, et al.
Published: (2010)
by: V. V. Dmitrik, et al.
Published: (2010)
Fractographic features of service degradation of welds in main oil pipelines
by: H. V. Krechkovska, et al.
Published: (2015)
by: H. V. Krechkovska, et al.
Published: (2015)
Development of the technology of semi-automatic arc welding for the conditions of overhaul and reconstruction of the linear part of the main gas pipelines of Ukraine
by: Yu. Maksymov, et al.
Published: (2020)
by: Yu. Maksymov, et al.
Published: (2020)
Causes of stress corrosion fracture of site circumferential joint of main gas pipeline
by: A. A. Rybakov, et al.
Published: (2014)
by: A. A. Rybakov, et al.
Published: (2014)
Structural condition and damage of metal of welded joints of steam pipelines
by: V. V. Dmytryk, et al.
Published: (2021)
by: V. V. Dmytryk, et al.
Published: (2021)
Structural condition and fatigue damageability of welded joints of steam pipelines
by: V. V. Dmytryk, et al.
Published: (2020)
by: V. V. Dmytryk, et al.
Published: (2020)
Double tape for repairing local damage protective coatings of pipelines
by: L. N. Shkaraputa, et al.
Published: (2016)
by: L. N. Shkaraputa, et al.
Published: (2016)
Mathematical Simulation of Lumped Elements Service of Main Gas Pipelines Linear Part
by: I. I. Ostapjuk
Published: (2012)
by: I. I. Ostapjuk
Published: (2012)
Structural changes in metal of welded joints of steam pipelines after long term service
by: V. V. Dmytryk, et al.
Published: (2017)
by: V. V. Dmytryk, et al.
Published: (2017)
Evaluation of serviceability of pipeline of the first contour of WWR-M reactor with defects in welded joints
by: O. V. Makhnenko, et al.
Published: (2015)
by: O. V. Makhnenko, et al.
Published: (2015)
Repair of pipelines by orbital TIG welding inside the manned space objects
by: E. G. Ternovoj, et al.
Published: (2010)
by: E. G. Ternovoj, et al.
Published: (2010)
Improvement of method of assessment of risk of fracture in the zone of wall thinning in main pipelines
by: V. I. Makhnenko, et al.
Published: (2010)
by: V. I. Makhnenko, et al.
Published: (2010)
Equipment for heat treatment of welded joints of pipelines
by: E. A. Pantelejmonov
Published: (2012)
by: E. A. Pantelejmonov
Published: (2012)
Results of implementation of orbital welding in manufacture and repair of thin-wall pipelines
by: P. D. Zhemanjuk, et al.
Published: (2017)
by: P. D. Zhemanjuk, et al.
Published: (2017)
Influence of 17HIS steel degradation on its properties after service on the main pipeline
by: Ye. V. Kharchenko, et al.
Published: (2017)
by: Ye. V. Kharchenko, et al.
Published: (2017)
The peculiarities of particles transition through split separatrix
by: Buts, V.A., et al.
Published: (2005)
by: Buts, V.A., et al.
Published: (2005)
Similar Items
-
Progress of technologies of arc welding repair of in-service main pipelines in Ukraine
by: V. S. But, et al.
Published: (2014) -
Tendency to crack formation in welded joints of repair structures on the gas main pipelines
by: V. S. But, et al.
Published: (2014) -
Evaluation of serviceability of main pipeline with a local thinning of wall in arc surfacing repair
by: E. A. Velikoivanenko, et al.
Published: (2015) -
Permissible pressure for filler of sealed sleeves used to repair main pipelines
by: V. I. Makhnenko, et al.
Published: (2011) -
Risk of fracture of main pipeline with defects of wall thinning in repair under pressure
by: V. I. Makhnenko, et al.
Published: (2010)