Results of implementation of orbital welding in manufacture and repair of thin-wall pipelines
Saved in:
| Date: | 2017 |
|---|---|
| Main Authors: | P. D. Zhemanjuk, I. A. Petrik, S. L. Chigilejchik |
| Format: | Article |
| Language: | English |
| Published: |
2017
|
| Series: | Automatic Welding |
| Online Access: | http://jnas.nbuv.gov.ua/article/UJRN-0000770439 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Journal Title: | Library portal of National Academy of Sciences of Ukraine | LibNAS |
Institution
Library portal of National Academy of Sciences of Ukraine | LibNASSimilar Items
Repair of pipelines by orbital TIG welding inside the manned space objects
by: E. G. Ternovoj, et al.
Published: (2010)
by: E. G. Ternovoj, et al.
Published: (2010)
Risk of fracture of main pipeline with defects of wall thinning in repair under pressure
by: V. I. Makhnenko, et al.
Published: (2010)
by: V. I. Makhnenko, et al.
Published: (2010)
Evaluation of serviceability of main pipeline with a local thinning of wall in arc surfacing repair
by: E. A. Velikoivanenko, et al.
Published: (2015)
by: E. A. Velikoivanenko, et al.
Published: (2015)
Experience of introduction of the technology of reconstructive microplasma powder surfacing in repair of high pressure turbine blades in batch production
by: P. D. Zhemanjuk, et al.
Published: (2015)
by: P. D. Zhemanjuk, et al.
Published: (2015)
Computer system for calculation of standards of consumption of welding consumables for manufacture and repair of steel pipelines
by: G. A. Ivanov, et al.
Published: (2012)
by: G. A. Ivanov, et al.
Published: (2012)
Peculiarities in manufacture of thin-walled volume-transformable welded structures for space application
by: L. M. Lobanov, et al.
Published: (2015)
by: L. M. Lobanov, et al.
Published: (2015)
Behaviour of hydrogen in repair welding of pressure main pipelines
by: V. I. Makhnenko, et al.
Published: (2011)
by: V. I. Makhnenko, et al.
Published: (2011)
Reinforcement of an NPP pipeline with a wall thinning defect by applying external weld ovelay
by: G. V. Vorona, et al.
Published: (2024)
by: G. V. Vorona, et al.
Published: (2024)
Optimum reduction of operating pressure in pipeline in hardfacing repair of thinning areas
by: V. I. Makhnenko, et al.
Published: (2010)
by: V. I. Makhnenko, et al.
Published: (2010)
Mechanisms of heads of automatic welding machines for orbital welding of pipelines of NPP power units
by: L. M. Lobanov, et al.
Published: (2019)
by: L. M. Lobanov, et al.
Published: (2019)
Risk of failure during thinning of wall of main pipeline in the area of circumferential welded joints at the presence of bending moments along the axis of pipeline
by: V. I. Makhnenko, et al.
Published: (2012)
by: V. I. Makhnenko, et al.
Published: (2012)
Progress of technologies of arc welding repair of in-service main pipelines in Ukraine
by: V. S. But, et al.
Published: (2014)
by: V. S. But, et al.
Published: (2014)
Towards the planning of repair of main pressure pipelines on the basis of intrapipe diagnostics results
by: A. S. Milenin
Published: (2013)
by: A. S. Milenin
Published: (2013)
Tendency to crack formation in welded joints of repair structures on the gas main pipelines
by: V. S. But, et al.
Published: (2014)
by: V. S. But, et al.
Published: (2014)
Development of technology of mechanized arc welding in repair of main high-pressure gas pipeline
by: O. I. Olejnik, et al.
Published: (2016)
by: O. I. Olejnik, et al.
Published: (2016)
Improvement of method of assessment of risk of fracture in the zone of wall thinning in main pipelines
by: V. I. Makhnenko, et al.
Published: (2010)
by: V. I. Makhnenko, et al.
Published: (2010)
Application of automatic orbital welding in manufacture of housings of neutron measuring channels of nuclear reactors
by: N. M. Makhlin, et al.
Published: (2013)
by: N. M. Makhlin, et al.
Published: (2013)
Development of technology of manufacture of double-wall welded structure of transformable volume
by: L. M. Lobanov, et al.
Published: (2012)
by: L. M. Lobanov, et al.
Published: (2012)
Application of automatic orbital welding in manufacture of absorbing inserts of containers for used nuclear fuel storage
by: V. A. Bogdanovskij, et al.
Published: (2011)
by: V. A. Bogdanovskij, et al.
Published: (2011)
Application of method of dry welding in repair of underwater passages of gas and oil pipelines in Russia
by: Ja. Kononenko
Published: (2010)
by: Ja. Kononenko
Published: (2010)
Thin-walled welded transformable-volume structures of space purpose
by: L. M. Lobanov, et al.
Published: (2018)
by: L. M. Lobanov, et al.
Published: (2018)
Influence of metal shrinkage in longitudinal welds of sleeves on contact pressure in main gas pipeline repair
by: O. I. Olejnik
Published: (2015)
by: O. I. Olejnik
Published: (2015)
Drives of mechanisms of automatic machines for orbital tig welding of metal pipeline joints in npp power units
by: N. M. Makhlin, et al.
Published: (2019)
by: N. M. Makhlin, et al.
Published: (2019)
Robotic welding of thin-walled parts by TOPTIG method with welding mode monitoring system
by: E. Turyk, et al.
Published: (2017)
by: E. Turyk, et al.
Published: (2017)
Double tape for repairing local damage protective coatings of pipelines
by: L. N. Shkaraputa, et al.
Published: (2016)
by: L. N. Shkaraputa, et al.
Published: (2016)
Flash-butt welding of thin-walled profiles of heat-treated aluminium alloys
by: P. N. Chvertko, et al.
Published: (2014)
by: P. N. Chvertko, et al.
Published: (2014)
Selection of welding technology in manufacture and restoration repair of spirals of high-pressure heaters of power units of NPP
by: N. M. Makhlin, et al.
Published: (2018)
by: N. M. Makhlin, et al.
Published: (2018)
Corrosion of an internal wall of industrial gas pipeline
by: Yu. Kovalenko, et al.
Published: (2012)
by: Yu. Kovalenko, et al.
Published: (2012)
Automatic arc welding in manufacture and renovation repair of pipe elements of spirals of high-pressure heaters of NPP power units
by: L. M. Lobanov, et al.
Published: (2020)
by: L. M. Lobanov, et al.
Published: (2020)
RESEARCH INTO METHODS OF PIPE END DEMAGNETIZATION UNDER MAIN PIPELINE REPAIR
by: Dobrodeyev, P. N.
Published: (2014)
by: Dobrodeyev, P. N.
Published: (2014)
Hybrid plasma-arc welding of thin-walled panels from aluminuim alloy
by: V. N. Korzhik
Published: (2017)
by: V. N. Korzhik
Published: (2017)
Discretization of Thin-Walled Sections with Variable Wall Thickness
by: Гребенніков, М. М., et al.
Published: (2025)
by: Гребенніков, М. М., et al.
Published: (2025)
Discretization of Thin-Walled Sections with Variable Wall Thickness
by: Гребенніков, М. М., et al.
Published: (2025)
by: Гребенніков, М. М., et al.
Published: (2025)
Fatigue crack retardation by application of repair coating on gas pipelines under pressure
by: T. P. Venhryniuk
Published: (2012)
by: T. P. Venhryniuk
Published: (2012)
Permissible pressure for filler of sealed sleeves used to repair main pipelines
by: V. I. Makhnenko, et al.
Published: (2011)
by: V. I. Makhnenko, et al.
Published: (2011)
Determination of contact pressure of reinforcing coupling in repair of pipelines with surface defects
by: V. I. Makhnenko, et al.
Published: (2013)
by: V. I. Makhnenko, et al.
Published: (2013)
Application of A-TIG welding for improving the technology of manufacturing and repair of units of gas turbine engines and installations from titanium alloys
by: D. V. Kovalenko, et al.
Published: (2022)
by: D. V. Kovalenko, et al.
Published: (2022)
Development of a robotic complex for hybrid plasma-arc welding of thin-walled structures
by: V. N. Korzhik, et al.
Published: (2017)
by: V. N. Korzhik, et al.
Published: (2017)
Laser welding of thin-wall filter elements of steel 08Kh18N10T
by: V. D. Sheljagin, et al.
Published: (2017)
by: V. D. Sheljagin, et al.
Published: (2017)
Results of 5-year photometric monitoring of the intermediate polar V2306 Cygni: correction of the orbital period and evidence of 2-day periodicity
by: Breus, V., et al.
Published: (2015)
by: Breus, V., et al.
Published: (2015)
Similar Items
-
Repair of pipelines by orbital TIG welding inside the manned space objects
by: E. G. Ternovoj, et al.
Published: (2010) -
Risk of fracture of main pipeline with defects of wall thinning in repair under pressure
by: V. I. Makhnenko, et al.
Published: (2010) -
Evaluation of serviceability of main pipeline with a local thinning of wall in arc surfacing repair
by: E. A. Velikoivanenko, et al.
Published: (2015) -
Experience of introduction of the technology of reconstructive microplasma powder surfacing in repair of high pressure turbine blades in batch production
by: P. D. Zhemanjuk, et al.
Published: (2015) -
Computer system for calculation of standards of consumption of welding consumables for manufacture and repair of steel pipelines
by: G. A. Ivanov, et al.
Published: (2012)