Economic validation of the ore pre-dressing complex used for the overburden rocks in the Kryvbas quarries
Saved in:
| Date: | 2016 |
|---|---|
| Main Author: | E. V. Babij |
| Format: | Article |
| Language: | English |
| Published: |
2016
|
| Series: | Geo-Technical Mechanics |
| Online Access: | http://jnas.nbuv.gov.ua/article/UJRN-0000837971 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Journal Title: | Library portal of National Academy of Sciences of Ukraine | LibNAS |
Institution
Library portal of National Academy of Sciences of Ukraine | LibNASSimilar Items
-
The processing of lumpy rock mass on iron ore quarries
by: E. V. Babij, et al.
Published: (2013) -
Validation of geotechnologic coefficient of hydrodynamic impact on pre-stressed rock massif
by: V. I. Gavrilov
Published: (2014) -
Validation of the quarrying technology with involved undermined pit walls
by: Ju. V. Peregudov, et al.
Published: (2016) -
Study of steel arch support designs in the Kryvbas iron-ore fiel
by: V. V. Khvorost, et al.
Published: (2015) -
Study of the dump stability under the conveyor gallery in the complex with cyclic-and-continuous technology in the Pervomaisky quarry
by: M. S. Chetverik, et al.
Published: (2015)