Subsystem of prediction the duration of heating blow period in air heater blast furnace based on fuzzy knowledge base
Saved in:
| Date: | 2016 |
|---|---|
| Main Authors: | E. I. Kobysh, A. I. Simkin |
| Format: | Article |
| Language: | English |
| Published: |
2016
|
| Series: | Metal and casting of Ukraine |
| Online Access: | http://jnas.nbuv.gov.ua/article/UJRN-0001012835 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Journal Title: | Library portal of National Academy of Sciences of Ukraine | LibNAS |
Institution
Library portal of National Academy of Sciences of Ukraine | LibNASSimilar Items
-
Main provisions blowing blast furnaces after stops of varying duration
by: A. M. Kuznetsov, et al.
Published: (2015) -
Problems of blowing pulverized coal into blast furnaces
by: V. N. Zakharchenko, et al.
Published: (2018) -
Providing safety and safe keeping of blast furnaces lining of at blow-out and blowing in
by: V. I. Bolshakov, et al.
Published: (2009) -
Increase energy heating blast air at the operated blast furnaces by installing a heat exchanger to heat the component to burning and modernization of the heater
by: L. P. Gres, et al.
Published: (2014) -
Prediction of the properties of blast furnace slag in modern conditions of blast furnaces of Ukraine
by: D. N. Togobitskaja, et al.
Published: (2018)