Determination of causes of crack initiation in design elements of tower of new ventilation pipe at Chernobyl NPP
Saved in:
| Date: | 2014 |
|---|---|
| Main Authors: | V. M. Torop, E. F. Garf, A. V. Jakimkin, E. E. Gopkalo |
| Format: | Article |
| Language: | English |
| Published: |
2014
|
| Series: | Automatic Welding |
| Online Access: | http://jnas.nbuv.gov.ua/article/UJRN-0000463231 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Journal Title: | Library portal of National Academy of Sciences of Ukraine | LibNAS |
Institution
Library portal of National Academy of Sciences of Ukraine | LibNASSimilar Items
-
Examination of tubular metal structures of frame elements of Chernobyl NPP ventilation pipe
by: V. A. Troitskij, et al.
Published: (2014) -
Results of studying the causes for cracking in titanium alloy blades of steam turbines of K-1000-60/3000 type
by: V. M. Torop, et al.
Published: (2018) -
40 years of welded structure of Kiev TV tower
by: L. M. Lobanov, et al.
Published: (2014) -
Current hydrobiological and radioecological state of the Chernobyl NPP cooling pond
by: D. I. Gudkov, et al.
Published: (2015) -
Crack initiation on inner surface of piping at high temperatures. Information 1. Thermal load on pipe walls at starting and in service
by: S. A. Nedoseka, et al.
Published: (2015)