2025-02-23T11:25:58-05:00 DEBUG: VuFindSearch\Backend\Solr\Connector: Query fl=%2A&wt=json&json.nl=arrarr&q=id%3A%22open-sciencenbuvgovua-80965%22&qt=morelikethis&rows=5
2025-02-23T11:25:58-05:00 DEBUG: VuFindSearch\Backend\Solr\Connector: => GET http://localhost:8983/solr/biblio/select?fl=%2A&wt=json&json.nl=arrarr&q=id%3A%22open-sciencenbuvgovua-80965%22&qt=morelikethis&rows=5
2025-02-23T11:25:58-05:00 DEBUG: VuFindSearch\Backend\Solr\Connector: <= 200 OK
2025-02-23T11:25:58-05:00 DEBUG: Deserialized SOLR response
New method and device for the on-line visual monitoring of tunnel and equipment state in the mines
Saved in:
Main Authors: | V. G. Shevchenko, M. S. Zajtsev |
---|---|
Format: | Article |
Language: | English |
Published: |
2013
|
Series: | Geo-Technical Mechanics |
Online Access: | http://jnas.nbuv.gov.ua/article/UJRN-0000138507 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
2025-02-23T11:25:58-05:00 DEBUG: VuFindSearch\Backend\Solr\Connector: Query fl=%2A&rows=40&rows=5&wt=json&json.nl=arrarr&q=id%3A%22open-sciencenbuvgovua-80965%22&qt=morelikethis
2025-02-23T11:25:58-05:00 DEBUG: VuFindSearch\Backend\Solr\Connector: => GET http://localhost:8983/solr/biblio/select?fl=%2A&rows=40&rows=5&wt=json&json.nl=arrarr&q=id%3A%22open-sciencenbuvgovua-80965%22&qt=morelikethis
2025-02-23T11:25:58-05:00 DEBUG: VuFindSearch\Backend\Solr\Connector: <= 200 OK
2025-02-23T11:25:58-05:00 DEBUG: Deserialized SOLR response
Similar Items
-
Simulation safety control mining operations of the use visual control of mining and technical equipment
by: V. G. Shevchenko, et al.
Published: (2013) -
Calibration of measuring channel automated system for monitoring of mine line pull multiple-lifting equipment
by: S. R. Ilin, et al.
Published: (2016) -
Scientific and methodological support safe use of mining on the basis of the use of funds operations visual control
by: V. G. Shevchenko, et al.
Published: (2014) -
Optimal architecture and equipment of the distribution line monitoring system
by: I. V. Blinov, et al.
Published: (2018) -
Leakage monitoring of compressed air mine pipe-lines according to the fixed volumes method
by: A. I. Voloshin, et al.
Published: (2014)