SIMULATION OF PARALLEL WORK OF ASYNCHRONOUS GENERATORS IN AUTONOMOUS INSTALLATION FOR CHARGING BATTERIES

Using autonomous wind turbines (AWT) with asynchronous generators (AG) in remote areas is one of the available solutions for power generation and electric power consumers. It should be emphasized that despite the complexity of the circuits to control AWT random nature of change of wind speed and gus...

Повний опис

Збережено в:
Бібліографічні деталі
Дата:2018
Автори: Holovko, V., Kokhanievych, V., Shykhailov, M., Sandoval, K.
Формат: Стаття
Мова:Українська
Опубліковано: Institute of Renewable Energy National Academy of Sciences of Ukraine 2018
Теми:
Онлайн доступ:https://ve.org.ua/index.php/journal/article/view/147
Теги: Додати тег
Немає тегів, Будьте першим, хто поставить тег для цього запису!
Назва журналу:Vidnovluvana energetika
Завантажити файл: Pdf

Репозитарії

Vidnovluvana energetika
_version_ 1871103041740996608
author Holovko, V.
Kokhanievych, V.
Shykhailov, M.
Sandoval, K.
author_facet Holovko, V.
Kokhanievych, V.
Shykhailov, M.
Sandoval, K.
author_institution_txt_mv [ { "author": "V. Holovko", "institution": "Institute of Renewable Energy, NAS of Ukraine" }, { "author": "V. Kokhanievych", "institution": "Institute of Renewable Energy, NAS of Ukraine" }, { "author": "M. Shykhailov", "institution": "Institute of Renewable Energy, NAS of Ukraine" }, { "author": "K. Sandoval", "institution": "National Technical University of Ukraine «Igor Sikorsky Kyiv Polytechnic Institute»" } ]
author_sort Holovko, V.
baseUrl_str https://ve.org.ua/index.php/journal/oai
collection OJS
datestamp_date 2026-07-18T06:32:11Z
description Using autonomous wind turbines (AWT) with asynchronous generators (AG) in remote areas is one of the available solutions for power generation and electric power consumers. It should be emphasized that despite the complexity of the circuits to control AWT random nature of change of wind speed and gusts it can lead to hypertension output of the generator mode. AWT with hypertension using pulsed converters (PC) to charge the batteries allows direct connection to a consumer that not only improves the working conditions of wind turbines, but also simplifies regulation voltage and frequency. The work task design simulation models in parallel operation AWT AG to charge batteries during variable wind speeds and related this change duty cycle output signal PC. The development of the installation model is based on the software package Matlab / Simulink / SimPower Systems. Studies have shown that in the case of the coincidence of voltage drops at the output of the converters (the ideal variant), the total charge current of the bidet is equal to the sum of currents from the generators. When a mismatch output voltage converters, as a result of various wind speeds in the area of the generator (real version), there should be a shift pulse charging current supply terminals on the batteries.
first_indexed 2025-07-17T11:36:54Z
format Article
fulltext ВІТРОЕНЕРГЕТИКА ISSN 1819-8058 Відновлювана енергетика. 2018. № 2 39 УДК 621.548 МОДЕЛЮВАННЯ ПАРАЛЕЛЬНОЇ РОБОТИ АСИНХРОННИХ ГЕНЕРАТОРІВ В АВ- ТОНОМНІЙ УСТАНОВЦІ ДЛЯ ЗАРЯДЖЕННЯ АКУМУЛЯТОРНИХ БАТАРЕЙ В.М. Головко1, професор, доктор технічних наук, В.П. Коханєвич1, кандидат технічних наук, М.О. Шихайлов1, К. Сандовал2, кандидат технічних наук. 1Інститут відновлюваної енергетики НАН України 02094 м. Київ, вул. Гната Хоткевича, 20А. 2Національний технічний університет України «Київський політехнічний інститут ім. І. Сікорського» 03056 м. Київ, пр-т Перемоги 37. В роботі наведені результати досліджень режимів роботи автономної вітроелектричної установки з паралельно ввімк- неними асинхронними генераторами для зарядження акумуляторних батарей за допомогою імпульсних перетворювачів. Розробка моделі установки виконана на базі програмного пакету Matlab /Simulink /SimPower Systems. Бібл. 14, рис. 5. Ключові слова: автономна вітроелектрична установка, асинхронний генератор, імпульсний перетворювач. SIMULATION OF PARALLEL WORK OF ASYNCHRONOUS GENERATORS IN AU- TONOMOUS INSTALLATION FOR CHARGING BATTERIES V. Holovko1, doctor of technical sciences, V. Kokhanievych1, candidate of technical sciences, A. Shykhailov1, K. Sandoval2 , candidate of technical sciences. 1Institute of Renewable Energy, NAS of Ukraine 02094, 20A Hnata Khotkevycha Street, Kyiv, Ukraine. 2National Technical University of Ukraine «Igor Sikorsky Kyiv Polytechnic Institute» 03056, 37 Peremohy Avenue, Kyiv, Ukraine. The paper presents the results of research of the operating modes of an autonomous wind turbine unit with parallel-on asynchronous generators for charging battery packs with pulse converters. The development of the installation model is based on the software package Matlab /Simulink /SimPower Systems. References 14, figures 5. Keywords: autonomous wind turbine, asynchronous generator, pulse converter. В.М. Головко V. Holovko Відомості про автора: провідний науковий співробітник Інституту відновлюваної енергетики НАН України. Освіта: закінчив 1977 р. Українську сільськогос- подарську академію за спеціальністю «Електри- фікація сільського господарства». Наукова діяльність: відновлювані джерела енергії, вітроенергетика, вітроустановки малої потужності, автономні системи енергозабезпечен- ня. Публікації: 145. ORCID: 0000-0003-0195-9654 Контакти: тел. /факс +38 (044) 206-28-09 e-mail: renewable@ukr.net Information about the author: chief re- searcher at Institute for Renewable Energy, National Academy of Sciences of Ukraine. Education: graduated from the Ukrainian Agricultural Academy in 1977 with a de- gree on electrification of agriculture. Research area: renewable sources of en- ergy, wind power systems, small capacity wind units, autonomous power systems. Publications: 145. ORCID: 0000-0003-0195-9654 Contacts: phone /fax +38 (044) 206-28-09 e-mail: renewable@ukr.net © В.М.Головко, В.П.Коханевич, М.О.Шихайлов, К.Сандовал, 2018 mailto:renewable@ukr.net mailto:renewable@ukr.net ВІТРОЕНЕРГЕТИКА ISSN 1819-8058 Відновлювана енергетика. 2018. № 2 40 В.П. Коханєвич V. Kokhanievych Відомості про автора: старший науковий співробітник Інституту відновлюваної енергетики НАН України. Освіта: закінчив 1979 р. Київський політехнічний інститут за спеціальністю «Технологія машино- будування, метало ріжучі верстати та інструмен- ти». Наукова діяльність: вітроенергетика, вітроуста- новки малої потужності, системи регулювання та захисту. Публікації: 121. ORCID: 0000-0003-0033-1355 Контакти: тел. /факс +38 (044) 206-28-09 e-mail: renewable@ukr.net Information about the author: research fellow at Institute for Renewable Energy, National Academy of Sciences of Ukraine. Education: graduated from the Kyiv Poly- technic Institute in 1979 with a degree on technology of machine building, metal cutting machines and tools. Research area: power systems, converting types of energy, automation and modeling processes. wind power systems, small ca- pacity wind units, control systems and protect. Publications: 121. ORCID: 0000-0003-0033-1355 Contacts: phone /fax +38 (044) 206-28-09 e-mail: renewable@ukr.net М.О. Шихайлов A. Shykhailov Відомості про автора: науковий співробітник Інституту відновлюваної енергетики НАН України. Освіта: закінчив 1979 р. Київський політехнічний інститут за спеціальністю «Гідропневмоавтомати- ка та гідропривід». Наукова діяльність: вітроенергетика, вітроуста- новки малої потужності, системи управління. Публікації: 191. ORCID: 0000-0003-1845-9904 Контакти: тел. /факс +38 (044) 206-28-09 e-mail: renewable@ukr.net Information about the author: researcher at Institute for Renewable Energy, Nation- al Academy of Sciences of Ukraine. Education: graduated from the Kyiv Poly- technic Institute in 1979 with a degree on hydropneumatic and hydraulic drive. Research area: wind power systems, small capacity wind units, control systems. Publications: 191. ORCID: 0000-0003-1845-9904 Contacts: phone /fax +38 (044) 206-28-09 e-mail: renewable@ukr.net К. Сандовал K. Sandoval Відомості про автора: стажер у Національному технічному університеті України «Київський політехнічний інститут ім. І. Сікорського». Освіта: закінчив 2010 р. Вінницький політехнич- ний інститут. Наукова діяльність: енергетичні системи, пере- творення видів енергії, автоматизація і моделю- вання процесів. Публікації: 10. ORCID: 0000-0001-6700-3343 Контакти: phone /fax +38 (044) 204-95-19 e-mail: carlszr15@gmail.com Information about the author: intern of National Technical University of Ukraine «Igor Sikorsky Kyiv Polytechnic Insti- tute». Education: graduated from the Vinnitsa Polytechnic Institute in 2010. Research area: power systems, converting types of energy, automation and modeling processes. Publications: 10. ORCID: 0000-0001-6700-3343 Contacts: phone /fax +38 (044) 204-95-19 e-mail: carlszr15@gmail.com Перелік використаних позначень та скорочень: АВЕУ – автономна вітроелектрична установка; Т1,2 – сумарний період АГ – асинхронний генератор; ton1 – тривалість вмикання ІП1; ІП – імпульсний перетворювач; ton2 – тривалість паузи (відключення) ІП2; U – напруга на затискачах випрямлячів; tdelay – тривалість запізнення імпульсу одного із toff3 – тривалість паузи після сумування періодів; імпульсних перетворювачів; T1 – період роботи ІП1; toff3 – тривалість паузи після сумування періодів. T2 – період роботи ІП2; mailto:renewable@ukr.net mailto:renewable@ukr.net mailto:renewable@ukr.net mailto:renewable@ukr.net ВІТРОЕНЕРГЕТИКА ISSN 1819-8058 Відновлювана енергетика. 2018. № 2 41 Вступ. Використання автономних вітро- електричних установок (АВЕУ) з асинхронними генераторами (АГ) у віддалених районах є одним з доступних рішень для генерування електро- енергії та електрозабезпечення споживачів. Ши- роке використання таких систем стримується необхідністю забезпечення їх надійності та про- стоти експлуатації. Останніми роками було проведено ряд до- сліджень систем генерації електричної енергії вітроелектроустановок з використанням асин- хронних машин в якості генераторів. Відомо ба- гато робіт [1–5], де досліджувалися різні методи для визначення ємності для компенсації реактив- ної потужності асинхронного генератора. Оди- ним із недоліків цієї машини є необхідність за- безпечення реактивною потужністю для створен- ня магнітного поля не тільки для самозбудження, але і при зростанні навантаження. В роботах [6– 9] описується використання напівпровід-никових елементів, що дозволило ефективно керувати АВЕУ з АГ. В статтях [10–11] наведені результа- ти досліджень з підвищення жорсткості зовнішньої характеристики АГ. Слід підкрес- лити, що не дивлячись на надійність схеми для керування АВЕУ, випадковий характер зміни швидкостей вітру та його пориви можуть призве- сти до виходу АГ із генераторного режиму. АВЕУ з АГ із використанням імпульсних пере- творювачів (ІП) [12–14] для зарядження акумуля- торних батарей дозволяє здійснювати пряме підключення до споживача, що покращує не тільки умови роботи ВЕУ, але й спрощує систему регулювання напруги та частоти. Постановка задачі. В роботі поставлена за- дача розробки імітаційної моделі паралельної роботи вітроагрегатів з АГ у складі АВЕУ для зарядження акумуляторних батарей при змінній швидкості вітру та, відповідно цій зміні підлаш- товувати шпаруватість вихідного сигналу ІП. Методи дослідження. Для дослідження ре- жимів паралельної роботи вітроагрегатів з АГ у складі АВЕУ проводились шляхом імітаційного моделювання за допомогою програмного пакету Matlab /Simulink /SimPower Systems Результати дослідження. Імітаційна модель АВЕУ наведена на рис. 1, де вітряна турбіна з’єд- нана з АГ, який підключений до блоку конден- саторів. На виході терміналів АГ підключений випрямляч. ІП працює як буфер для підключення і відключення до акумуляторної батареї. На ви- ході кожного ІП вимірюється струм. Рис. 1. Імітаційна модель автономної вітроелектричної установки з двома асинхронними генераторами, що пара- леньно працюють на зарядження акумуляторів. Fig. 1. The simulation model of an autonomous wind turbine unit with two asynchronous generators, which works in parallel to recharge batteries. ВІТРОЕНЕРГЕТИКА ISSN 1819-8058 Відновлювана енергетика. 2018. № 2 42 Імпульсні перетворювачі працюють на базі широтно-імпульсної модуляції з частотою 4 Гц [13]. У випадку, коли напруга на затискачах випрямлячів АГ U1=U2, маємо подвоєння вихід- ного сигналу (рис. 2а), а при умові U1≠U2 – необхідно провести зсунення подачі сигналів при подачі їх на клеми акумулятора (рис. 2б). а) б) Рис. 2. Форми вихідних імпульсів системи. Fig. 2. Forms of output pulses of the system. На рис. 2 ІР1 відповідає сигналу від ІП1, ІР2 – ІП2. а ІР1,2 є сумарне значення двох сигналів. Тоді значення тривалостей пауз та періодів роботи імпульсних перетворювачів такі: 3 1 1 2( )off on ont T t t   , (1) 3 2 1 2( )off on ont T t t   , (2) 1 2 3 1 2( ) 2 off on on T T t t t     , (3) 1,2(0,1...0,9 )delayt T  , (4) де toff3 – тривалість паузи після сумування періо- дів; T1 – період роботи ІП1; T2 – період роботи ІП2; ton1 – тривалість включення ІП1; ton2 – три- валість паузи (відключення) ІП2; tdelay – тривалість запізнення імпульсу одного із імпульсних пере- творювачів. При ширині імпульсу 0,5 с в ІП1 та ІП2 три- валість паузи toff3 буде дорівнювати нулю. Тоді toff3 час вмикання дорівнює 0,25 с, що означає постійність зарядження АБ без паузи. Струми імпульсних перетворювачів на виході системи не сумуються. У розрахунку за формулою (3), коли ширина імпульсу складає 0,6 с в ІП1 та до 0,9 с в ІП2 ре- зультат має від’ємне значення, що відповідає накладанню імпульсу ІП1 на імпульс ІП2, тобто сумування струмів від імпульсних перетво- рювачів. У першому випадку (U1=U2), системи АВЕУ з АГ підключена до ІП, коли швидкість вітру до- сягає 8 м /с, напруга на затискачах асинхронних генераторах досягає свого номінального значення – 1 в.о. (відносних одиниць) (рис. 3а). Шпа- руватість ІР1,2 дорівнює 0,9 для використання максимальної енергії, що виробляють АГ. Струм на виході системи АВЕУ складе 3 А, тобто за іде- альних умов роботи він сумується. Внаслідок збільшення струму на виході пристрою для за- рядження батарей додається другий блок акуму- ляторів. Рис. 3. Струм на виході системи АВЕУ. Fig. 3. Current at the output of the AVEU system. У другому випадку (U1≠U2) результати до- сліджень наведені у рис. 4. При падінні швид- кості вітру на першому вітроагрегаті до 0,9 від номінальної, а на другій до 0,8, напруга на за- тискачах першого генератора складе 0,78 в.о., а на другому – 0,89 в.о. Умови роботи ІП будуть такі: шпаруватість першого складе 0,4, а другого – 0,6. Тривалість паузи розраховується за форму- лою 3, яку можна заповнити тривалістю вклю- чення ІП2 В результаті струми, що будуть на ви- ВІТРОЕНЕРГЕТИКА ISSN 1819-8058 Відновлювана енергетика. 2018. № 2 43 ході системи після зсуву імупульсів, складуть 0,7 А та 1,1 А (рис. 4в). а) б) в) г) Рис. 4. Струм на виході системи АВЕУ. Fig. 4. Current at the output of the AVEU system. При подальшому падінні швидкості вітру на першому вітроагрегаті до 0,75 від номінального значення, а на другому – до 0,9, напруга на за- тискачах генераторів, відповідно, складе 0.73 в.о та 0.89 в.о. (рис. 4б). Шпаруватості ІП1 буде дорівнювати 0,1, а ІП2 – 0,5. Величина струму на виході системи після зсуву імупульсів ІП1 стано- витеме 0,3 А та 0,5 А (рис. 4г). Якщо перший генератор досягне межі виходу з генераторного режиму (напруга 0,71 в.о.), а напруга другого залишиться 0,89 в.о., то струм на виході системи, відповідно, складе, 0.005 А та 0.5 А (рис. 5). а) б) Рис. 5. Струм на виході системи АВЕУ. Fig. 5. Current on the output of the AVEU system. Висновки. Проведено аналіз режимів роботи автономної вітроелектричної установки з пара- лельно увімкненими асинхронними генераторами для зарядження акумуляторних батарей на базі імітаційного моделювання. Зарядження пропону- ється проводити за допомогою імпульсних пере- творювачів. У випадку співпадання напруг на виході перетворювачів (ідеальний варіант) за- гальний струм зарядження буде дорівнювати сумі струмів від генераторів. При неспівпаданні напруг на виході перетворювачів, внаслідок різної швидкості вітру в зоні розташування гене- ВІТРОЕНЕРГЕТИКА ISSN 1819-8058 Відновлювана енергетика. 2018. № 2 44 раторів (реальний варіант), необхідно передбачи- ти зсув подачі імпульсів зарядного струму на клеми акумуляторних батарей. 1. Sunil Kumar Goyal. Analysis of Performance Param- eters and Estimation Of Optimum Capacitance For Asynchro- nous Generator. Engineering Science and Technology, an International Journal. 19(2016) 1753–1762. 2. C. Chakraborty, S.N. Bhadra, A.K. Chattopadhyay. Excitation Requirements For Standalone Three Phase Induction Generator, IEEE Transactions on Energy Conversion, Vol. 13, No. 4, 1998, pp. 358–365. 3. Головко В.М, Коханевич В.П., Шихайлов Н.А., Сандовал К., Донец А.М. Имитационная модель для анализа параметров автономных ветроэлектрических установок с асинхронным генератором // Альтернативная энергетика и экология. – 2017. – №4. – С. 42–52. 4. Dominguez Garcia, Jose Luis, Modeling and Control of Squirrel Cage Induction Generator With Full Power Converter Applied To Windmills. Universitat Politecnica de Catalunya / Oulun Yliopisto, 2009. 5. Васько П.Ф., Брыль А.А., Пекур П.П. Определе- ние технических показателей эффективности использования ветроэлектрических агрегатов в Украине // Энергетика и электрификация. – 1995. – №2. – С. 48–51. 6. J. A. Barrado and R. Grino. Voltage and Frequency Control For A Self-Excited Induction Generator Using A Three- Phase Four – Wire Electronic Converter, 2006, 12th Internation- al Power Electronics and Motion Control Conference, Portoroz, 2006, pp. 1419–1424. doi: 10.1109/EPEPEMC.2006.4778602 7. R. Bornet, S. Rajakaruna. Self-Excited Induction Generator With Excellent Voltage and Frequency Control, in IEE Proceedings – Generation, Transmission and Distribution, vol. 145, No. 1, pp. 33–39, Jan 1998. doi: 10.1049/ip- gtd:19981680. 8. B. Singh, S.S. Murthy, S. Gupta. Analysis and Design of STATCOM-Based Voltage Regulator For Self-Excited Induc- tion Generators, in IEEE Transactions on Energy Conversion, vol. 19, No. 4, pp. 783–790, Dec. 2004. doi: 10.1109/TEC.2004.827710. 9. Vellapatchi Nayanar. Wind-Driven SEIG Supplying DC Microgrid Through A Single-Stage Power Converter / Nayanar Vellapatchi // Engineering Science and Technology, an International Journal. 19(2016) 1600–1607. 10. Кудря С.О., Будько В.І., Павлов В.Б., Попов А.В., Павленко В.Є. Дослідження роботи зарядного пристрою акумуляторної батарей від вітроагрегату // Відновлювана енергетика. – 2010. – №4. – С. 5–10. 11. Зачепа Ю.В. Моделювання перехідних процесів асинхронного генератора з живленням споживачів постійно- го струму // Збірник наукових праць Дніпродзержинського державного технічного університету. Технічні науки. – 2015. – Вип. 1. – С. 108–114. 12. Головко В.М., Коханєвич В.П., Шихайлов М.О., Сандовал К. Аналіз режимів роботи автономної вітроелек- тричної установки з асинхронним генератором з викори- станням імпульсного пристрою для зарядження акумуля- торних батарей на базі імітаційного моделювання // Відновлювана Енергетика. –2017. – №2. – С. 63–74. 13. Головко В.М., Сандовал К. Порівняльний аналіз експериментальних та результатів імітаційного моделюван- ня роботи автономної вітроелектричної установки з асин- хронним генератором з використанням імпульсного при- строю для зарядження акумуляторних батарей // Енергетика і автоматика. – 2017. – №2 (32). – С. 153–160. 14. А.с. 117122 Україна, МПК F03D 9/00, H02j 7/00. Пристрій для зарядження акумуляторних батарей / В.М. Головко, В.П. Коханєвич, М.О. Шихайлов, В.Б. Павлов, В.Є. Павленко, К.Р. Сандовал (Україна). – №2017 01210; заявл.10.02.17; опубл. 12.06.17, Бюл. №11. МОДЕЛИРОВАНИЕ ПАРАЛЛЕЛЬНОЙ РАБОТЫ АСИНХРОННЫХ ГЕНЕРАТОРОВ В АВТОНОМНОЙ УСТАНОВКЕ ДЛЯ ЗАРЯДКИ АККУМУЛЯТОРНЫХ БАТАРЕЙ В.М. Головко1, профессор, доктор технических наук, В.П. Коханевич1, кандидат технических наук, Н.А. Шихайлов1, К.Р. Сандовал2, кандидат технических наук. 1Институт возобновляемой энергетики НАН Украины 02094 г. Киев, ул. Гната Хоткевича, 20А. 2Национальный технический университет Украины «Киев- ский политехнический институт им. И. Сикорского» 03056 г. Киев, пр-т Перемогы, 37. В работе приведены результаты исследований режимов работы автономной ветроэлектрической установки с па- раллельно включенными асинхронными генераторами для зарядки аккумуляторных батарей с помощью импульсных преобразователей. Разработка модели установки исполнена на базе программного пакета Matlab /Simulink /SimPower Systems. Библ. 14, рис. 5. Ключевые слова: автономная ветроэлектрическая установ- ка, асинхронный генератор, импульсный преобразователь. REFERENCES 1. Sunil Kumar Goyal, Analysis of Performance Param- eters and Estimation Of Optimum Capacitance For Asynchro- nous Generator. Engineering Science and Technology, an International Journal. 19(2016) 1753–1762. 2. C. Chakraborty, S.N. Bhadra, A.K. Chattopadhyay, Excitation Requirements For Standalone Three Phase Induction Generator, IEEE Transactions on Energy Conversion, Vol. 13, No. 4, 1998, pp. 358–365. 3. Golovko V.M., Kohanevich V.P., Shikhailov N.A., Sandoval K., Donets A.M. Imitation Model For Analysis Of Parameters Of Autonomous Wind-Driven Installations With An Asynchronous Generator // Alternative energy and ecology. – 2017. – №4. – P. 42–52. 4. Dominguez Garcia, Jose Luis, Modeling and Control of Squirrel Cage Induction Generator With Full Power Converter https://scholar.google.com.ua/scholar?oi=bibs&cluster=4064776970309208692&btnI=1&hl=ru https://scholar.google.com.ua/scholar?oi=bibs&cluster=4064776970309208692&btnI=1&hl=ru https://scholar.google.com.ua/scholar?oi=bibs&cluster=4064776970309208692&btnI=1&hl=ru ВІТРОЕНЕРГЕТИКА ISSN 1819-8058 Відновлювана енергетика. 2018. № 2 45 Applied To Windmills. Universitat Politecnica de Catalunya / Oulun Yliopisto, 2009. 5. Vasko P.F., Bryl A.A., Pekur P.P. Determination Of Technical Indicators Of Efficiency Of Wind Energy Utilization In Ukraine // Power engineering and electrification. – 1995. – №2. – P. 48–51. 6. J. A. Barrado and R. Grino, Voltage and Frequency Control For A Self-Excited Induction Generator Using A Three- Phase Four – Wire Electronic Converter, 2006, 12th Internation- al Power Electronics and Motion Control Conference, Portoroz, 2006, pp. 1419–1424. doi: 10.1109/EPEPEMC.2006.4778602 7. R. Bornet and S. Rajakaruna Self-Excited Induction Generator With Excellent Voltage and Frequency Control, in IEE Proceedings – Generation, Transmission and Distribution, vol. 145, No. 1, pp. 33–39, Jan 1998. doi: 10.1049/ip- gtd:19981680. 8. B. Singh, S.S. Murthy and S. Gupta, Analysis and Design of STATCOM-Based Voltage Regulator For Self- Excited Induction Generators, in IEEE Transactions on Energy Conversion, vol. 19, No. 4, pp. 783–790, Dec. 2004. doi: 10.1109/TEC.2004.827710. 9. Vellapatchi Nayanar, Wind-Driven SEIG Supplying DC Microgrid Through A Single-Stage Power Converter / Nayanar Vellapatchi // Engineering Science and Technology, an International Journal. 19(2016) 1600–1607. 10. Kudrya S.O., Budko V.I., Pavlov V.B., Popov A.V, Pavlenko V.Y. Investigating The Work Of The Battery Charger From The Wind Turbine // Renewable energy. – 2010. – №4. – P. 5–10. 11. Zachepa Y.V. Simulation of Transient Processes of Asynchronous Generator With Power Supply for DC Consumers // Collection of scientific works of Dneprodzerzhinsky State Technical University. Technical sciences. – 2015. – Vip. 1. – P. 108–114. 12. Golovko V.M., Kokanievich V.P., Shikhai- lov M.O. Sandoval K. Analysis Of Operating Modes Of An Autonomous Wind Power Plant With An Asynchronous Gen- erator Using A Pulse Device For Charging Rechargeable Batteries based on simulation // Renewable Energy. – 2017. – №2. – P. 63–74. 13. Golovko V.M., Sandoval K. Comparative analysis of experimental and simulation results of simulation of autonomous wind power plant with an asynchronous generator using a pulse device for charging rechargeable batteries // Power engineering and Automatics. – 2017. – №2 (32). – P. 153–160. 14. A.s. 117122 Ukraine, IPC F03D 9/00, H02j 7/00. Bat- tery charging device / V.M. Golovko, V.P. Kohanevich, M.O. Shikhailov, V.B. Pavlov, V.E. Pavlenko, K.P. Sandoval (Ukraine). – №2017 01210; stat. 10.02.17; publ. on 06.12.17, Bull. №11. SYNOPSES Using autonomous wind turbines (AWT) with asynchro- nous generators (AG) in remote areas is one of the available solutions for power generation and electric power consumers. It should be emphasized that despite the complexity of the circuits to control AWT random nature of change of wind speed and gusts it can lead to hypertension output of the generator mode. AWT with hypertension using pulsed converters (PC) to charge the batteries allows direct connection to a consumer that not only improves the working conditions of wind turbines, but also simplifies regulation voltage and frequency. The work task design simulation models in parallel opera- tion AWT AG to charge batteries during variable wind speeds and related this change duty cycle output signal PC. The devel- opment of the installation model is based on the software pack- age Matlab / Simulink / SimPower Systems. Studies have shown that in the case of the coincidence of voltage drops at the output of the converters (the ideal variant), the total charge current of the bidet is equal to the sum of cur- rents from the generators. When a mismatch output voltage con- verters, as a result of various wind speeds in the area of the gen- erator (real version), there should be a shift pulse charging cur- rent supply terminals on the batteries. РЕФЕРАТ Использование автономных ветроэлектрических устано- вок (АВЭУ) c асинхронными генераторами (АГ) в отдален- ных районах является одним из доступных решений для гене- рирования электроэнергии и электрообеспечения потребите- лей. Необходимо подчеркнуть, что, не смотря на сложность схемы для управления АВЭУ, случайный характер изменения скорости ветра и его порывы могут привести к выходу АГ из генераторного режима. АВЭУ с АГ с использованием им- пульсных преобразователей (ИП) для зарядки аккумулятор- ных батарей позволяет осуществить прямое подключение к потребителю, что улучшает не только условия работы ВЭУ, но и упрощает систему регулирования напряжения и частоты. В работе поставлена цель разработки имитационной модели параллельной работы АГ в АВЭУ для зарядки акку- муляторных батарей при переменной скорости ветра и соот- ветственному изменению скважности выходного сигнала ИП. Разработка модели установки выполнена на базе про- граммного пакета Matlab /Simulink /SimPower Systems. Исследования показали, что в случае совпадения напряжений на выходе преобразователей (идеальный вари- ант) суммарный ток зарядки будет составлять сумму токов генераторов. При несовпадении напряжений на выходе пре- образователей, в результате разных скоростей ветра в зоне размещения генераторов (реальный вариант), необходимо предусмотреть смещение подачи импульсов зарядного тока на клеммы аккумуляторных батарей. Стаття надійшла до редакції 02.05.18 Остаточна версія 07.06.18
id veorgua-article-147
institution Vidnovluvana energetika
keywords_txt_mv keywords
language Ukrainian
last_indexed 2026-07-19T01:01:54Z
publishDate 2018
publisher Institute of Renewable Energy National Academy of Sciences of Ukraine
record_format ojs
resource_txt_mv veorgua/d6/2da6e92c0f63b6ff7c1349d051db8cd6.pdf
spelling veorgua-article-1472026-07-18T06:32:11Z SIMULATION OF PARALLEL WORK OF ASYNCHRONOUS GENERATORS IN AUTONOMOUS INSTALLATION FOR CHARGING BATTERIES МОДЕЛИРОВАНИЕ ПАРАЛЛЕЛЬНОЙ РАБОТЫ АСИНХРОННЫХ ГЕНЕРАТОРОВ В АВТОНОМНОЙ УСТАНОВКЕ ДЛЯ ЗАРЯДКИ АККУМУЛЯТОРНЫХ БАТАРЕЙ МОДЕЛЮВАННЯ ПАРАЛЕЛЬНОЇ РОБОТИ АСИНХРОННИХ ГЕНЕРАТОРІВ В АВТОНОМНІЙ УСТАНОВЦІ ДЛЯ ЗАРЯДЖЕННЯ АКУМУЛЯТОРНИХ БАТАРЕЙ Holovko, V. Kokhanievych, V. Shykhailov, M. Sandoval, K. autonomous wind turbine asynchronous generator pulse converter автономна вітроелектрична установка асинхронний генератор імпульсний перетворювач автономная ветроэлектрическая установка асинхронный генератор импульсный преобразователь Using autonomous wind turbines (AWT) with asynchronous generators (AG) in remote areas is one of the available solutions for power generation and electric power consumers. It should be emphasized that despite the complexity of the circuits to control AWT random nature of change of wind speed and gusts it can lead to hypertension output of the generator mode. AWT with hypertension using pulsed converters (PC) to charge the batteries allows direct connection to a consumer that not only improves the working conditions of wind turbines, but also simplifies regulation voltage and frequency. The work task design simulation models in parallel operation AWT AG to charge batteries during variable wind speeds and related this change duty cycle output signal PC. The development of the installation model is based on the software package Matlab / Simulink / SimPower Systems. Studies have shown that in the case of the coincidence of voltage drops at the output of the converters (the ideal variant), the total charge current of the bidet is equal to the sum of currents from the generators. When a mismatch output voltage converters, as a result of various wind speeds in the area of the generator (real version), there should be a shift pulse charging current supply terminals on the batteries. В работе приведены результаты исследований режимов работы автономной ветроэлектрической установки с параллельно включенными асинхронными генераторами для зарядки аккумуляторных батарей с помощью импульсных преобразователей. Разработка модели установки исполнена на базе программного пакета Matlab /Simulink /SimPower Systems. Использование автономных ветроэлектрических установок (АВЭУ) c асинхронными генераторами (АГ) в отдаленных районах является одним из доступных решений для генерирования электроэнергии и электрообеспечения потребителей. Необходимо подчеркнуть, что, не смотря на сложность схемы для управления АВЭУ, случайный характер изменения скорости ветра и его порывы могут привести к выходу АГ из генераторного режима. АВЭУ с АГ с использованием импульсных преобразователей (ИП) для зарядки аккумуляторных батарей позволяет осуществить прямое подключение к потребителю, что улучшает не только условия работы ВЭУ, но и упрощает систему регулирования напряжения и частоты. В работе поставлена цель разработки имитационной модели параллельной работы АГ в АВЭУ для зарядки аккумуляторных батарей при переменной скорости ветра и соответственному изменению скважности выходного сигнала ИП. Разработка модели установки выполнена на базе программного пакета Matlab /Simulink /SimPower Systems. Исследования показали, что в случае совпадения напряжений на выходе преобразователей (идеальный вариант) суммарный ток зарядки будет составлять сумму токов генераторов. При несовпадении напряжений на выходе преобразователей, в результате разных скоростей ветра в зоне размещения генераторов (реальный вариант), необходимо предусмотреть смещение подачи импульсов зарядного тока на клеммы аккумуляторных батарей.   Institute of Renewable Energy National Academy of Sciences of Ukraine 2018-06-18 Article Article application/pdf https://ve.org.ua/index.php/journal/article/view/147 Vidnovluvana energetika ; No. 2 (53) (2018): Scientific and Applied Journal Vidnovluvana energetika; 39-45 Возобновляемая энергетика; ##issue.no## 2 (53) (2018): Научно-прикладной журнал Возобновляемая энергетика; 39-45 Відновлювана енергетика; № 2 (53) (2018): Науково-прикладний журнал Відновлювана енергетика; 39-45 2664-8172 1819-8058 uk https://ve.org.ua/index.php/journal/article/view/147/99 Copyright (c) 2018 V. Holovko, V. Kokhanievych, M. Shykhailov, K. Sandoval https://creativecommons.org/licenses/by-nc-nd/4.0
spellingShingle autonomous wind turbine
asynchronous generator
pulse converter
Holovko, V.
Kokhanievych, V.
Shykhailov, M.
Sandoval, K.
SIMULATION OF PARALLEL WORK OF ASYNCHRONOUS GENERATORS IN AUTONOMOUS INSTALLATION FOR CHARGING BATTERIES
title SIMULATION OF PARALLEL WORK OF ASYNCHRONOUS GENERATORS IN AUTONOMOUS INSTALLATION FOR CHARGING BATTERIES
title_alt МОДЕЛИРОВАНИЕ ПАРАЛЛЕЛЬНОЙ РАБОТЫ АСИНХРОННЫХ ГЕНЕРАТОРОВ В АВТОНОМНОЙ УСТАНОВКЕ ДЛЯ ЗАРЯДКИ АККУМУЛЯТОРНЫХ БАТАРЕЙ
МОДЕЛЮВАННЯ ПАРАЛЕЛЬНОЇ РОБОТИ АСИНХРОННИХ ГЕНЕРАТОРІВ В АВТОНОМНІЙ УСТАНОВЦІ ДЛЯ ЗАРЯДЖЕННЯ АКУМУЛЯТОРНИХ БАТАРЕЙ
title_full SIMULATION OF PARALLEL WORK OF ASYNCHRONOUS GENERATORS IN AUTONOMOUS INSTALLATION FOR CHARGING BATTERIES
title_fullStr SIMULATION OF PARALLEL WORK OF ASYNCHRONOUS GENERATORS IN AUTONOMOUS INSTALLATION FOR CHARGING BATTERIES
title_full_unstemmed SIMULATION OF PARALLEL WORK OF ASYNCHRONOUS GENERATORS IN AUTONOMOUS INSTALLATION FOR CHARGING BATTERIES
title_short SIMULATION OF PARALLEL WORK OF ASYNCHRONOUS GENERATORS IN AUTONOMOUS INSTALLATION FOR CHARGING BATTERIES
title_sort simulation of parallel work of asynchronous generators in autonomous installation for charging batteries
topic autonomous wind turbine
asynchronous generator
pulse converter
topic_facet autonomous wind turbine
asynchronous generator
pulse converter
автономна вітроелектрична установка
асинхронний генератор
імпульсний перетворювач
автономная ветроэлектрическая установка
асинхронный генератор
импульсный преобразователь
url https://ve.org.ua/index.php/journal/article/view/147
work_keys_str_mv AT holovkov simulationofparallelworkofasynchronousgeneratorsinautonomousinstallationforchargingbatteries
AT kokhanievychv simulationofparallelworkofasynchronousgeneratorsinautonomousinstallationforchargingbatteries
AT shykhailovm simulationofparallelworkofasynchronousgeneratorsinautonomousinstallationforchargingbatteries
AT sandovalk simulationofparallelworkofasynchronousgeneratorsinautonomousinstallationforchargingbatteries
AT holovkov modelirovanieparallelʹnojrabotyasinhronnyhgeneratorovvavtonomnojustanovkedlâzarâdkiakkumulâtornyhbatarej
AT kokhanievychv modelirovanieparallelʹnojrabotyasinhronnyhgeneratorovvavtonomnojustanovkedlâzarâdkiakkumulâtornyhbatarej
AT shykhailovm modelirovanieparallelʹnojrabotyasinhronnyhgeneratorovvavtonomnojustanovkedlâzarâdkiakkumulâtornyhbatarej
AT sandovalk modelirovanieparallelʹnojrabotyasinhronnyhgeneratorovvavtonomnojustanovkedlâzarâdkiakkumulâtornyhbatarej
AT holovkov modelûvannâparalelʹnoírobotiasinhronnihgeneratorívvavtonomníjustanovcídlâzarâdžennâakumulâtornihbatarej
AT kokhanievychv modelûvannâparalelʹnoírobotiasinhronnihgeneratorívvavtonomníjustanovcídlâzarâdžennâakumulâtornihbatarej
AT shykhailovm modelûvannâparalelʹnoírobotiasinhronnihgeneratorívvavtonomníjustanovcídlâzarâdžennâakumulâtornihbatarej
AT sandovalk modelûvannâparalelʹnoírobotiasinhronnihgeneratorívvavtonomníjustanovcídlâzarâdžennâakumulâtornihbatarej