SIMULATION OF PARALLEL WORK OF ASYNCHRONOUS GENERATORS IN AUTONOMOUS INSTALLATION FOR CHARGING BATTERIES
Using autonomous wind turbines (AWT) with asynchronous generators (AG) in remote areas is one of the available solutions for power generation and electric power consumers. It should be emphasized that despite the complexity of the circuits to control AWT random nature of change of wind speed and gus...
Saved in:
Date: | 2018 |
---|---|
Main Authors: | Holovko, V., Kokhanievych, V., Shykhailov, M., Sandoval, K. |
Format: | Article |
Language: | Ukrainian |
Published: |
Institute of Renewable Energy National Academy of Sciences of Ukraine
2018
|
Subjects: | |
Online Access: | https://ve.org.ua/index.php/journal/article/view/147 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Journal Title: | Vidnovluvana energetika |
Institution
Vidnovluvana energetikaSimilar Items
-
Simulation of parallel work of asynchronous generators in autonomous installation for charging batteries
by: V. M. Holovko, et al.
Published: (2018) -
Analysis of operating modes of a stand-alone wind turbine with induction generator using pulse converter for charging batteries based on simulation
by: Holovko, V., et al.
Published: (2017) -
INCREASING THE POWER OF THE WINDOW GENERATOR FOR THE DECREASE OF AIR LENGTH BETWEEN THE STATOR AND THE ROTOR
by: Holovko, V., et al.
Published: (2020) -
MATHEMATICAL SIMULATION OF AUTONOMOUS WIND INSTALLATION WITH SYNCHRONOUS MAGNETO-ELECTRIC TYPE GENERATOR
by: Golovko, V., et al.
Published: (2020) -
INVESTIGATION OF THE INFLUENCE OF THE PARAMETERS OF THE WIND FLOW ON THE CHOICE OF THE CHARACTERISTICS OF THE AUTONOMOUS WIND TURBINE
by: Gonsharenko, Yu., et al.
Published: (2022)