OPTIMAL DISTRIBUTION OF THE ENERGY COMPANY'S INVESTMENT COSTS FOR EQUIPMENT RE-PLACEMENT, TAKING INTO ACCOUNT ECONOMIC CONSTRAINTS AND OPERATIONAL RISKS IN THE POWER SYSTEM

The paper considers the optimal allocation issues of the allocated limited investment costs of a power company for the worn-out and damaged equipment replacement, taking into account the objectively existing limiting technical and economic factors. In particular, the main existing strategies for ele...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Datum:2024
Автори та афіліації:
  • Ye. Bardyk — National Technical University of Ukraine «Igor Sikorsky Kyiv Polytechnic Institute», Kyiv, Ukraine
  • I. Zakliuka — maintenance, diagnostics, production assets, electrical equipment, fuzzy logic, resource, risk, Boolean pro-gramming, failure.
Ключові слова:keywords
Hauptverfasser: Bardyk , Ye., Zakliuka , I.
Format: Artikel
Sprache:Ukrainisch
Veröffentlicht: Institute of Renewable Energy National Academy of Sciences of Ukraine 2024
Schlagworte:
Online Zugang:https://ve.org.ua/index.php/journal/article/view/454
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Назва журналу:Vidnovluvana energetika
Завантажити файл: Pdf

Institution

Vidnovluvana energetika