Green projects risk assessment models
The study is devoted to the analysis and forecasting of green projects investment and credit risks. The peculiarity of such projects is their ecological orientation. The assessment of their risks needs an ana-lysis of both economic and ecological components. The work researches existing approaches,...
Saved in:
| Date: | 2024 |
|---|---|
| Main Authors: | Кузнєцова, Н. В., Шевчук, О. С. |
| Format: | Article |
| Language: | Ukrainian |
| Published: |
Інститут проблем реєстрації інформації НАН України
2024
|
| Subjects: | |
| Online Access: | http://drsp.ipri.kiev.ua/article/view/308752 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Journal Title: | Data Recording, Storage & Processing |
Institution
Data Recording, Storage & ProcessingSimilar Items
Dynamic risk assessment and development of the banking activity against risk strategies
by: Кузнєцова, Н. В., et al.
Published: (2021)
by: Кузнєцова, Н. В., et al.
Published: (2021)
Mathematical models of copulas for assessing the risks of green projects
by: Кузнєцова, Н. В., et al.
Published: (2025)
by: Кузнєцова, Н. В., et al.
Published: (2025)
DETERMINATION OF NETWORK TRAFFIC ANOMALIES IN A DISTRIBUTED COMPUTER SYSTEM WITH ENERGY FACILITIES
by: Shapovalova , S., et al.
Published: (2024)
by: Shapovalova , S., et al.
Published: (2024)
Framework model of syncretic management of innovative projects
by: Bushuev, Serhiy, et al.
Published: (2024)
by: Bushuev, Serhiy, et al.
Published: (2024)
Analysis of risks in network models of projects by means of simulating optimization methods
by: Kuzmychov, A. I.
Published: (2017)
by: Kuzmychov, A. I.
Published: (2017)
Features of the assessment of occupational risks in truck transportation
by: Tsopa, Vitaliy A., et al.
Published: (2023)
by: Tsopa, Vitaliy A., et al.
Published: (2023)
Financial risk management with taking account of information
by: Kuznietsova, N. V.
Published: (2018)
by: Kuznietsova, N. V.
Published: (2018)
An automated scenario generation system for analytical activities.
by: Dodonov, O. G., et al.
Published: (2019)
by: Dodonov, O. G., et al.
Published: (2019)
Estimation of the Performance of Typical Project Tasks at Enterprises with a Functional Organization Structure
by: Kuzminykh, V. A., et al.
Published: (2012)
by: Kuzminykh, V. A., et al.
Published: (2012)
The reducing of construction industry influence on climate change by implementation of green building principles
by: Kryvomaz, Тetiana I., et al.
Published: (2021)
by: Kryvomaz, Тetiana I., et al.
Published: (2021)
Remote monitoring of the state of hydrocarbon pollution of the geological environment and assessment of the risks of dangerous situations in areas of long-term oil and gas production and compact living of the population
by: Filipovych, Volodymyr, et al.
Published: (2020)
by: Filipovych, Volodymyr, et al.
Published: (2020)
METHODOLOGY FOR ASSESSING OF THE WIND ENERGY POTENTIAL OF THE UKRAINE TERRITORY USING GEOGRAPHIC INFORMATION SYSTEMS
by: Petrenko , K., et al.
Published: (2024)
by: Petrenko , K., et al.
Published: (2024)
FEATURES OF RISK MANAGEMENT IN THE EARLY STAGES OF THE DEVELOP-MENT OF INNOVATIVE PROJECTS TO ENHANCE THE ENERGY EFFICIENCY OF TECHNICAL DEVICES FOR CONVERSING ENERGY
by: Statsenko, V, et al.
Published: (2019)
by: Statsenko, V, et al.
Published: (2019)
Assessing the economic and environmental benefits of blue-green infrastructure to increase urban resilience to climate change
by: Kravchenko, Maryna, et al.
Published: (2025)
by: Kravchenko, Maryna, et al.
Published: (2025)
Feasibility analysis of construction of new hydropower plants in Ukraine taking into account the risk of unused possibilities
by: Stefanyshyn, Dmytro V.
Published: (2019)
by: Stefanyshyn, Dmytro V.
Published: (2019)
Operative Decision-Making in Emergency Situations: Model of Time-Cost Project Scheduling
by: Dodonov, O. G., et al.
Published: (2014)
by: Dodonov, O. G., et al.
Published: (2014)
Comprehensive emergent assessment of ecosystem services and economic efficiency of urban green structures
by: Shumbar, Kostiantyn, et al.
Published: (2025)
by: Shumbar, Kostiantyn, et al.
Published: (2025)
A method of risk assessment in defense planning tasks
by: Нестеренко, О. В., et al.
Published: (2021)
by: Нестеренко, О. В., et al.
Published: (2021)
GROUNDWATER MONITORING AND MATHEMAICAL MODELING OF RADIOACTIVE CONTAMINATION OF GROUNDWATER IN CHERNOBYL EXCLUSION ZONE AND FOR THE URANIUM FACILITIES OF THE FORMER PRIDNEPROVSKY CHEMICAL PLANT (Kamyanske)
by: Bugai, D.O., et al.
Published: (2018)
by: Bugai, D.O., et al.
Published: (2018)
Method of Neuro-Fuzzy Network Synthesis Based on Decision Trees
by: Гофман, Є. О., et al.
Published: (2012)
by: Гофман, Є. О., et al.
Published: (2012)
On some challenges of environmental impact assessment of small hydropower plants in Ukraine
by: Vlasiuk, Yurii S., et al.
Published: (2019)
by: Vlasiuk, Yurii S., et al.
Published: (2019)
Green standards for improving office activities in new conditions
by: Kryvomaz, Тetyana I., et al.
Published: (2020)
by: Kryvomaz, Тetyana I., et al.
Published: (2020)
Implementation of scenario approach in project management on the basis of typical tasks
by: Koval, O. V., et al.
Published: (2015)
by: Koval, O. V., et al.
Published: (2015)
Assessment of Economic Greening Efficiency in Water Resource Management
by: Khumarova, Nina, et al.
Published: (2025)
by: Khumarova, Nina, et al.
Published: (2025)
PRINCIPLES OF FORMING AN INVESTMENT ATTRACTIVENESS LAYER IN THE GIS MAP OF GREEN HYDROGEN ENERGY PROJECTS
by: Kudrya , S., et al.
Published: (2025)
by: Kudrya , S., et al.
Published: (2025)
Network modeling of project program schedule with systems Engineering Аpproach
by: Кузьмичов , А. І.
Published: (2025)
by: Кузьмичов , А. І.
Published: (2025)
Гібридна згорткова мережа для обробки зображень рентгенівських знімків для виявлення захворювання COVID-19
by: Федорченко , Є. М., et al.
Published: (2022)
by: Федорченко , Є. М., et al.
Published: (2022)
Scoring card’s development for banking activities risks’ analysis
by: Kuznietsova, N. V.
Published: (2017)
by: Kuznietsova, N. V.
Published: (2017)
Creation of energy efficient "green constructions" in conditions of moderately continental climate
by: Tkachenko, T.M.
Published: (2018)
by: Tkachenko, T.M.
Published: (2018)
Detection of optimal hierarchy in a quasi-hierarchical graph by centrality criteria
by: Sulema, O. K., et al.
Published: (2015)
by: Sulema, O. K., et al.
Published: (2015)
Evaluation of indicators for desertification risk assessment of Oleshky sands desertification based on Landsat data time series
by: Lubskyi, Mykola, et al.
Published: (2023)
by: Lubskyi, Mykola, et al.
Published: (2023)
Green building BREEAM in Ukraine
by: Kryvomaz, Тetyana I., et al.
Published: (2019)
by: Kryvomaz, Тetyana I., et al.
Published: (2019)
ENGINEERING-GEOLOGICAL TYPIFICATION AS A BASIS FOR ASSESSMENT AND FORECAST OF RISKS IN THE DEVELOPMENT OF UNDERGROUND SPACE IN CITIES USING THE EXAMPLE OF THE DNIPRO CITY
by: Мокрицька, Т.П., et al.
Published: (2025)
by: Мокрицька, Т.П., et al.
Published: (2025)
To the problem of risk management in the field of the atomic industry of Ukraine
by: Drozd, I.P.
Published: (2018)
by: Drozd, I.P.
Published: (2018)
Evaluation of the occupational risk index of the forest faller
by: Deryugin, Oleg V., et al.
Published: (2023)
by: Deryugin, Oleg V., et al.
Published: (2023)
Mathematical modeling of transport and logistics infrastructure for the post-war reconstruction of Ukraine
by: Horoshkova, Lidiia A., et al.
Published: (2024)
by: Horoshkova, Lidiia A., et al.
Published: (2024)
Assessment of additional seismic risk of destruction of structures on flooded loesses and loessy-loamy rocks in Ukraine
by: Rogozhin, Olexij G., et al.
Published: (2019)
by: Rogozhin, Olexij G., et al.
Published: (2019)
Application of geotechnical structures in «green construction»
by: Sviatohorov, Illia O.
Published: (2024)
by: Sviatohorov, Illia O.
Published: (2024)
French green building rating systems
by: Kryvomaz, Т.I., et al.
Published: (2018)
by: Kryvomaz, Т.I., et al.
Published: (2018)
ESG criteria in green rebuilding of Ukraine
by: Kryvomaz, Tetiana I., et al.
Published: (2023)
by: Kryvomaz, Tetiana I., et al.
Published: (2023)
Similar Items
-
Dynamic risk assessment and development of the banking activity against risk strategies
by: Кузнєцова, Н. В., et al.
Published: (2021) -
Mathematical models of copulas for assessing the risks of green projects
by: Кузнєцова, Н. В., et al.
Published: (2025) -
DETERMINATION OF NETWORK TRAFFIC ANOMALIES IN A DISTRIBUTED COMPUTER SYSTEM WITH ENERGY FACILITIES
by: Shapovalova , S., et al.
Published: (2024) -
Framework model of syncretic management of innovative projects
by: Bushuev, Serhiy, et al.
Published: (2024) -
Analysis of risks in network models of projects by means of simulating optimization methods
by: Kuzmychov, A. I.
Published: (2017)