SYNTHESIS GAS REGENERATION ELECTROTECHNOLOGY USING VOLUME HIGH-VOLTAGE PULSED DISCHARGES: CORONA AND BARRIER ONES
Factory testing of a created high-voltage complex (plant) has been conducted. The complex consists of two pulse generators with the repetition rate of up to 50,000 pulses per second and load reactors with pulsed discharges – corona and barrier ones. Transistor (IGBT) keys are used as energy switches...
Saved in:
| Date: | 2014 |
|---|---|
| Main Authors: | , , , |
| Format: | Article |
| Language: | Russian |
| Published: |
National Technical University "Kharkiv Polytechnic Institute" and Аnatolii Pidhornyi Institute of Power Machines and Systems of NAS of Ukraine
2014
|
| Subjects: | |
| Online Access: | http://eie.khpi.edu.ua/article/view/2074-272X.2014.4.08 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Journal Title: | Electrical Engineering & Electromechanics |