Operation of T-100/120-130 cogeneration turboplant when heated network water in the heater upper stages

In case of emergency or planned repair work a method of heating turbine T-100/120-130 network with one upper heater is provided. The results of computational modeling of thermal and electrical loads of units number 1 and number 2 PLC "Kharkov HPS-5" are presented.