Construction of two-stage schedules of processing of products on one machine
Saved in:
| Date: | 2018 |
|---|---|
| Main Author: | Ju. A. Zak |
| Format: | Article |
| Language: | English |
| Published: |
2018
|
| Series: | System researches & information technologies |
| Online Access: | http://jnas.nbuv.gov.ua/article/UJRN-0001075272 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Journal Title: | Library portal of National Academy of Sciences of Ukraine | LibNAS |
Institution
Library portal of National Academy of Sciences of Ukraine | LibNASSimilar Items
Modified ACO Algorithm for Construction of Contracts Execution Schedule
by: H. V. Oliinyk, et al.
Published: (2017)
by: H. V. Oliinyk, et al.
Published: (2017)
Development and implementation of metaheuristic algorithms for solving independent machine scheduling problems
by: V. V. Turinskij
Published: (2015)
by: V. V. Turinskij
Published: (2015)
Research on game scheduling of galvanizing pipe production
by: Yingying Li, et al.
Published: (2017)
by: Yingying Li, et al.
Published: (2017)
Parallel machines scheduling to minimize the maximum deviation of the completion times of machines from a common due date
by: O. A. Pavlov, et al.
Published: (2014)
by: O. A. Pavlov, et al.
Published: (2014)
On Studying the Basic Constructive Parameters of Spatial Mechanisms of Machines with Two Working Containers for Parts Processing
by: M. G. Zaljubovskij, et al.
Published: (2020)
by: M. G. Zaljubovskij, et al.
Published: (2020)
Construction of a model of dynamics of production market processes in two-sector macroeconomics
by: N. D. Pankratova, et al.
Published: (2019)
by: N. D. Pankratova, et al.
Published: (2019)
Constructing a two-dimensional mosaic by means of one pattern
by: A. G. Donets, et al.
Published: (2016)
by: A. G. Donets, et al.
Published: (2016)
Algorithms for approximate multi-stage Flow-Shop-Problem solution
by: Ju. A. Zak
Published: (2019)
by: Ju. A. Zak
Published: (2019)
Automated Schedule System for Universities under the Bologna Education Process
by: K. Aida-Zade, et al.
Published: (2024)
by: K. Aida-Zade, et al.
Published: (2024)
Method of synchronous dataflow scheduling
by: A. M. Serhiienko, et al.
Published: (2016)
by: A. M. Serhiienko, et al.
Published: (2016)
Mathematical Model of One-Channel Queueing System with Two-Stage Remand Arrival
by: L. A. Votiakova, et al.
Published: (2020)
by: L. A. Votiakova, et al.
Published: (2020)
Mathematical Model of One-Channel Queueing System with Two-Stage Remand Arrival
by: Вотякова, Леся, et al.
Published: (2020)
by: Вотякова, Леся, et al.
Published: (2020)
Breakthrough from macro- to nanoscale of machines and pressures processing in the new generation metal production
by: Ju. N. Stasovskij
Published: (2014)
by: Ju. N. Stasovskij
Published: (2014)
Stochastic simulation of underground coal extraction schedule
by: Merzlikin, A.V., et al.
Published: (2022)
by: Merzlikin, A.V., et al.
Published: (2022)
Two-Stage Technology for Palm Oil Fractionation for Production of Cocoa Butter Substitutes
by: I. H. Radziievska, et al.
Published: (2018)
by: I. H. Radziievska, et al.
Published: (2018)
Production of cooligomers from S9 fraction by two-stage thermal-catalytic method
by: Ya. Gnativ, et al.
Published: (2014)
by: Ya. Gnativ, et al.
Published: (2014)
Metalearning as One of the Task of the Machine Learning Problems
by: Savchenko, Ye.A., et al.
Published: (2019)
by: Savchenko, Ye.A., et al.
Published: (2019)
Metalearning as One of the Task of the Machine Learning Problems
by: Ye. A. Savchenko, et al.
Published: (2019)
by: Ye. A. Savchenko, et al.
Published: (2019)
On the Main Constructive Parameters of Seven-Link Spatial Mechanism of Machine for Machining of Parts
by: M. G. Zaljubovskij, et al.
Published: (2020)
by: M. G. Zaljubovskij, et al.
Published: (2020)
Fluid models of dynamic scheduling in computer networks
by: Іgnatenko, O.P.
Published: (2025)
by: Іgnatenko, O.P.
Published: (2025)
Improving the efficiency of building projects by design model scheduling
by: A. V. Usov, et al.
Published: (2011)
by: A. V. Usov, et al.
Published: (2011)
Problems of fuzzy-linear programming with two-sided constraints and parameters of objective functions and constraints in the form of fuzzy sets
by: Ju. A. Zak
Published: (2018)
by: Ju. A. Zak
Published: (2018)
Contact Center Load Forecasting and Operator Schedule Planning
by: K. O. Chernichenko, et al.
Published: (2016)
by: K. O. Chernichenko, et al.
Published: (2016)
Overview of the Production of Casting Machines in the World and Examples of the Use of Robots in Casting Processes
by: V. A. Hnatush, et al.
Published: (2019)
by: V. A. Hnatush, et al.
Published: (2019)
Allowance for the construction of windings of asynchronous machine in Matlab modeling
by: O. A. Zakharzhevskij, et al.
Published: (2014)
by: O. A. Zakharzhevskij, et al.
Published: (2014)
The analysis of statistical characteristics and modeling of schedules of electric loadings with the account non-stationary process of electrosupply
by: Mikolaenko V.M.
Published: (2005)
by: Mikolaenko V.M.
Published: (2005)
Contact Center Load Forecasting and Operator Schedule Planning
by: Chernichenko, K.O., et al.
Published: (2018)
by: Chernichenko, K.O., et al.
Published: (2018)
About One Machine Learning Method For Paraphrase Identification
by: O. O. Marchenko, et al.
Published: (2016)
by: O. O. Marchenko, et al.
Published: (2016)
Optimal scheduling of operating modes of the gas transmission system
by: N. Prytula, et al.
Published: (2017)
by: N. Prytula, et al.
Published: (2017)
One-Point Discontinuities of Separately Continuous Functions on the Product of Two Compact Spaces
by: Mykhailyuk, V. V., et al.
Published: (2005)
by: Mykhailyuk, V. V., et al.
Published: (2005)
Stone Temples of Yuryev: Planning and Stages of Construction
by: M. V. Kvitnitskij
Published: (2020)
by: M. V. Kvitnitskij
Published: (2020)
Dynamical task scheduling in the heterogeneous system with the real time limitations
by: V. P. Simonenko, et al.
Published: (2016)
by: V. P. Simonenko, et al.
Published: (2016)
Simulated annealing approach for outpatient scheduling in a haemodialysis unit
by: A. Sundar, et al.
Published: (2022)
by: A. Sundar, et al.
Published: (2022)
TWO STAGE DIGESTION OF FOOD WASTE
by: Chetveryk, H.
Published: (2022)
by: Chetveryk, H.
Published: (2022)
Game-theory analysis of multi-processor schedulers. Simulation model
by: O. P. Ihnatenko, et al.
Published: (2018)
by: O. P. Ihnatenko, et al.
Published: (2018)
Forecasting of daily schedules of overall electricity imbalances IPS of Ukraine
by: V. V. Sychova
Published: (2022)
by: V. V. Sychova
Published: (2022)
The DABC and TLBO Algorithms for Solve Job Shop Scheduling Problem
by: T. Witkowski
Published: (2019)
by: T. Witkowski
Published: (2019)
Parallel Genetic Algorithm to Solve Scheduling the University Class Problem
by: M. M. Hlybovets, et al.
Published: (2015)
by: M. M. Hlybovets, et al.
Published: (2015)
Game-theory analysis of multi-processor schedulers. Simulation model
by: Ignatenko, O.P., et al.
Published: (2018)
by: Ignatenko, O.P., et al.
Published: (2018)
A genetic method for solving the problem on educational classes scheduling
by: Федорченко, Є. М., et al.
Published: (2024)
by: Федорченко, Є. М., et al.
Published: (2024)
Similar Items
-
Modified ACO Algorithm for Construction of Contracts Execution Schedule
by: H. V. Oliinyk, et al.
Published: (2017) -
Development and implementation of metaheuristic algorithms for solving independent machine scheduling problems
by: V. V. Turinskij
Published: (2015) -
Research on game scheduling of galvanizing pipe production
by: Yingying Li, et al.
Published: (2017) -
Parallel machines scheduling to minimize the maximum deviation of the completion times of machines from a common due date
by: O. A. Pavlov, et al.
Published: (2014) -
On Studying the Basic Constructive Parameters of Spatial Mechanisms of Machines with Two Working Containers for Parts Processing
by: M. G. Zaljubovskij, et al.
Published: (2020)