Peculiarities of welding and control in manufacture of heat-exchange modules of boiler-utiliser of steam-gas electric station of 150 MW capacity
Saved in:
| Date: | 2015 |
|---|---|
| Main Authors: | A. K. Tsarjuk, V. P. Elagin, E. A. Davydov, A. R. Gavrik, A. I. Pasechnik, S. A. Polonets, V. G. Dedov, V. P. Gorelov |
| Format: | Article |
| Language: | English |
| Published: |
2015
|
| Series: | Automatic Welding |
| Online Access: | http://jnas.nbuv.gov.ua/article/UJRN-0000467904 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Journal Title: | Library portal of National Academy of Sciences of Ukraine | LibNAS |
Institution
Library portal of National Academy of Sciences of Ukraine | LibNASSimilar Items
Modernization of Water-Heating Boilers with Capacity up to 1 MW
by: Ja. Sigal, et al.
Published: (2010)
by: Ja. Sigal, et al.
Published: (2010)
Manufacture of the combined welded-forged medium-pressure rotor for 325 mW steam turbine
by: A. K. Tsarjuk, et al.
Published: (2012)
by: A. K. Tsarjuk, et al.
Published: (2012)
The Increasing Duration of Operation of Boiler Houses and Heat Electro Power Stations above 12 MW in Ukraine
by: Ja. Sigal, et al.
Published: (2015)
by: Ja. Sigal, et al.
Published: (2015)
Hard tube pulser for 150 MW klystron
by: Bak, P.A., et al.
Published: (1999)
by: Bak, P.A., et al.
Published: (1999)
Reconstruction of base mine steam-boiler room in mini thermal electric central in the conditions of integration with gas piston power-station
by: L. M. Lukach, et al.
Published: (2010)
by: L. M. Lukach, et al.
Published: (2010)
The contribution of Academician V. Shukhov for the development of steam boilers
by: O. Aleksandrov
Published: (2018)
by: O. Aleksandrov
Published: (2018)
The analysis of temperature field of rotor of turbogenerator capacity 300 mw at asymmetry of cooling of grooving zone
by: K. A. Kuchinskij
Published: (2013)
by: K. A. Kuchinskij
Published: (2013)
Reconstruction and Modernization of Water-Heating and Steam Boilers in Heat-Systems (Review)
by: E. M. Lavrentsov, et al.
Published: (2012)
by: E. M. Lavrentsov, et al.
Published: (2012)
Losses of exergetic capacity in the air heater of the heat-utilization system of the boiler installation
by: N. M. Fialko, et al.
Published: (2019)
by: N. M. Fialko, et al.
Published: (2019)
Computational experiment for determination of steam boiler drum cyclic durability
by: B. D. Drobenko
Published: (2012)
by: B. D. Drobenko
Published: (2012)
Gas-steam mini-heating plant based on industrial boilers and gas turbines
by: Reysig V.A., et al.
Published: (2004)
by: Reysig V.A., et al.
Published: (2004)
Reclamation of Waste Oil Refining Materials in a Steam-Boiler of Oils and Fats Factories
by: A. A. Sobchenko, et al.
Published: (2012)
by: A. A. Sobchenko, et al.
Published: (2012)
Interval models of temperature characteristics of superheater separators in nuclear power plant units with the capacity of 1000 MW
by: Yefimov, O.V., et al.
Published: (2022)
by: Yefimov, O.V., et al.
Published: (2022)
Strategic Audit of Resource Utilisation and Management Efficiency in the National Economy
by: Shmygol, Nadiia, et al.
Published: (2025)
by: Shmygol, Nadiia, et al.
Published: (2025)
Complex Assessment of Efficiency of Regional Systems of Solid Waste Utilisation
by: M. S. Samoilik
Published: (2014)
by: M. S. Samoilik
Published: (2014)
Studying of the Operation Steam Chemical Cleaning of Boiler TGMP-344A of Minsk TPP-4
by: J. S. Misak, et al.
Published: (2017)
by: J. S. Misak, et al.
Published: (2017)
Principal Modernization Solutions for a 300 MW Power Unit to be Converted to Operate at Ultra-Supercritical Steam Parameters
by: A. O. Kostikov, et al.
Published: (2021)
by: A. O. Kostikov, et al.
Published: (2021)
Development of flow parts of cogeneration turbines with a capacity of 2.5 and 5 MW using modern computer technology
by: R. A. Rusanov, et al.
Published: (2015)
by: R. A. Rusanov, et al.
Published: (2015)
Technology for repair welding of boiler assemblies without post-weld heat treatment
by: A. K. Tsarjuk, et al.
Published: (2012)
by: A. K. Tsarjuk, et al.
Published: (2012)
Reserves energy saving under the automated control of powerful ventilators of the steam boilers of power plants
by: Kanyuk G., et al.
Published: (2017)
by: Kanyuk G., et al.
Published: (2017)
Reserves energy saving under the automated control of powerful ventilators of the steam boilers of power plants
by: G. I. Kanjuk, et al.
Published: (2017)
by: G. I. Kanjuk, et al.
Published: (2017)
Calculation of Performance of Coal-pulverisation Systems of Boilers TTP-312 in 300 mW Power Units by Burning of Non-Project Fuels
by: S. Y. Mysak
Published: (2015)
by: S. Y. Mysak
Published: (2015)
Principal Modernization Solutions for a 300 MW Power Unit to be Converted to Operate at Ultra-Supercritical Steam Parameters
by: Костиков, А. О., et al.
Published: (2022)
by: Костиков, А. О., et al.
Published: (2022)
Principal Modernization Solutions for a 300 MW Power Unit to be Converted to Operate at Ultra-Supercritical Steam Parameters
by: Костиков, А. О., et al.
Published: (2022)
by: Костиков, А. О., et al.
Published: (2022)
Selection of technology of repair welding of parts of turbine units
by: A. K. Tsarjuk, et al.
Published: (2017)
by: A. K. Tsarjuk, et al.
Published: (2017)
Development of flow parts of cogeneration turbines with a capacity of 2.5 and 5 MW using modern computer technology
by: Русанов, Р. А., et al.
Published: (2015)
by: Русанов, Р. А., et al.
Published: (2015)
Development of flow parts of cogeneration turbines with a capacity of 2.5 and 5 MW using modern computer technology
by: Русанов, Р. А., et al.
Published: (2015)
by: Русанов, Р. А., et al.
Published: (2015)
Methodological approaches to production of land utilisation technological documentation on partition and merging of land plots
by: O. Dorosh
Published: (2015)
by: O. Dorosh
Published: (2015)
Method of manufacturing sets of permeable elements with specified throughput capacity for capillary control leaks
by: A. V. Shulzhenko, et al.
Published: (2011)
by: A. V. Shulzhenko, et al.
Published: (2011)
Low-cycle fatigue and cracking resistance of power plant boiler pipes and steam lines of 12Kh1MF steel
by: Zelenskii, V.G., et al.
Published: (1985)
by: Zelenskii, V.G., et al.
Published: (1985)
Application of energy approach to the evaluation of serviceability of a steam boiler drum under thermal cycling and hydrogenation
by: O. V. Hembara, et al.
Published: (2017)
by: O. V. Hembara, et al.
Published: (2017)
Overview of carbon capture, utilisation and storage technologies to ensure low-carbon development of energy systems
by: Ye. V. Shcherbyna, et al.
Published: (2022)
by: Ye. V. Shcherbyna, et al.
Published: (2022)
Overview of carbon capture, utilisation and storage technologies to ensure low-carbon development of energy systems
by: Shcherbyna, Yevhen, et al.
Published: (2022)
by: Shcherbyna, Yevhen, et al.
Published: (2022)
Determining the reserve capacity of thermal and hydroelectric power stations for frequency and power flows regulation in ISP of Ukraine
by: O. S. Yandulskyi, et al.
Published: (2020)
by: O. S. Yandulskyi, et al.
Published: (2020)
The fuel economicity of coheneration-heat pump technologies on the basis of gas turbine installations in medium capacity boiler-houses
by: B. D. Bileka, et al.
Published: (2018)
by: B. D. Bileka, et al.
Published: (2018)
Modernization of Gas Boilers of TPP, CHP and Boilers Rooms to the EU Directive Ecological Requirements
by: Ya. Sihal, et al.
Published: (2017)
by: Ya. Sihal, et al.
Published: (2017)
Re-Extension of 200 MW Turbine Cast Casing Service
by: Yu. Chernousenko, et al.
Published: (2019)
by: Yu. Chernousenko, et al.
Published: (2019)
Re-Extension of 200 MW Turbine Cast Casing Service
by: Chernousenko, O.Yu., et al.
Published: (2019)
by: Chernousenko, O.Yu., et al.
Published: (2019)
Re-Extension of 200 MW Turbine Cast Casing Service
by: Chernousenko, O. Yu., et al.
Published: (2019)
by: Chernousenko, O. Yu., et al.
Published: (2019)
Re-Extension of 200 MW Turbine Cast Casing Service
by: Chernousenko, O. Yu., et al.
Published: (2019)
by: Chernousenko, O. Yu., et al.
Published: (2019)
Similar Items
-
Modernization of Water-Heating Boilers with Capacity up to 1 MW
by: Ja. Sigal, et al.
Published: (2010) -
Manufacture of the combined welded-forged medium-pressure rotor for 325 mW steam turbine
by: A. K. Tsarjuk, et al.
Published: (2012) -
The Increasing Duration of Operation of Boiler Houses and Heat Electro Power Stations above 12 MW in Ukraine
by: Ja. Sigal, et al.
Published: (2015) -
Hard tube pulser for 150 MW klystron
by: Bak, P.A., et al.
Published: (1999) -
Reconstruction of base mine steam-boiler room in mini thermal electric central in the conditions of integration with gas piston power-station
by: L. M. Lukach, et al.
Published: (2010)