Some Issues on Dismantling of Main Equipment during NPP Decommissioning
Saved in:
| Date: | 2015 |
|---|---|
| Main Authors: | A. V. Korolev, Kh. Ju. Chzhou |
| Format: | Article |
| Language: | English |
| Published: |
2015
|
| Series: | Nuclear and Radiation Safety (Scientific and technical journa) |
| Online Access: | http://jnas.nbuv.gov.ua/article/UJRN-0000485237 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Journal Title: | Library portal of National Academy of Sciences of Ukraine | LibNAS |
Institution
Library portal of National Academy of Sciences of Ukraine | LibNASSimilar Items
Training of Experts on NPP Decommissioning
by: A. V. Nosovskij, et al.
Published: (2015)
by: A. V. Nosovskij, et al.
Published: (2015)
In¬Situ Disposal as Decommissioning Option for Chornobyl NPP Facilities
by: D. A. Stelmakh, et al.
Published: (2016)
by: D. A. Stelmakh, et al.
Published: (2016)
Modern practice of cost estimates for the NPP units decommissioning
by: A. N. Masko, et al.
Published: (2014)
by: A. N. Masko, et al.
Published: (2014)
Updating of Decommissioning Conception of operating NPP's in Ukraine
by: V. M. Vasylchenko, et al.
Published: (2014)
by: V. M. Vasylchenko, et al.
Published: (2014)
Analysis of Chronobyl NPP Actual Costs Using International Structure for Decommissioning Costing
by: D. A. Stelmakh, et al.
Published: (2018)
by: D. A. Stelmakh, et al.
Published: (2018)
Assessment of the dose load during the dismantling of the WWR-M reactor
by: Yu. M. Lobach, et al.
Published: (2022)
by: Yu. M. Lobach, et al.
Published: (2022)
Assessment of the Shelter Structures to Be Dismantled after NSC Installation. Comparative Analysis of Dismantling Options
by: Yu. I. Nemchynov, et al.
Published: (2019)
by: Yu. I. Nemchynov, et al.
Published: (2019)
Prospective conditions of the decommissioning of power units of the Ukrainian NPP with regard for the requirements of the EU and IAEA
by: Shulzhenko S.V., et al.
Published: (2017)
by: Shulzhenko S.V., et al.
Published: (2017)
Prospective conditions of the decommissioning of power units of the Ukrainian NPP with regard for the requirements of the EU and IAEAl power system
by: S. V. Shulzhenko, et al.
Published: (2017)
by: S. V. Shulzhenko, et al.
Published: (2017)
Simulation of the radiation situation during the "early” dismantling of the building structures of the Shelter object
by: O. V. Balan, et al.
Published: (2021)
by: O. V. Balan, et al.
Published: (2021)
An estimation of expedient level of a special raise to the tariff on electricity of NPP of Ukraine for providing of implementation of works for decommissioning
by: Shulzhenko S.V.
Published: (2013)
by: Shulzhenko S.V.
Published: (2013)
Prospective directions of increasing operating reliability and providing operational management of the npp main equipment resources
by: I. H. Sharaievskyi, et al.
Published: (2021)
by: I. H. Sharaievskyi, et al.
Published: (2021)
3D modeling of radiation conditions and dose rates for personnel during dismantling of the roof structures of the Shelter object
by: Pashynov, M., et al.
Published: (2020)
by: Pashynov, M., et al.
Published: (2020)
Determination of the radiation situation in the areas of unstable structures dismantling of the Shelter object
by: L. I. Pavlovskyi, et al.
Published: (2022)
by: L. I. Pavlovskyi, et al.
Published: (2022)
Principal provisions of the decommissioning concept for the WWR-M research reactor
by: Yu. M. Lobach, et al.
Published: (2021)
by: Yu. M. Lobach, et al.
Published: (2021)
On the issue of improving reliability of the welded joints in mining equipment
by: Ju. Makeev, et al.
Published: (2015)
by: Ju. Makeev, et al.
Published: (2015)
Improvement of Fracture Resistance Calculation Procedure for NPP Primary Equipment Components
by: V. V. Kharchenko, et al.
Published: (2019)
by: V. V. Kharchenko, et al.
Published: (2019)
Determination of areas with high stresses impacting on dismantling drift stability in a zone with winning operations
by: G. A. Simanovich, et al.
Published: (2014)
by: G. A. Simanovich, et al.
Published: (2014)
Preliminary safety analysis at the decommissioning of the WWR-M research reactor
by: M. LobachYu., et al.
Published: (2022)
by: M. LobachYu., et al.
Published: (2022)
Water hammers in transonic modes of steam¬liquid flows in NPP equipment
by: V. Skalozubov, et al.
Published: (2019)
by: V. Skalozubov, et al.
Published: (2019)
Residual life of NPP reactor equipment exposed to high-temperature and radiation fields
by: V. A. Pukhlij
Published: (2011)
by: V. A. Pukhlij
Published: (2011)
Comparative analysis of updated concepts of decommissioning of operating nuclear power plants
by: O. A. Purtov, et al.
Published: (2019)
by: O. A. Purtov, et al.
Published: (2019)
Operational diagnostics of main equipment APP
by: Sharayevskij G.S., et al.
Published: (2009)
by: Sharayevskij G.S., et al.
Published: (2009)
Issues of vibration diagnosis of rolling mill equipment
by: V. V. Verenev, et al.
Published: (2018)
by: V. V. Verenev, et al.
Published: (2018)
Effect of getter additions on hydrogen- induced embrittlement of welded joints on structural materials of NPP equipment
by: V. M. Azhazha, et al.
Published: (2010)
by: V. M. Azhazha, et al.
Published: (2010)
Problems and means of formation of radiation fields for functional tests and qualifications of the NPP electrical equipment
by: I. A. Khomych, et al.
Published: (2019)
by: I. A. Khomych, et al.
Published: (2019)
Some research results by risk-inform approaches for NPP safety and operational efficiency
by: Ju. A. Komarov
Published: (2013)
by: Ju. A. Komarov
Published: (2013)
Assessment of the necessary expenses and estimation of the financial support for decommissioning the nuclear power plants in Ukraine
by: Kostyukovskyi B.A., et al.
Published: (2011)
by: Kostyukovskyi B.A., et al.
Published: (2011)
Some problematic issues of delineation of judicial jurisdictions in modern conditions
by: Kh. A. Dzhavadov
Published: (2017)
by: Kh. A. Dzhavadov
Published: (2017)
Vulnerability Analysis of Pipelines and Equipment of the Existing NPP Power Units with VVER-1000 under Vibrations Caused by the Aircraft Crash
by: L. B. Shamis, et al.
Published: (2017)
by: L. B. Shamis, et al.
Published: (2017)
Clarification of the latent factors that require preventive action of specialized feedwater system of NPP's equipment
by: O. V. Derevjanko
Published: (2014)
by: O. V. Derevjanko
Published: (2014)
Simulation study of the digital temperature sensor operation in case of a non-standard mechanical impact of the NPP equipment
by: Bikovsky, Y.M., et al.
Published: (2020)
by: Bikovsky, Y.M., et al.
Published: (2020)
State-Of-The-Art Ukrainian Equipment for Machine Welding of High-Pressure Pipelines of the Second Loop of Npp Units of Ukraine
by: L. M. Lobanov, et al.
Published: (2018)
by: L. M. Lobanov, et al.
Published: (2018)
On-line diagnostics of equipment in main gas pipelines systems Language: Russian
by: Linetsky I.K., et al.
Published: (2001)
by: Linetsky I.K., et al.
Published: (2001)
Categorical properties of some algorithms of differentiation for equipped posets
by: Gaviria, I. D. M., et al.
Published: (2022)
by: Gaviria, I. D. M., et al.
Published: (2022)
Issue of economy during Bronze Age on the territory of Lenchyn-Vlodava lakes region
by: H. Taras, et al.
Published: (2012)
by: H. Taras, et al.
Published: (2012)
Models of reliability assessing of electricity supply of auxiliary NPP from external sources with fuzzy defined parameters of failures of equipments
by: Ye. I. Bardyk
Published: (2014)
by: Ye. I. Bardyk
Published: (2014)
The Main Features of Religious Issues in F. M. Dostoevsky
by: I. N. Melnichuk
Published: (2011)
by: I. N. Melnichuk
Published: (2011)
Some issues in the nuclear energy sector of Ukraine
by: A. V. Nosovskyi
Published: (2020)
by: A. V. Nosovskyi
Published: (2020)
Eugenics: some issues of legal regulation
by: L. H. Vardanian
Published: (2016)
by: L. H. Vardanian
Published: (2016)
Similar Items
-
Training of Experts on NPP Decommissioning
by: A. V. Nosovskij, et al.
Published: (2015) -
In¬Situ Disposal as Decommissioning Option for Chornobyl NPP Facilities
by: D. A. Stelmakh, et al.
Published: (2016) -
Modern practice of cost estimates for the NPP units decommissioning
by: A. N. Masko, et al.
Published: (2014) -
Updating of Decommissioning Conception of operating NPP's in Ukraine
by: V. M. Vasylchenko, et al.
Published: (2014) -
Analysis of Chronobyl NPP Actual Costs Using International Structure for Decommissioning Costing
by: D. A. Stelmakh, et al.
Published: (2018)