Determination of causes of crack initiation in design elements of tower of new ventilation pipe at Chernobyl NPP
Saved in:
| Date: | 2014 |
|---|---|
| Main Authors: | V. M. Torop, E. F. Garf, A. V. Jakimkin, E. E. Gopkalo |
| Format: | Article |
| Language: | English |
| Published: |
2014
|
| Series: | Automatic Welding |
| Online Access: | http://jnas.nbuv.gov.ua/article/UJRN-0000463231 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Journal Title: | Library portal of National Academy of Sciences of Ukraine | LibNAS |
Institution
Library portal of National Academy of Sciences of Ukraine | LibNASSimilar Items
Examination of tubular metal structures of frame elements of Chernobyl NPP ventilation pipe
by: V. A. Troitskij, et al.
Published: (2014)
by: V. A. Troitskij, et al.
Published: (2014)
Results of studying the causes for cracking in titanium alloy blades of steam turbines of K-1000-60/3000 type
by: V. M. Torop, et al.
Published: (2018)
by: V. M. Torop, et al.
Published: (2018)
40 years of welded structure of Kiev TV tower
by: L. M. Lobanov, et al.
Published: (2014)
by: L. M. Lobanov, et al.
Published: (2014)
Current hydrobiological and radioecological state of the Chernobyl NPP cooling pond
by: D. I. Gudkov, et al.
Published: (2015)
by: D. I. Gudkov, et al.
Published: (2015)
Crack initiation on inner surface of piping at high temperatures. Information 1. Thermal load on pipe walls at starting and in service
by: S. A. Nedoseka, et al.
Published: (2015)
by: S. A. Nedoseka, et al.
Published: (2015)
Stages of nuclear energy development after Chernobyl accident (To the 30th anniversary of Chernobyl NPP accident)
by: I. M. Vyshnevskyi, et al.
Published: (2016)
by: I. M. Vyshnevskyi, et al.
Published: (2016)
Modeling a circumferential crack in pipe area of a flat bottom of thick-walled pressure vessel
by: V. V. Kyrychok, et al.
Published: (2019)
by: V. V. Kyrychok, et al.
Published: (2019)
Multiplicative orders of elements in Conway's towers of finite fields
by: Popovych, Roman
Published: (2018)
by: Popovych, Roman
Published: (2018)
Restrictions on the order of elements in Conway towers of finite fields
by: R. B. Popovych
Published: (2015)
by: R. B. Popovych
Published: (2015)
Multiplicative orders of elements in Conway's towers of finite fields
by: Popovych, R.
Published: (2018)
by: Popovych, R.
Published: (2018)
Calculation of static strength resistance to brittle fracture and cyclic crack resistance of steel pipe NPP not im-portant to safety
by: T. I. Matchenko, et al.
Published: (2015)
by: T. I. Matchenko, et al.
Published: (2015)
Fatigue of NPP Components and Piping under Service Conditions
by: Filatov, V.M.
Published: (2004)
by: Filatov, V.M.
Published: (2004)
Once more on the character of the 4th block of Chernobyl NPP explosion
by: N. V. Kravchuk
Published: (2010)
by: N. V. Kravchuk
Published: (2010)
Technogenic radionuclides of Chernobyl NPP accidental release and their physical and chemical forms
by: A. I. Lypska, et al.
Published: (2015)
by: A. I. Lypska, et al.
Published: (2015)
Crack initiation on pipeline inner surface in high-temperature service. Information 2. Stresses in pipe walls
by: S. A. Nedoseka, et al.
Published: (2015)
by: S. A. Nedoseka, et al.
Published: (2015)
Crack initiation on inner surface of pipelines at high temperatures. Information 3. Temperature and stresses in pipe wall at cooling
by: Ja. Nedoseka, et al.
Published: (2016)
by: Ja. Nedoseka, et al.
Published: (2016)
Automatic arc welding in manufacture and renovation repair of pipe elements of spirals of high-pressure heaters of NPP power units
by: L. M. Lobanov, et al.
Published: (2020)
by: L. M. Lobanov, et al.
Published: (2020)
Account for pore formation in heat treatment of welded elements of steels, prone to initiation of temper cracks
by: V. I. Makhnenko, et al.
Published: (2013)
by: V. I. Makhnenko, et al.
Published: (2013)
Kinetics of growth of corrosion cracks in pipe steel 17G1S
by: V. I. Makhnenko, et al.
Published: (2010)
by: V. I. Makhnenko, et al.
Published: (2010)
Problematic issues of thermophysics of initial emergency events of the Chernobyl disaster
by: I. G. Sharaevskij, et al.
Published: (2016)
by: I. G. Sharaevskij, et al.
Published: (2016)
Towers and tower-like buildings of Chernihiv of Old Rus period
by: O. Shuhalii
Published: (2023)
by: O. Shuhalii
Published: (2023)
Oscillating heat pipe cooler for heat-generating elements of electronics
by: E. S. Alekseik, et al.
Published: (2013)
by: E. S. Alekseik, et al.
Published: (2013)
Assessment of forms finding of Chernobyl radionuclides in bottom sediments of cooling pond of the ChNPP
by: V. P. Protsak, et al.
Published: (2014)
by: V. P. Protsak, et al.
Published: (2014)
Prevention of failures on ventilators of main ventilation in a cold period of year
by: Sh. Zhalilov
Published: (2016)
by: Sh. Zhalilov
Published: (2016)
Comparative assessment of the sorption properties of carbon filters used in the ventilation system of NPP, using 131I and 127I
by: V. V. Levenets, et al.
Published: (2017)
by: V. V. Levenets, et al.
Published: (2017)
Estimation of stresses caused by electrochemical hydrogenation of pipe carbon steel
by: O. I. Zvirko, et al.
Published: (2024)
by: O. I. Zvirko, et al.
Published: (2024)
New LED lamp design with heat pipes
by: D. V. Pekur, et al.
Published: (2019)
by: D. V. Pekur, et al.
Published: (2019)
The effect of high tower
by: V. Morenets
Published: (2016)
by: V. Morenets
Published: (2016)
The effect of high tower
by: V. Morenets
Published: (2016)
by: V. Morenets
Published: (2016)
Estimation of the periods of creep-fatigue crack initiation and growth in thin-walled structural elements
by: Ye. Andreikiv, et al.
Published: (2011)
by: Ye. Andreikiv, et al.
Published: (2011)
CFD model as a digital twin of the radiation state of the new safe confinement of the chernobyl NPP
by: Krukovskyi, P.G., et al.
Published: (2020)
by: Krukovskyi, P.G., et al.
Published: (2020)
New approach to simulation of extra-power solar plant with power evacuation by networks of the Chernobyl NPP
by: L. Lukianenko, et al.
Published: (2020)
by: L. Lukianenko, et al.
Published: (2020)
A finding of Ponto-Caspian species of isopod Jaera sarsi in Chernobyl NPP water body
by: A. A. Silaeva, et al.
Published: (2018)
by: A. A. Silaeva, et al.
Published: (2018)
Estimation of radiation conditions for construction of the storage of high-active waste in the turbine hall Chernobyl NPP
by: O. V. Balan, et al.
Published: (2018)
by: O. V. Balan, et al.
Published: (2018)
Transformation shallow habitats vegetation cover of the Chernobyl NPP cooling reservoir due to its descent
by: T. M. Diachenko, et al.
Published: (2021)
by: T. M. Diachenko, et al.
Published: (2021)
Analysis of Possible Causes of NPP Emergencies to Minimize Risk of Their Occurrence
by: O. O. Popov, et al.
Published: (2019)
by: O. O. Popov, et al.
Published: (2019)
Improving Safety and Economic Feasibility of NPP by Management of Secondary Side Piping Life
by: V. P. Kravchenko
Published: (2017)
by: V. P. Kravchenko
Published: (2017)
Biotic elements of NPP techno-ecosystem
by: A. A. Protasov, et al.
Published: (2013)
by: A. A. Protasov, et al.
Published: (2013)
Performance of hydraulic testing of piping of heat networks to achieve the specified reliability of their operation
by: V. M. Torop
Published: (2022)
by: V. M. Torop
Published: (2022)
On material and energy sources of formation of fuel-containing materials during Chernobyl NPP UNIT 4 accident
by: A. V. Mikhajlov
Published: (2016)
by: A. V. Mikhajlov
Published: (2016)
Similar Items
-
Examination of tubular metal structures of frame elements of Chernobyl NPP ventilation pipe
by: V. A. Troitskij, et al.
Published: (2014) -
Results of studying the causes for cracking in titanium alloy blades of steam turbines of K-1000-60/3000 type
by: V. M. Torop, et al.
Published: (2018) -
40 years of welded structure of Kiev TV tower
by: L. M. Lobanov, et al.
Published: (2014) -
Current hydrobiological and radioecological state of the Chernobyl NPP cooling pond
by: D. I. Gudkov, et al.
Published: (2015) -
Crack initiation on inner surface of piping at high temperatures. Information 1. Thermal load on pipe walls at starting and in service
by: S. A. Nedoseka, et al.
Published: (2015)