MAIN CONCEPTUAL SOLUTIONS AND METHODS OF THEIR IMPLEMENTATION WHEN CHANGING THE 300 MW ENERGY UNITS FROM BURNING ANTHRACITE CULM TO BURNING COAL OF THE GAS GROUP
 Various schemes have been developed for reconstructing the existing dust-system of the TPP-210A boiler of Unit № 4 of the Trypillia TPP with the discharge of the spent drying agent into the main burners (low-cost technologies) or into the cooling zone located above the pre-furnace and...
Gespeichert in:
| Datum: | 2018 |
|---|---|
| Автори та афіліації: |
|
| Ключові слова: | keywords |
| 1. Verfasser: | |
| Format: | Artikel |
| Sprache: | Russisch |
| Veröffentlicht: |
Institute of Renewable Energy National Academy of Sciences of Ukraine
2018
|
| Schlagworte: | |
| Online Zugang: | https://ve.org.ua/index.php/journal/article/view/2 |
| Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
| Назва журналу: | Vidnovluvana energetika |
| Завантажити файл: | |