Determination of parameters and basic dimensions of the generator for low power tidal plants (up to 1000 kW)
На основе анализа особенностей работы приливных электростанций определены возможные конструкции синхронныхгенераторов с возбуждением от постоянных магнитов и приведен расчет их основных геометрических соотношений....
Saved in:
| Date: | 2017 |
|---|---|
| Main Authors: | Permynov, Y., Kokhanevych, V., Shykhaylov, M., Permynova, S. |
| Format: | Article |
| Language: | Russian |
| Published: |
Institute of Renewable Energy National Academy of Sciences of Ukraine
2017
|
| Subjects: | |
| Online Access: | https://ve.org.ua/index.php/journal/article/view/42 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Journal Title: | Vidnovluvana energetika |
Institution
Vidnovluvana energetikaSimilar Items
COMPARISON OF THE TECHNICAL PARAMETERS OF WIND POWER PLANTS (WPP) AND TIDAL POWER PLANTS (TPP) USED IN AREAS WITH LOW NATURAL ENERGY POTENTIALS
by: Permynov, Y., et al.
Published: (2017)
by: Permynov, Y., et al.
Published: (2017)
Dynamics of tidal parameters depending on the landslide hazard condition of the salt mine roof
by: Kutnyi, A.M., et al.
Published: (2023)
by: Kutnyi, A.M., et al.
Published: (2023)
INTERACTION OF GRAVITY WAVES WITH TIDAL POWER PLANT
by: Voskoboinick, V., et al.
Published: (2020)
by: Voskoboinick, V., et al.
Published: (2020)
SMALL HYDROPOWER PLANTS AND EFFECTIVE HYDROPOWER UNITS FOR THESE PLANTS
by: Permynov, Y., et al.
Published: (2018)
by: Permynov, Y., et al.
Published: (2018)
AN ANTHOLOGY OF THE DISTINGUISHED ACHIEVEMENTS IN SCIENCE AND TECHNIQUE. PART 45: TRADITIONAL POWER ENGINEERING. HYDRAULIC POWER PLANTS: STATE AND PROSPECTS OF THEIR DEVELOPMENT
by: Baranov, M. I.
Published: (2018)
by: Baranov, M. I.
Published: (2018)
On some challenges of environmental impact assessment of small hydropower plants in Ukraine
by: Vlasiuk, Yurii S., et al.
Published: (2019)
by: Vlasiuk, Yurii S., et al.
Published: (2019)
Some critical comments on the quality of environmental impact assessment reports for small hydropower plants in Ukraine
by: Stefanyshyn, Dmytro V., et al.
Published: (2019)
by: Stefanyshyn, Dmytro V., et al.
Published: (2019)
REGULATORY ASPECTS OF USE HYDROENERGY POTENTIAL IN UKRAINE OF RETURN WATERSTOF TECHNOLOGICAL PROCESSES BY «GREEN» TARIFF AT THE GENERATED ELECTRICITY
by: Bryl, A., et al.
Published: (2021)
by: Bryl, A., et al.
Published: (2021)
3D SIMULATION OF HYDROMECHANICAL CHARACTERISTICS OF SMALL HYDROPOWER PLANTS
by: Moroz, A.
Published: (2020)
by: Moroz, A.
Published: (2020)
The mathematical model of probability determination technological capacity of small rivers
by: Moroz, A.
Published: (2018)
by: Moroz, A.
Published: (2018)
CURRENT STATE OF CONSTRUCTION OF SMALL HYDROPOWER STATIONS IN UKRAINE AND AN ASSESSMENT OF THE TECHNICAL POTENTIAL OF THEIR FURTHER DEVELOPMENT
by: Vasko, P., et al.
Published: (2018)
by: Vasko, P., et al.
Published: (2018)
Application of Sntinel-1 radar interferometric images for the monitoring of vertical displacements of the earth’s surface affected by non-tidal atmospheric loading
by: Tretyak, K.R., et al.
Published: (2023)
by: Tretyak, K.R., et al.
Published: (2023)
Оn peculiarities of hydropower development in the world and in Ukraine
by: Stefanyshyn, D.
Published: (2018)
by: Stefanyshyn, D.
Published: (2018)
Results and analysis of the Earth’s tidal observations in the territory of Ukraine
by: Kutniy, A. M., et al.
Published: (2015)
by: Kutniy, A. M., et al.
Published: (2015)
Energy aspect of capacity control of small hydropower plant by a water flow in accordance to various hydrological parameters
by: Ibragimova, M.
Published: (2016)
by: Ibragimova, M.
Published: (2016)
ENVIRONMENTAL ASPECTS OF HYDROPOWER DEVELOPMENT IN UKRAINE
by: Vasko, P., et al.
Published: (2018)
by: Vasko, P., et al.
Published: (2018)
Feasibility analysis of construction of new hydropower plants in Ukraine taking into account the risk of unused possibilities
by: Stefanyshyn, Dmytro V.
Published: (2019)
by: Stefanyshyn, Dmytro V.
Published: (2019)
FEATURES OF DESIGN THE PERMANENT MAGNET WINDGENERATOR OF HIGH POWER (600÷3600) kW
by: Permynov, Y., et al.
Published: (2020)
by: Permynov, Y., et al.
Published: (2020)
INVESTIGATION OF RESERVES FOR ENHANCING THE ENERGY EFFICIENCY OF A SMALL HYDROPOWER PLANT UNDER VARIATIONS IN TURBINE GENERATOR CURRENT FREQUENCY
by: Popovych, O., et al.
Published: (2025)
by: Popovych, O., et al.
Published: (2025)
Results and analysis of earth tide observations with the borehole tiltmeter in Poltava
by: Kutnyy, А. M., et al.
Published: (2016)
by: Kutnyy, А. M., et al.
Published: (2016)
Technological and operating features of the AR-1000 reactors Generation III+ and small modular reactors MR-160
by: Vashchenko, Volodymyr, et al.
Published: (2021)
by: Vashchenko, Volodymyr, et al.
Published: (2021)
DESIGN PERMANENT MAGNET WINDGENERATOR OF INCREASED POWER (600÷3600) KW
by: Permynov, Y., et al.
Published: (2020)
by: Permynov, Y., et al.
Published: (2020)
Development of the 500 kW and 1 MW ORC turbine flow parts
by: Rusanov, R., et al.
Published: (2017)
by: Rusanov, R., et al.
Published: (2017)
Development of the 500 kW and 1 MW ORC turbine flow parts
by: Rusanov, R., et al.
Published: (2017)
by: Rusanov, R., et al.
Published: (2017)
RENEWABLE ENERGY SOURCES IN ELECTRIC-POWER INDUSTRY OF NAKHCHIVAN AUTONOMOUS REPUBLIC
by: Rzayev, M. A., et al.
Published: (2018)
by: Rzayev, M. A., et al.
Published: (2018)
THE STRUCTURE OF ALTERNATIVE ENERGY. CHINESE EXPERIENCE
by: Nazyuta, L., et al.
Published: (2024)
by: Nazyuta, L., et al.
Published: (2024)
Modernization of domestic power machine-building – basic of power security of Ukraine
by: Мацевитый, Ю. М., et al.
Published: (2013)
by: Мацевитый, Ю. М., et al.
Published: (2013)
Modernization of domestic power machine-building – basic of power security of Ukraine
by: Мацевитый, Ю. М., et al.
Published: (2013)
by: Мацевитый, Ю. М., et al.
Published: (2013)
Selection of System Characteristic of Turbo-Compressor Package Based on Efficiency Analysis according to Full-Scale Test Results. P. III. Efficiency Research of Basic Systems of Turbo-Compressor Package GPA-C-6,3A/56-1,45 on Full-Scale Test Results
by: Щербаков, Н. С., et al.
Published: (2017)
by: Щербаков, Н. С., et al.
Published: (2017)
Selection of System Characteristic of Turbo-Compressor Package Based on Efficiency Analysis according to Full-Scale Test Results. P. III. Efficiency Research of Basic Systems of Turbo-Compressor Package GPA-C-6,3A/56-1,45 on Full-Scale Test Results
by: Щербаков, Н. С., et al.
Published: (2017)
by: Щербаков, Н. С., et al.
Published: (2017)
Test rig of OJSC «Turboatom» for physical simulation of hydrodynamic process in water passages of model Kaplan hydroturbines
by: Линник, А. В., et al.
Published: (2014)
by: Линник, А. В., et al.
Published: (2014)
Test rig of OJSC «Turboatom» for physical simulation of hydrodynamic process in water passages of model Kaplan hydroturbines
by: Линник, А. В., et al.
Published: (2014)
by: Линник, А. В., et al.
Published: (2014)
ANALYSIS OF ELECTRICITY CONSUMPTION OF INDUCTION MOTORS OF IE1 AND IE2 EFFICIENCY CLASSES IN A 11 kW PUMP INSTALLATION
by: Oshurbekov, S. Kh., et al.
Published: (2020)
by: Oshurbekov, S. Kh., et al.
Published: (2020)
ANALYSIS OF ENERGY PARAMETERS OF A CLOSED-CYCLE PUMPED STORAGE HYDROPOWER PLANT
by: Golovko , V., et al.
Published: (2025)
by: Golovko , V., et al.
Published: (2025)
ОСОБЛИВОСТІ ЗАСТОСУВАННЯ ЧИСЛОВОГО МЕТОДУ РІШЕННЯ МАТЕМАТИЧНОЇ МОДЕЛІ НЕСТАЦІОНАРНИХ ЕЛЕКТРОМЕХАНІЧНИХ ПРОЦЕСІВ У СИСТЕМІ ВІТРОЕЛЕКТРИЧНА УСТАНОВКА – ЕЛЕКТРОГІДРАВЛІЧНИЙ НАСОС СТАНЦІЇ ОПРІСНЕННЯ МОРСЬКОЇ ВОДИ
by: Vasko, P., et al.
Published: (2023)
by: Vasko, P., et al.
Published: (2023)
Assessment of Resource Parameters of the Extended Operation High-Pressure Rotor of the K-1000-60/3000 Turbine
by: Chernousenko, Olha Yu., et al.
Published: (2019)
by: Chernousenko, Olha Yu., et al.
Published: (2019)
Assessment of Resource Parameters of the Extended Operation High-Pressure Rotor of the K-1000-60/3000 Turbine
by: Chernousenko, Olha Yu., et al.
Published: (2019)
by: Chernousenko, Olha Yu., et al.
Published: (2019)
DEVELOPMENT AND APPLICATION OF THE ADJUSTABLE LOAD SHARING COEFFICIENTS METHOD FOR LOAD SHARING CONTROL BETWEEN PARALLEL OPERATING GENERATORS IN ISOLATED POWER GENERATION SYSTEMS
by: Mazurenko , L., et al.
Published: (2025)
by: Mazurenko , L., et al.
Published: (2025)
Step-up/step-down regulators in maximum power transmission mode
by: Romashko, V. Y., et al.
Published: (2022)
by: Romashko, V. Y., et al.
Published: (2022)
HEAT TESTS OF POWER CABLES WITH XLPE INSULATION AT DIRECT VOLTAGES UP TO 110 KV
by: Antonets, T. Yu., et al.
Published: (2015)
by: Antonets, T. Yu., et al.
Published: (2015)
Similar Items
-
COMPARISON OF THE TECHNICAL PARAMETERS OF WIND POWER PLANTS (WPP) AND TIDAL POWER PLANTS (TPP) USED IN AREAS WITH LOW NATURAL ENERGY POTENTIALS
by: Permynov, Y., et al.
Published: (2017) -
Dynamics of tidal parameters depending on the landslide hazard condition of the salt mine roof
by: Kutnyi, A.M., et al.
Published: (2023) -
INTERACTION OF GRAVITY WAVES WITH TIDAL POWER PLANT
by: Voskoboinick, V., et al.
Published: (2020) -
SMALL HYDROPOWER PLANTS AND EFFECTIVE HYDROPOWER UNITS FOR THESE PLANTS
by: Permynov, Y., et al.
Published: (2018) -
AN ANTHOLOGY OF THE DISTINGUISHED ACHIEVEMENTS IN SCIENCE AND TECHNIQUE. PART 45: TRADITIONAL POWER ENGINEERING. HYDRAULIC POWER PLANTS: STATE AND PROSPECTS OF THEIR DEVELOPMENT
by: Baranov, M. I.
Published: (2018)