SYNTHESIS GAS REGENERATION ELECTROTECHNOLOGY USING VOLUME HIGH-VOLTAGE PULSED DISCHARGES: CORONA AND BARRIER ONES

Factory testing of a created high-voltage complex (plant) has been conducted. The complex consists of two pulse generators with the repetition rate of up to 50,000 pulses per second and load reactors with pulsed discharges – corona and barrier ones. Transistor (IGBT) keys are used as energy switches...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Datum:2014
Hauptverfasser: Boyko, N. I., Yevdoshenko, L. S., Ivanov, V. M., Koniaga, S. F.
Format: Artikel
Sprache:Russian
Veröffentlicht: National Technical University "Kharkiv Polytechnic Institute" and Аnatolii Pidhornyi Institute of Power Machines and Systems of NAS of Ukraine 2014
Schlagworte:
Online Zugang:http://eie.khpi.edu.ua/article/view/2074-272X.2014.4.08
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Назва журналу:Electrical Engineering & Electromechanics

Institution

Electrical Engineering & Electromechanics
Beschreibung
Zusammenfassung:Factory testing of a created high-voltage complex (plant) has been conducted. The complex consists of two pulse generators with the repetition rate of up to 50,000 pulses per second and load reactors with pulsed discharges – corona and barrier ones. Transistor (IGBT) keys are used as energy switches. The efficient mode of coke gas methane conversion (steam reforming) to syngas has been obtained with application of the complex created. A unidirectional action of the pulsed discharges, the gas mixture temperature, and a nickel catalyst has reduced the specific energy consumption for synthesis gas regeneration during the conversion. A feasible mechanism of this conversion is described.